Skip to content

GRAND VISTA

by Pyramid Infratech · Sector 73, Gurugram

Not on our price list yet

Possession 15 Dec 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 73, Gurugram2.1 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered by
PYRAMID INFRATECH PVT LTDthe company that filed it, for Pyramid Infratech

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.169 acres in all, by use
  • Roads1.15 acres · 53%
  • Plots for sale0.758 acres · 35%
  • Parks and playgrounds0.108 acres · 5%
  • Other usesas the form names them: Open parking area, Toilet block, UGT (underground water tank)0.083 acres · 4%
  • Electricity sub-station0.049 acres · 2%
  • Sewage and waste treatment0.02 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 73, GurugramSector 73, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.1 km
  • Dwarka ExpresswayOpen, 17 Aug 20252.5 km
  • Sohna Elevated Corridor (NH-248A)2.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 10 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 9
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is GRAND VISTA registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/560/292/2022/35. Valid to 15 Dec 2026.

The source ↗
What is the possession timeline for GRAND VISTA?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 15 Dec 2026. Its registration runs to 15 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GRAND VISTA?From the records · Map pin and road lines, read 6 Sep 2026

GRAND VISTA is in Sector 73, Gurugram; the site address declared to HARERA is Sector- 73. In a straight line it is about 2.1 km from Delhi–Gurugram–SNB RRTS, 2.5 km from Dwarka Expressway and 2.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GRAND VISTA?From the records · HARERA, read 3 Nov 2026

GRAND VISTA is a Pyramid Infratech project, registered by its company PYRAMID INFRATECH PVT LTD.

The source ↗Pyramid Infratech's projects and court record

The records

What the registers hold for GRAND VISTA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/560/292/2022/35: Registered. Valid to 15 Dec 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 107 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 16 Dec 2026.DTCP, read 3 Nov 2026
The court record of Pyramid Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 15 Dec 2026. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 107 OF 2021 ends soon

    Named in this project’s application. Valid to 16 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 36 HARERA files, with the dates we read them
Registration no.
GGM/560/292/2022/35
Registration valid till
15 Dec 2026
Declared possession
15 Dec 2026

Declared by the promoter to HARERA

Land area
2.16875 (Acre) (8,776.62 sq m)
FAR
1.49 proposed of 1.5 permissible
licence
107 OF 2021 DATED 17.12.2021
Estimated project cost
₹55.44 crore
Cost of land
₹11.67 crore
Construction to start
15 Jun 2022
Completion declared for
15 Dec 2026
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (17 Dec 2021)
  • II. LAYOUT PLAN APPROVAL — declared: already been obtained (4 Jan 2022)
  • III. DEMARCATION — declared: already been obtained (4 Jan 2022)
  • IV. ELECTRICITY LOAD AVAILABILITY — declared: already been obtained (3 Jan 2022)
  • V. WATER SUPPLY ASSURANCE — declared: already been obtained (7 Jan 2022)
  • VI. ASSURANCE FOR SEWARAGE DISPOSAL — declared: already been obtained (30 Dec 2021)
  • VII. FOREST NOC — declared: already been obtained (7 Dec 2021)
  • VIII. STANDARD DESIGN — declared: already been obtained (26 Apr 2022)
On file with HARERA · 36 files

On file with HARERA (36)

Plans

Site plan

1 file
Approved Site Plan14 Apr 2022

Layout plan

1 file
Latest Layout Plan14 Apr 2022

Zoning plan

1 file
Zoning Plan19 May 2022

Demarcation plan

2 files
Superimposed Demarcation Plan20 May 2022Demarcation Plan14 Apr 2022

Building plans

2 files
Approval Letter with Standard Design Sec-73 Grand Vista19 May 2022Approved Building Plans, Full Set14 Apr 2022

Services

Sewerage and drainage

2 files
Assurance for Sewerage Connection14 Apr 2022Assurance for Storm Water14 Apr 2022

Water supply

1 file
Assurance for Water Supply14 Apr 2022

Electricity

3 files
Electricity Supply Plan20 May 2022Street Light Plan20 May 2022Assurance for Electricity14 Apr 2022

Landscape and green areas

1 file
Landscape Plan20 May 2022

Service plans

1 file
Service Plans on the Layout18 May 2022

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded4 Jun 2026

DTCP licence

3 files
LC IV and IV D19 May 2022LOI19 May 2022Licence Copy with Land Schedule14 Apr 2022

Other NOCs and clearances

1 file
NOC Forest19 May 2022

Land records

Land records

5 files
Jamabandi19 May 2022Mutation19 May 2022Sale Deed19 May 2022

Money

Accounts and finance

6 files
Project Report19 May 2022Loan Sanction Letter19 May 2022Cash Flow Statement18 May 2022

The promoter’s papers

Declarations and affidavits

3 files
Tree Cutting Affidavit19 May 2022Affidavit Account18 May 2022The Promoter’s Declaration on Affidavit14 Apr 2022

Company papers

2 files
ROC Form19 May 2022Company TAN14 Apr 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

107 OF 2021 · Pyramid Infratech Pvt Ltd · GURGAON-MANESAR

Licence valid to 16 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Apr 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

107 OF 2021: 4 parcels, 2.1687 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the same licensed area, 2.1688 acres.

  • 51//107 kanal 12 marla
  • 51//11/13 kanal 16 marla
  • 51//12/1/1/11 kanal 7 marla
  • 51//9/2/24 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bagampur khatola (hadbast 101), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 51//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “GRAND VISTA”, by Pyramid Infratech Pvt Ltd, code Gurgaon-0326-007151, approved 2026.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan14 Apr 2022

Layout plan

1 file
Latest Layout Plan14 Apr 2022

Building plans

2 files
Approval Letter with Standard Design Sec-73 Grand Vista19 May 2022Approved Building Plans, Full Set14 Apr 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (36 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1929 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pyramid Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.