ONE GLOBAL

by Capital Heights · Sector 73, Gurugram

Not on our price list yet

Possession 30 Sep 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 73, Gurugram2.1 km from Delhi–Gurugram–SNB RRTS, in a straight line
Registered by
CAPITAL HEIGHTS PRIVATE LIMITEDthe company that filed it, for Capital Heights
Timeline
  1. 14 Nov 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Jan 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Sep 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 30 Sep 2026Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.406 acres in all, by use
  • Roads3.528 acres · 48%
  • Plots for sale2.592 acres · 35%
  • Parking0.742 acres · 10%
  • Parks and playgrounds0.257 acres · 3%
  • Other usesas the form names them: Rain, Under0.103 acres · 1%
  • Sewage and waste treatment0.099 acres · 1%
  • Electricity sub-station0.087 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 73, GurugramSector 73, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.1 km
  • Dwarka ExpresswayOpen, 17 Aug 20252.5 km
  • Sohna Elevated Corridor (NH-248A)2.5 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ONE GLOBAL registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/686/418/2023/30. The register’s record shows an end date of 30 Sep 2026. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ONE GLOBAL?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2025. Its registration runs to 30 Sep 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ONE GLOBAL?From the records · Map pin and road lines, read 6 Sep 2026

ONE GLOBAL is in Sector 73, Gurugram; the site address declared to HARERA is Sector 73, Village Begampur Khatola. In a straight line it is about 2.1 km from Delhi–Gurugram–SNB RRTS, 2.5 km from Dwarka Expressway and 2.5 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ONE GLOBAL?From the records · HARERA, read 4 Nov 2026

ONE GLOBAL is a Capital Heights project, registered by its company CAPITAL HEIGHTS PRIVATE LIMITED.

The source ↗Capital Heights's projects and court record

The records

What the registers hold for ONE GLOBAL: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/686/418/2023/30: Registration lapsed. The register’s record shows an end date of 30 Sep 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 184 OF 2022 is on the DTCP register, valid to 13 Nov 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 14 Nov 2022, building plans 10 Jan 2023.Declared to HARERA, read 29 Oct 2026
The court record of Capital Heights’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 40 HARERA files, with the dates we read them
Registration no.
GGM/686/418/2023/30
Registration valid till
30 Sept 2026
Declared possession
30 Sept 2025

Declared by the promoter to HARERA

Land area
7.40625 (Acre) (29,972.03 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
184 OF 2022 Dated 14-11-2022
Estimated project cost
₹231.59 crore
Cost of land
₹51.09 crore
Layout plan, declared approved (field 5a)
14 Nov 2022
Building plans, declared approved
10 Jan 2023
Construction to start
1 Jan 2023
Completion declared for
30 Sept 2025
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (14 Nov 2022)
  • II. LAYOUT — declared: already been obtained (14 Nov 2022)
  • III. STANDARD DESIGN — declared: already been obtained (10 Jan 2023)
  • IV. SERVICE PLAN ESTIMATES — declared: already been obtained (18 Jan 2023)
On file with HARERA · 40 files

On file with HARERA (40)

Plans

Site plan

2 files
Site Plan Demarcation22 Jun 2023Approved Site Plan11 Jan 2023

Layout plan

1 file
Latest Layout Plan22 Jun 2023

Building plans

21 files
Block - E Floor Plan Area Detail Elevations Sections22 Jun 2023Block- B Floor Plan and Area Detail Elevations Sections22 Jun 2023Block - C Floor Plan Area Detail Elevation Sections (2)22 Jun 2023

Services

Sewerage and drainage

3 files
Sewerage Layout Plan22 Jun 2023Drainage Layout Plan22 Jun 2023Estimate Report for Warer Supply, Sewerage, Strom Water and Other22 Jun 2023

Water supply

1 file
Water Supply Layout Plan22 Jun 2023

Roads

1 file
Road Layout Plan22 Jun 2023

Service plans

1 file
Service Plan Approval Letter Sector- 7322 Jun 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule22 Jun 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration22 Jun 2023

Money

Accounts and finance

1 file
Non-Default Certificate from a CA22 Jun 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit11 Jan 2023

HARERA’s orders

HARERA’s orders

1 file
Extension No. 41 of 2025 dated 16.10.202516 Oct 2025

Other filings

Other filings

5 files
Block - A -84SQM Type-A22 Jun 2023Block - A -84SQM Type-B22 Jun 2023Block - B -105.3 Sqm Type-A22 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

184 OF 2022 · Goddard Builders & Constructions Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 13 Nov 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

184 OF 2022: 18 parcels, 7.4063 acres in all, in Bagampur khatola (hadbast 101), tehsil Kadipur.

The licence register prints the same licensed area, 7.4063 acres.

  • 50//168 kanal
  • 50//17/14 kanal
  • 50//17/24 kanal
  • 50//186 marla
Show the other 14 parcels
  • 50//24/14 kanal
  • 50//24/24 kanal
  • 50//25/14 kanal
  • 50//25/24 kanal
  • 51//20/1/12 marla
  • 51//20/2/26 kanal 18 marla
  • 51//21/1/15 kanal
  • 51//21/2/15 marla
  • 53//1/1/12 kanal 7 marla
  • 53//1/2/12 marla
  • 54//4/1/14 kanal 8 marla
  • 54//4/2/11 kanal 15 marla
  • 54//5/1/13 kanal 4 marla
  • 54//5/2/12 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bagampur khatola (hadbast 101), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 50//16.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan Demarcation22 Jun 2023Approved Site Plan11 Jan 2023

Layout plan

1 file
Latest Layout Plan22 Jun 2023

Building plans

21 files
Block - E Floor Plan Area Detail Elevations Sections22 Jun 2023Block- B Floor Plan and Area Detail Elevations Sections22 Jun 2023Block - C Floor Plan Area Detail Elevation Sections (2)22 Jun 2023Block - E Floor Plan Area Detail Elevations Sections (2)22 Jun 2023Block -D Floor Plan Area Detail Elevation Sections22 Jun 2023Approval of Standard Design for Sco's22 Jun 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (40 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2305 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Capital Heights

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.