Skip to content

Imperial Garden (Phase 2)

by Emaar MGF Land · Sector 102, Gurugram

Not on our price list yet

Possession 31 Dec 2018 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
1,228–1,256 sq ft
In m²about 114–117 m², as declared
Registered
28 Mar 2019
Registered by
EMAAR MGF LAND LTD.the company that filed it, for Emaar MGF Land
Timeline
  1. 17 Oct 2018Registration valid toHARERA, read 4 Nov 2026
  2. 31 Dec 2018Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 28 Mar 2019Registered with HARERAHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

235homes, 1,228 to 1,256 sq ft of carpet area
  • 1,000–1,500 sq ft1,228–1,256 sq ft235

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 103 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioning5 NOS AIR conditioning with 1.5 TON capacity.
  • KitchenModular type
  • Lifts1passanger + 1 service / each tower
  • WardrobesProvision in M. bed room.( unit 2025 SQFT area.)
  • FloorsTiles & wooden flooring
  • WallsAcrylic emulsion paints
  • BathroomsChrome plated fittings
  • WindowsUPVC D/W with 6MM toughened glass , fittings

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 19
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Imperial Garden (Phase 2) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/320/52/2019/14, registered on 28 Mar 2019. Ended 17 Oct 2018. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Imperial Garden (Phase 2)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2018. Its registration runs to 17 Oct 2018; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Imperial Garden (Phase 2)?From the records · Map pin and road lines, read 6 Sep 2026

Imperial Garden (Phase 2) is in Sector 102, Gurugram; the site address declared to HARERA is Sector- 102, Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Imperial Garden (Phase 2)?From the records · HARERA, read 4 Nov 2026

Imperial Garden (Phase 2) is a Emaar MGF Land project, registered by its company EMAAR MGF LAND LTD..

The source ↗Emaar MGF Land's projects and court record

The records

What the registers hold for Imperial Garden (Phase 2): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/320/52/2019/14: Registration expired. Ended 17 Oct 2018.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 107 OF 2012 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 9 Oct 2020.DTCP, read 3 Nov 2026
The court record of Emaar MGF Land’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 17 Oct 2018. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 107 OF 2012 validity ended

    Named in this project’s application. Valid to 9 Oct 2020. The register links a completion certificate (LC-IX), dated 18 Sep 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
GGM/320/52/2019/14
Registration date
28 Mar 2019
Registration valid till
17 Oct 2018
Declared possession
31 Dec 2018

Declared by the promoter to HARERA

Land area
4.57 (Acre) (18,494.13 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
107 of 2012 (validity dated 09.10.2020)
Estimated project cost
₹180.05 crore
Cost of land
₹5.61 crore
Completion declared for
31 Dec 2018
Declared inventory · 9 types

Declared inventory — 9 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type A 1 · 30 units · 114.1 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A 1 · 29 units · 116.66 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A 2 · 30 units · 114.1 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type A 2 · 29 units · 116.66 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type C 3 · 29 units · 114.1 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type C 3 · 29 units · 116.66 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type C 4 · 30 units · 114.1 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type C 4 · 29 units · 116.66 sq m carpet · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (10 Oct 2012)
  • II. FOREST NOC — declared: already been obtained (10 Oct 2013)
  • III. AIRPORT CLEARANCE — declared: already been obtained (26 Apr 2018)
  • IV. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (23 Oct 2012)
  • V. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (13 Oct 2017)
  • VI. ENVIRONMENT CLEARANCE — declared: already been obtained (6 Sept 2013)
  • VII. CONSENT TO ESTABLISH — declared: already been obtained (20 Dec 2017)
  • VIII. MINING PERMISSION — declared: already been obtained (25 Oct 2013)
  • IX. FIRE SCHEME — declared: already been obtained (25 Oct 2013)
  • X. SERVICE ESTIMATES PLAN — declared: already been obtained (24 Mar 2014)
  • XI. COMMENCEMENT CERTIFICATE — declared: already been obtained (30 Oct 2012)
  • XII. OCCUPATION CERTIFICATE FOR 4 TOWERS — declared: already been obtained (17 Oct 2018)
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

1 file
Approved Site Plan15 Nov 2018

Layout plan

1 file
Latest Layout Plan15 Nov 2018

Zoning plan

1 file
Zoning Plan15 Nov 2018

Demarcation plan

1 file
Demarcation Plan15 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set15 Nov 2018

Services

Service plans

1 file
Service Plans on the Layout15 Nov 2018

Approvals and clearances

Occupation certificate (OC)

3 files
OC uploaded8 Aug 2023OC uploaded8 Aug 2023OC for 4 Towers15 Nov 2018

Completion certificate (CC)

1 file
CC uploaded7 Oct 2025

DTCP licence

1 file
Licence Copy with Land Schedule15 Nov 2018

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration25 Mar 2019

Money

Accounts and finance

3 files
Non-Default Certificate from a CA15 Nov 2018Cash Flow Statement15 Nov 2018CA Certificate on the Application’s Figures15 Nov 2018

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Nov 2018

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

107 OF 2012 · Emmar MGF Land Ltd. · GURGAON-MANESAR

Licence valid to 9 Oct 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Nov 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

107 OF 2012: 12 parcels, 12 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.

The licence register prints the same licensed area, 12 acres.

  • 46//218 kanal
  • 46//228 kanal
  • 53//18 kanal
  • 53//108 kanal
Show the other 8 parcels
  • 53//118 kanal
  • 53//128 kanal
  • 53//28 kanal
  • 53//38 kanal
  • 53//48 kanal
  • 53//78 kanal
  • 53//88 kanal
  • 53//98 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 46//21.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan15 Nov 2018

Layout plan

1 file
Latest Layout Plan15 Nov 2018

Building plans

1 file
Approved Building Plans, Full Set15 Nov 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (16 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/287 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emaar MGF Land

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.