Commercial Project

by JMS Group · Sector 102, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
2 Feb 2018
Registered by
JMS BUILDTECH PRIVATE LIMITEDthe company that filed it, for JMS Group
Timeline
  1. 21 Nov 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 2 Feb 2018Registered with HARERAHARERA, read 3 Nov 2026
  3. 17 Jun 2026Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside8,094 m² in all, by use
  • Apartment buildings4,856 m² · 60%
  • Roads2,109 m² · 26%
  • Pavements809 m² · 10%
  • Green belts320 m² · 4%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts2 no'S of lift for passenger 1 no'S of lift for FIRE
  • Floors1. common area & corridor- vitrified tile & marble 2. stair CASE - KOTA stone marble 3. toilet - antiskid pyramid tile
  • Walls1. common area & corridor- OBD with combination of marble 2. stair CASE - OBD 3. toilet - OBD with combination of pyramid tile
  • BathroomsSingle lever CP fitting white chinaware
  • WindowsUPVC/ aluminium
  • Electrical fittingsModular switches & sockets light in corridor staircase, toilet & external lighting
  • Water storageUnder ground water tank

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Commercial Project registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 22 OF 2018, registered on 2 Feb 2018. Ended 17 Jun 2026. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Commercial Project?From the records · Map pin and road lines, read 6 Sep 2026

Commercial Project is in Sector 102, Gurugram; the site address declared to HARERA is Sector-102, Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Commercial Project?From the records · HARERA, read 3 Nov 2026

Commercial Project is a JMS Group project, registered by its company JMS BUILDTECH PRIVATE LIMITED.

The source ↗JMS Group's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Commercial Project: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 22 OF 2018: Registration expired. Ended 17 Jun 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: layout plan 21 Nov 2017, building plans 21 Nov 2017.Declared to HARERA, read 29 Oct 2026
The court record of JMS Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 17 Jun 2026. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
Registration no.
22 OF 2018
Registration date
2 Feb 2018
Registration valid till
17 Jun 2026

Declared by the promoter to HARERA

Land area
2 (Acre) (8,093.71 sq m)
FAR
the application prints 141.29, which is not a ratio
licence
04.01.2018
Estimated project cost
₹81.60 crore
Layout plan, declared approved (field 5a)
21 Nov 2017
Building plans, declared approved
21 Nov 2017
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type S1 · 590 units
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. ENVIRONMENTAL CLEARANCE — declared: already been obtained (13 Feb 2018)
  • II. STP — declared: already been obtained (21 Dec 2017)
  • III. DRINKING WATER — declared: already been obtained (18 Dec 2017)
  • IV. ARAVALLI — declared: already been obtained (4 Jan 2018)
  • V. FOREST — declared: already been obtained (11 Dec 2017)
  • VI. BUILDING PLAN — declared: already been obtained (17 Jan 2018)
  • VII. LICENSE — declared: already been obtained (13 Aug 2014)
  • VIII. MINING — declared: already been obtained (19 Sept 2019)
On file with HARERA · 15 files

On file with HARERA (15)

Plans

Site plan

1 file
Approved Site Plan9 Dec 2019

Layout plan

1 file
Latest Layout Plan10 Dec 2019

Zoning plan

1 file
Zoning Plan9 Dec 2019

Demarcation plan

1 file
Demarcation Plan10 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set10 Dec 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Project OC20 Aug 2026

DTCP licence

1 file
Licence Copy with Land Schedule10 Dec 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration10 Dec 2019

Sales papers

Allotment and sale agreements

3 files
Draft Allotment Letter10 Dec 2019Gist of Unit Buyer Agreement10 Dec 2019BBA10 Dec 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA10 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit10 Dec 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 12 of 2024 Dated 28.06.202410 Jul 2024

Other filings

Other filings

1 file
PROJECT CONTINUATION- RC/REP/HARERA/GGM/22 of 2018/7(3)/59/2025/01 DATED 20.02.202524 Feb 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared 04.01.2018. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 10 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Collector rate, commercial property
₹2,52,000 per sq yd

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan9 Dec 2019

Layout plan

1 file
Latest Layout Plan10 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set10 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/362 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on JMS Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.