Turning Point
by Vatika Group · Sector 88, Gurugram
Not on our price list yet
Possession 30 Jul 2022 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 88, Gurugram0.6 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- VATIKA LIMITEDthe company that filed it, for Vatika Group
- 1 May 2015Layout and building plans approveddeclared to HARERA, read 15 Oct 2026
- 15 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
- 30 Jul 2022Possession, as declareddeclared to HARERA, read 15 Oct 2026
- 15 Feb 2024Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- KitchenRefer section below.
- LiftsSpacious elevators with pleasing interiors. provision of a stretcher lift in all the cores.
- FloorsRefer section below.
- WallsRefer section below.
- BathroomsRefer section below.
- WindowsAluminum or UPVC frame windows with clear glass.
- Main doorAesthetically designed entrance door and door frames.
- Electrical fittingsIs compliant modular switches / sockets, switchgear and distribution boxes from reputed makes and brands.
The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.6 km
- Delhi–Gurugram–SNB RRTS3.8 km
- Sohna Elevated Corridor (NH-248A)7.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Registered, no OC or CC yet: 3
- Other register states: 10
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Alton Buildtech India | Same sector | — | — | — | |
The Center CourtNo photo on file yet | Ashiana Landcraft Realty | Same sector | — | — | — |
| Oasis Landmarks | Same sector | — | — | — | |
| Oasis Landmarks | Same sector | — | — | 31 Mar 2025 | |
| Vatika Group | Same sector | — | — | 30 Jul 2022 | |
| Oasis Landmarks | Same sector | — | — | — | |
M3M SOULITUDE 2No photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | 1.1 kmto its sector’s point | — | — | 3 Apr 2027 |
SMARTWORLD GEMSNo photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | 1.1 kmto its sector’s point | — | — | 30 Sep 2025 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Turning Point registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 213 OF 2017, registered on 15 Sep 2017. The register’s record shows an end date of 15 Feb 2024. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Turning Point?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jul 2022. Its registration runs to 15 Feb 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Turning Point?From the records · Map pin and road lines, read 6 Sep 2026
Turning Point is in Sector 88, Gurugram; the site address declared to HARERA is Sector-88b. In a straight line it is about 0.6 km from Dwarka Expressway, 3.8 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Turning Point?From the records · HARERA, read 4 Nov 2026
Turning Point is a Vatika Group project, registered by its company VATIKA LIMITED.
The source ↗Vatika Group's projects and court recordThe records
What the registers hold for Turning Point: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 213 OF 2017: Registration lapsed. The register’s record shows an end date of 15 Feb 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 91 OF 2013 is on the DTCP register: Licence lapsed; the register prints its validity to 25 Oct 2017.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 1 May 2015, building plans 1 May 2015.Declared to HARERA, read 15 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
- Registration no.
- 213 OF 2017
- Registration date
- 15 Sept 2017
- Registration valid till
- 15 Feb 2024
- Declared possession
- 30 Jul 2022
Declared by the promoter to HARERA
- Land area
- 18.80 (Acre) (76,080.9 sq m)
- FAR
- the application prints 169.2, which is not a ratio
- licence
- 91 of 2013 Dated 26.10.2013
- Estimated project cost
- ₹348.95 crore
- Cost of land
- ₹14.80 crore
- Layout plan, declared approved (field 5a)
- 1 May 2015
- Building plans, declared approved
- 1 May 2015
- Completion declared for
- 30 Jul 2022
Statutory approvals, as declared · 7
Statutory approvals, as declared
- I. LAY OUT PLAN — declared: already been obtained (1 Sept 2015)
- II. ZONING PLAN — declared: already been obtained (28 Oct 2013)
- III. BUILDING PLAN — declared: already been obtained (1 Sept 2015)
- IV. SITE PLAN — declared: already been obtained (1 Sept 2015)
- V. FLOOR PLAN — declared: already been obtained (1 Sept 2015)
- VI. APARTMENT PLANS — declared: already been obtained (1 Sept 2015)
- VII. ELEVATION SECTION — declared: already been obtained (1 Sept 2015)
On file with HARERA · 48 files
On file with HARERA (48)
Plans
Site plan
3 filesLayout plan
1 fileZoning plan
2 filesBuilding plans
3 filesFloor plans
2 filesApprovals and clearances
DTCP licence
2 filesLand records
Land records
6 filesSales papers
Allotment and sale agreements
4 filesBrochure and specifications
1 fileMoney
Accounts and finance
10 filesTimeline and progress
Construction schedule
2 filesThe promoter’s papers
Declarations and affidavits
4 filesCompany papers
4 filesHARERA’s orders
HARERA’s orders
4 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
91 OF 2013 · Vatika Ltd. · GURGAON-MANESAR
Licence valid to 25 Oct 2017
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Jan 2020 · read 15 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
91 OF 2013: 30 parcels, 18.8 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.
The licence register prints the same licensed area, 18.8 acres.
- 2//252 kanal 19 marla
- 3//211 kanal 18 marla
- 5//115 kanal 2 marla
- 5//128 kanal
Show the other 26 parcels
- 5//138 kanal
- 5//148 kanal
- 5//155 kanal 17 marla
- 5//16/25 marla
- 5//17/25 marla
- 5//17/33 kanal 8 marla
- 5//188 kanal
- 5//19/27 kanal 8 marla
- 5//20/12 kanal 3 marla
- 5//21/22 kanal 3 marla
- 5//228 kanal
- 5//23/13 kanal 7 marla
- 5//46 kanal 6 marla
- 5//58 kanal
- 5//67 kanal 4 marla
- 5//78 kanal
- 5//87 kanal 10 marla
- 5//92 kanal 16 marla
- 12//128 kanal
- 12//98 kanal
- 12//12 kanal 3 marla
- 12//28 kanal
- 12//102 kanal 3 marla
- 12//134 kanal 16 marla
- 12//112 kanal 3 marla
- 5//19/112 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 2//25.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹7,000 per sq ft
Sector 88, collector rates effective 1 Apr 2026, Harsaru tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
3 filesLayout plan
1 fileBuilding plans
3 filesFloor plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (48 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1115 · read 15 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Vatika Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.