Skip to content

Commercial Project

by Prompt Engineering · Sector 74, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 74, Gurugram1.4 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
about 625 sq ft
In m²about 58 m², the average flat, as declared
Registered
24 Jan 2018
Registered by
PROMPT ENGINEERING PRIVATE LIMITEDthe company that filed it, for Prompt Engineering
Timeline
  1. 8 Jan 2018Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Jan 2018Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Mar 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.449 acres in all, by use
  • Other usesas the form names them: Rain water harvesting3.24 acres · 43%
  • Apartment buildings2.272 acres · 31%
  • Roads1.355 acres · 18%
  • Pavements0.414 acres · 6%
  • Green belts0.16 acres · 2%
  • Parking0.008 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningChilled water AC system for office & provision for water cooled DX system upto TAP OFF inside SHOP
  • LiftsSchindler/thyseenkrup/fujitec/KONE
  • FloorsRCC SLAB
  • WallsPainted/white WASH masonry wall/partition
  • BathroomsChinaware & CP fittings of standard makes, washbasin with & without counter
  • WindowsPowder coated aluminium glazing with glass of 5-12 MM thick glass
  • Main doorAluminium doors / glass doors
  • Electrical fittingsPublic areas & toilets to be provided with LED light fixtures.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 74, GurugramSector 74, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.4 km
  • Dwarka ExpresswayOpen, 17 Aug 20251.9 km
  • Sohna Elevated Corridor (NH-248A)3.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Commercial Project registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 17 OF 2018, registered on 24 Jan 2018. Ended 31 Mar 2025. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Commercial Project?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Project is in Sector 74, Gurugram; the site address declared to HARERA is Sector 74 Gurugram Manesar Urban Complex Gurugram. In a straight line it is about 1.4 km from Delhi–Gurugram–SNB RRTS, 1.9 km from Dwarka Expressway and 3.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Project?From the records · HARERA, read 4 Nov 2026

Commercial Project is a Prompt Engineering project, registered by its company PROMPT ENGINEERING PRIVATE LIMITED.

The source ↗Prompt Engineering's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Commercial Project: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 17 OF 2018: Registration expired. Ended 31 Mar 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 121 OF 2008 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 13 Jun 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 8 Jan 2018, building plans 8 Jan 2018.Declared to HARERA, read 29 Oct 2026
The court record of Prompt Engineering’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Mar 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 121 OF 2008 validity ended

    Named in this project’s application. Valid to 13 Jun 2025. The register links a completion certificate (LC-IX), dated 28 Oct 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
17 OF 2018
Registration date
24 Jan 2018
Registration valid till
31 Mar 2025

Declared by the promoter to HARERA

Land area
7.44375 (Acre) (30,123.79 sq m)
FAR
the application prints 143.36, which is not a ratio
licence
121 of 2008 dated 14.06.2008
Estimated project cost
₹789.15 crore
Cost of land
₹310.98 crore
Layout plan, declared approved (field 5a)
8 Jan 2018
Building plans, declared approved
8 Jan 2018
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL,FOOD COURT/KIOSKS,RESTAURANTS,OFFICE · 530 units · 30,754 sq m carpet · total for 530 flats, about 58 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (30 Mar 2017)
  • II. HARERA REGISTRATION — declared: already been obtained (24 Jan 2018)
  • III. LICENCE — declared: already been obtained (14 Jun 2008)
  • IV. ZONING PLAN — declared: already been obtained (8 Apr 2009)
  • V. BUILDING PLAN — declared: already been obtained (8 Jan 2018)
  • VI. ENVIRONMENT CLEARANCE — declared: already been obtained (21 Jan 2019)
  • VII. ARAVALI — declared: already been obtained (10 Jul 2017)
  • VIII. FOREST — declared: already been obtained (27 Jun 2017)
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan28 Jan 2020

Layout plan

1 file
Latest Layout Plan28 Jan 2020

Zoning plan

1 file
Zoning Plan28 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set28 Jan 2020

Approvals and clearances

Occupation certificate (OC)

3 files
Occupation Certificate10 Apr 2024Occupation Certificate10 Apr 2024Occupation Certificate10 Apr 2024

DTCP licence

1 file
Licence Copy with Land Schedule11 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration28 Jan 2020

Money

Accounts and finance

2 files
Cash Flow Statement11 Feb 2020Non-Default Certificate from a CA30 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Feb 2020

HARERA’s orders

HARERA’s orders

1 file
The Registration Certificate issued for the earlier approved FAR of the project vide Registration No. 17 of 2O18 dated 24.O1.2018 (Interim RERA, Panchkula) stands subsumed in this registration certificate without affecting the obligations and liabilities of M/s Prompt Engineering Private Limited towards the existing allottees. Earlier Registration no. 17 of 2018 dated 24.01.2018 comprises of total sanctioned Commercial FAR of 43,294.316 Sq. Mtrs. stands amended after incorporating additional FAR under GRIHA, TOD and TDR. The completion date of the project is kept same in this amended registration as per the original registration certificate18 Jan 2023

Other filings

Other filings

1 file
Compeletion Certificate Uploaded28 Nov 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

121 OF 2008 · Prompt Engineering Pvt. Ltd · GURGAON-MANESAR

Licence valid to 13 Jun 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

121 OF 2008: 10 parcels, 7.4625 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the licensed area as 7.4438 acres.

  • 48//178 kanal
  • 48//188 kanal
  • 48//238 kanal
  • 48//248 kanal
Show the other 6 parcels
  • 48//25/16 kanal
  • 48//25/22 kanal
  • rectangle 56, kila 3/12 kanal
  • rectangle 56, kila 4/14 kanal
  • rectangle 49, kila 20/25 kanal 14 marla
  • rectangle 49, kila 218 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bagampur khatola (hadbast 101), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 48//17.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,40,000 per sq yd

this sector, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Jan 2020

Layout plan

1 file
Latest Layout Plan28 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set28 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1233 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Prompt Engineering

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.