Skip to content

Godrej Icon [Iconic Tower]

by Oasis Landmarks · Sector 88, Gurugram

Not on our price list yet

Possession 31 Mar 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88, Gurugram0.6 km from Dwarka Expressway, in a straight linePrices and what changed
Home types
2, 3, 3.5, 4, 4.5, 5 and 6.5 BHK
Carpet area
about 950 sq ft
In m²about 88.3 m², the average flat, as declared
Registered
17 Aug 2017
Registered by
OASIS LANDMARKS LLPthe company that filed it, for Oasis Landmarks
Timeline
  1. 17 Aug 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 30 Apr 2020Registration valid toHARERA, read 4 Nov 2026
  3. 31 Mar 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenGranite counter with sink and CP fittings
  • LiftsStone architrave and italian marble flooring in CAR BODY and granite cladding
  • WardrobesNo wardrobe
  • FloorsVitrified tile or equivalent in living/dining, wooden flooring or equivalent in bedrooms, anti-skid tiles or equivalent in toilets, kitchen, balcony & utility
  • WallsAcrylic emulsion or equivalent in internal walls, oil bound distemper or equivalent in ceiling, weather proof or equivalent in external
  • BathroomsROCA perryware or equivalent
  • WindowsAnodized aluminium frame with annealed glass
  • Main doorMAIN door :- TEAK wood with veneer finish

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88, GurugramSector 88, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS3.8 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Godrej Icon [Iconic Tower] registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 54 OF 2017, registered on 17 Aug 2017. Ended 30 Apr 2020. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Godrej Icon [Iconic Tower]?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2025. Its registration runs to 30 Apr 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Godrej Icon [Iconic Tower]?From the records · Map pin and road lines, read 6 Sep 2026

Godrej Icon [Iconic Tower] is in Sector 88, Gurugram; the site address declared to HARERA is Sector 88a & 89a. In a straight line it is about 0.6 km from Dwarka Expressway, 3.8 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Godrej Icon [Iconic Tower]?From the records · HARERA, read 4 Nov 2026

Godrej Icon [Iconic Tower] is a Oasis Landmarks project, registered by its company OASIS LANDMARKS LLP.

The source ↗Oasis Landmarks's projects and court record

The records

What the registers hold for Godrej Icon [Iconic Tower]: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 54 OF 2017: Registration expired. Ended 30 Apr 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 85 OF 2013 is on the DTCP register, valid to 9 Oct 2029.DTCP, read 3 Nov 2026
The court record of Oasis Landmarks’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Apr 2020. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 41 HARERA files, with the dates we read them
Registration no.
54 OF 2017
Registration date
17 Aug 2017
Registration valid till
30 Apr 2020
Declared possession
31 Mar 2025

Declared by the promoter to HARERA

Land area
0.475 (Acre) (1,922.26 sq m)
FAR
the application prints 175, which is not a ratio
licence
85 of 2013(10-10-2013), 151 of 2014(05-09-2014)
Estimated project cost
₹134.85 crore
Cost of land
₹12.60 crore
Completion declared for
31 Mar 2025
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 5 BHK · 72 units · 6,530.83 sq m carpet · total for 72 flats, about 90.7 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 6.5 BHK · 60 units · 4,844.75 sq m carpet · total for 60 flats, about 80.7 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4 BHK · 60 units · 4,866.75 sq m carpet · total for 60 flats, about 81.1 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4.5 BHK · 60 units · 4,899.72 sq m carpet · total for 60 flats, about 81.7 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3.5 BHK · 54 units · 4,815.05 sq m carpet · total for 54 flats, about 89.2 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 4.5 BHK · 32 units · 2,858.94 sq m carpet · total for 32 flats, about 89.3 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3.5 BHK · 48 units · 4,079.3 sq m carpet · total for 48 flats, about 85 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 3 BHK · 56 units · 5,835.21 sq m carpet · total for 56 flats, about 104.2 m² each
Statutory approvals, as declared · 32

