Timeline
  1. 28 Jul 2020Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 18 Dec 2020Registered with HARERAHARERA, read 4 Nov 2026
  3. 27 Jul 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside18,616 m² in all, by use
  • Roads10,208 m² · 55%
  • Plots for sale6,513 m² · 35%
  • Parking1,250 m² · 7%
  • Electricity sub-station250 m² · 1%
  • Other uses235 m² · 1%
  • Sewage and waste treatment160 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88, GurugramSector 88, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS3.8 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Central Boulevard registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/430/162/2020/46, registered on 18 Dec 2020. The register’s record shows an end date of 27 Jul 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Central Boulevard?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 27 Jul 2025. Its registration runs to 27 Jul 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Central Boulevard?From the records · Map pin and road lines, read 6 Sep 2026

Central Boulevard is in Sector 88, Gurugram; the site address declared to HARERA is Plotted Commercial- Sco , Village - Hayatpur Sector 88 Gurugram. In a straight line it is about 0.6 km from Dwarka Expressway, 3.8 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Central Boulevard?From the records · HARERA, read 4 Nov 2026

Central Boulevard is a Bestech Group project, registered by its company BESTECH INDIA PVT. LTD..

The source ↗Bestech Group's projects and court record

The records

What the registers hold for Central Boulevard: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/430/162/2020/46: Registration lapsed. The register’s record shows an end date of 27 Jul 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 18 OF 2020 is on the DTCP register: Licence lapsed; the register prints its validity to 27 Jul 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Jul 2020.Declared to HARERA, read 29 Oct 2026
The court record of Bestech Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 18 OF 2020 lapsed

    Named in this project’s application. Valid to 27 Jul 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 27 Jul 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
GGM/430/162/2020/46
Registration date
18 Dec 2020
Registration valid till
27 Jul 2025
Declared possession
27 Jul 2025

Declared by the promoter to HARERA

Land area
4.600 (Acre) (18,615.54 sq m)
FAR
the application prints 150, which is not a ratio
licence
18 OF 2020 Dated 28/07/2020
Estimated project cost
₹68.35 crore
Cost of land
₹16.17 crore
Layout plan, declared approved (field 5a)
28 Jul 2020
Construction to start
1 Jan 2021
Completion declared for
27 Jul 2025
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE NO 18 OF 2020 — declared: already been obtained (28 Jul 2020)
  • II. LAYOUT PLAN — declared: already been obtained (28 Jul 2020)
  • III. FOREST NOC — declared: already been obtained (2 Apr 2013)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan16 Oct 2020

Layout plan

1 file
Latest Layout Plan16 Oct 2020

Zoning plan

1 file
Zoning Plan21 Oct 2020

Demarcation plan

1 file
Demarcation Plan21 Oct 2020

Building plans

1 file
Approved Building Plans, Full Set23 Oct 2020

Services

Service plans

1 file
Service Plans on the Layout16 Oct 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule16 Oct 2020

Land records

Land records

2 files
Annexure- Summary of Collaboration Agreement15 Mar 2021Revenue Record Entry of Licence and Collaboration21 Oct 2020

Money

Accounts and finance

3 files
Cash Flow Statement15 Mar 2021Non-Default Certificate from a CA16 Oct 2020CA Certificate on the Application’s Figures16 Oct 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Mar 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

18 OF 2020 · Bestech India Pvt. Ltd · GURGAON-MANESAR

Licence valid to 27 Jul 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Oct 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

18 OF 2020: 8 parcels, 4.6 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 4.6 acres.

  • 63//13/24 kanal 18 marla
  • 63//14/14 kanal
  • 63//14/24 kanal
  • 63//158 kanal
Show the other 4 parcels
  • 63//17/1/12 kanal 10 marla
  • 63//17/2/13 kanal 10 marla
  • 63//188 kanal
  • 63//23/11 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 63//13/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,04,750 per sq yd

Sector 88, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan16 Oct 2020

Layout plan

1 file
Latest Layout Plan16 Oct 2020

Building plans

1 file
Approved Building Plans, Full Set23 Oct 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1463 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Bestech Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.