Statutory approvals, as declared

  • I. LICENCE NO. 85 OF 2013 — declared: already been obtained (10 Oct 2013)
  • II. RENEWAL OF LICENE NO 85 OF 2013 (VALID UPTO 09.10.2024) — declared: already been obtained (9 Dec 2019)
  • III. LICENCE NO. 151 OF 2014 — declared: already been obtained (5 Sept 2014)
  • IV. RENEWAL OF LICENE NO 151 OF 2014 (VALID UPTO 04.09.2024) — declared: already been obtained (25 Oct 2019)
  • V. CHANGE OF DEVELOPER — declared: already been obtained (3 Oct 2018)
  • VI. ZONING PLAN — declared: already been obtained (14 Sept 2015)
  • VII. BUILDING PLAN — declared: already been obtained (9 Apr 2014)
  • VIII. REVISED BUILDING PLAN — declared: already been obtained (3 Oct 2018)
  • IX. ENVIRONMENT CLEARANCE — declared: already been obtained (3 Sept 2014)
  • X. REVISED ENVIRNMENT CLEARANCE — declared: already been obtained (14 Sept 2017)
  • XI. REVISED ENVIRONMENT CLEARANCE — declared: already been obtained (30 Apr 2021)
  • XII. NOC FOR HEIGHT CLEARANCE (13.759 ACRES) — declared: already been obtained (17 Feb 2014)
  • XIII. NOC FOR HEIGHT CLEARANCE (0.925 ACRES) — declared: already been obtained (12 Feb 2016)
  • XIV. APPROVAL OF FIRE SCHEME — declared: already been obtained (3 Jun 2015)
  • XV. APPROVAL OF REVISED FIRE SCHEME — declared: already been obtained (24 Apr 2019)
  • XVI. SERVICE PLAN ESTIMATES — declared: already been obtained (5 Feb 2019)
  • XVII. FOREST NOC (13.759 ACRES) — declared: already been obtained (24 Mar 2014)
  • XVIII. FOREST NOC (0.925) — declared: already been obtained (9 Dec 2015)
  • XIX. ARAVALI NOC (13.759 ACRES) — declared: already been obtained (22 Sept 2016)
  • XX. REVISED ARAVALI NOC (0.925 ACRES) — declared: already been obtained (22 Dec 2015)
  • XXI. MINING PERMISSION — declared: already been obtained (1 Oct 2014)
  • XXII. ASSURANC OF WATER CONNECTION — declared: already been obtained (20 Feb 2017)
  • XXIII. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (29 Aug 2016)
  • XXIV. SANCTION OF LOAD — declared: already been obtained (12 Nov 2016)
  • XXV. APPROVAL OF WATER CONNECTION — declared: already been obtained (22 May 2019)
  • XXVI. APPROVAL OF SEWERAGE CONNECTION — declared: already been obtained (9 May 2019)
  • XXVII. APPROVAL OF FIRE NOC, PHASE I — declared: already been obtained (19 Dec 2018)
  • XXVIII. OCCUPATION CERTIFICATE — declared: already been obtained (29 Mar 2019)
  • XXIX. APPROVAL OF FIRE NOC, PHASE II — declared: already been obtained (20 Aug 2020)
  • XXX. OCCUPATION CERTIFICATE — declared: already been obtained (18 Sept 2020)
  • XXXI. APPROVAL OF FIRE NOC, PHASE III — declared: already been obtained (23 Oct 2021)
  • XXXII. OCCUPATION CERTIFICATE — declared: already been obtained (25 Jan 2022)
On file with HARERA · 41 files

On file with HARERA (41)

Plans

Site plan

1 file
Approved Site Plan11 Nov 2022

Layout plan

1 file
Latest Layout Plan11 Nov 2022

Zoning plan

2 files
Zoning Plan28 Aug 2022Approval of Zoning Plan28 Aug 2022

Demarcation plan

1 file
Demarcation Plan11 Nov 2022

Building plans

3 files
Approved Building Plans, Full Set11 Nov 2022Approval of Building Plan28 Aug 2022Approval of Revised Building Plan28 Aug 2022

Services

Sewerage and drainage

2 files
Sewerage Assurance28 Aug 2022Approval of Sewerage Connection28 Aug 2022

Water supply

2 files
Water Assurance28 Aug 2022Approval of Water Connection28 Aug 2022

Electricity

1 file
Electrical Load28 Aug 2022

Service plans

2 files
Service Plans on the Layout11 Nov 2022Approval of Service Plan Estimate11 Nov 2022

Approvals and clearances

Occupation certificate (OC)

4 files
OC uploaded8 Aug 2023Occupation Certificate28 Aug 2022Occupation Certifictae28 Aug 2022Occupation Certificate28 Aug 2022

DTCP licence

2 files
Licence Copy with Land Schedule28 Aug 2022Change of Developer28 Aug 2022

Environment clearance

2 files
Environment Clearance28 Aug 2022Revised Environment Clearance28 Aug 2022

Fire safety

5 files
Approval of Fire Scheme28 Aug 2022Approval of Revised Fire Scheme28 Aug 2022Fire NOC I28 Aug 2022

Other NOCs and clearances

7 files
NOC for Height Clearance28 Aug 2022NOC for Height Clearance (0.925 Acres)28 Aug 2022Forest NOC28 Aug 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration11 Nov 2022

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures12 Nov 2022Cash Flow Statement12 Nov 2022Non-Default Certificate from a CA12 Nov 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Nov 2022

Other filings

Other filings

1 file
Enviromment Clearacne28 Aug 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

85 OF 2013 · Oasis Landmarks LLP · GURGAON-MANESAR

Licence valid to 9 Oct 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

151 OF 2014 · Oasis Landmarks LLP · GURGAON-MANESAR

Licence valid to 4 Sept 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Nov 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

85 OF 2013: 22 parcels, 13.7593 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 13.76 acres.

  • 86//1/15 kanal 7 marla
  • 86//1/33 marla
  • 86//28 kanal
  • 86//36 kanal
Show the other 18 parcels
  • 86//32 kanal
  • 86//48 kanal
  • 73//124 kanal 19 marla
  • 73//122 kanal
  • 73//137 kanal 11 marla
  • 73//147 kanal 11 marla
  • 73//15/13 kanal 12 marla
  • 73//16/23 kanal 16 marla
  • 73//178 kanal
  • 73//188 kanal
  • 73//21/22 kanal
  • 73//21/22 kanal 4 marla
  • 73//7/14 kanal
  • 73//23/26 kanal 4 marla
  • 73//24/26 kanal 4 marla
  • 73//25/26 kanal 4 marla
  • 73//22/26 kanal 4 marla
  • 73//21/1/22 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

151 OF 2014: 2 parcels, 0.925 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 0.925 acres.

  • 73//45 kanal
  • 73//7/22 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 86//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 88, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan11 Nov 2022

Layout plan

1 file
Latest Layout Plan11 Nov 2022

Building plans

3 files
Approved Building Plans, Full Set11 Nov 2022Approval of Building Plan28 Aug 2022Approval of Revised Building Plan28 Aug 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (41 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1815 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Oasis Landmarks

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.