Not on our price list yet

Possession 20 Mar 2017 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
17 Oct 2017
Registered by
CLARION PROPERTIES LIMITEDthe company that filed it, for Clarion Properties
Timeline
  1. 5 Jun 2015Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 20 Mar 2017Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 17 Oct 2017Registered with HARERAHARERA, read 4 Nov 2026
  4. 16 Nov 2024Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside23,661 m² in all, by use
  • Apartment buildings9,296 m² · 39%
  • Parking4,252 m² · 18%
  • Other uses3,702 m² · 16%
  • Roads3,560 m² · 15%
  • Green belts2,664 m² · 11%
  • Electricity sub-station188 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is The Hive registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 316 OF 2017, registered on 17 Oct 2017. Ended 16 Nov 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for The Hive?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 20 Mar 2017. Its registration runs to 16 Nov 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around The Hive?From the records · Map pin and road lines, read 6 Sep 2026

The Hive is in Sector 102, Gurugram; the site address declared to HARERA is Vill Dhankot Sector-102. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building The Hive?From the records · HARERA, read 4 Nov 2026

The Hive is a Clarion Properties project, registered by its company CLARION PROPERTIES LIMITED.

The source ↗Clarion Properties's projects and court record

The records

What the registers hold for The Hive: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 316 OF 2017: Registration expired. Ended 16 Nov 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 93 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 4 Sep 2020.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 5 Jun 2015, building plans 5 Jun 2015.Declared to HARERA, read 29 Oct 2026
The court record of Clarion Properties’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 16 Nov 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 93 OF 2012 lapsed

    Named in this project’s application. Valid to 4 Sep 2020; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 30 OF 2014 lapsed

    Named in this project’s application. Valid to 11 Jun 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Red flag: Licence 31 OF 2014 lapsed

    Named in this project’s application. Valid to 11 Jun 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 40 HARERA files, with the dates we read them
Registration no.
316 OF 2017
Registration date
17 Oct 2017
Registration valid till
16 Nov 2024
Declared possession
20 Mar 2017

Declared by the promoter to HARERA

Land area
5.846875 (Acre) (23,661.46 sq m)
FAR
the application prints 175, which is not a ratio
licence
93 of 2012, 30 of 2014 and 31 of 2014
Estimated project cost
₹228.93 crore
Cost of land
₹3.29 crore
Layout plan, declared approved (field 5a)
5 Jun 2015
Building plans, declared approved
5 Jun 2015
Completion declared for
20 Mar 2017
Declared inventory · 18 types

Declared inventory — 18 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type GROUND FLOOR- SHOPS · 183 units · 71,947 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FIRST FLOOR- SHOPS · 175 units · 52,492.98 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SECOND FLOOR- OFFICE SPACES UNITS · 26 units · 7,745 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type THIRD FLOOR- OFFICE SPACES UNITS · 48 units · 22,427.44 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FOURTH FLOOR- OFFICE SPACES UNITS · 56 units · 21,669.39 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FIFTH FLOOR- OFFICE SPACES UNITS · 30 units · 21,433 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SIXTH FLOOR- OFFICE SPACES UNITS · 51 units · 20,555.69 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SEVENTH FLOOR- OFFICE SPACES UNITS · 44 units · 18,621.75 sq m carpet
Statutory approvals, as declared · 15

Statutory approvals, as declared

  • I. LICENSE NO 93 — declared: already been obtained (5 Sept 2012)
  • II. LICENSE 30 — declared: already been obtained (12 Jun 2014)
  • III. LICENCE 31 — declared: already been obtained (12 Jun 2014)
  • IV. BUILDING PLAN — declared: already been obtained (5 Jun 2015)
  • V. FIRE FIGHTING SCHEME — declared: already been obtained (9 Dec 2015)
  • VI. ARAVALI NOC LICENCE NO 93 — declared: already been obtained (16 Jul 2013)
  • VII. ARRIVAL NOC LICENCE NO 30 — declared: already been obtained (16 Jun 2013)
  • VIII. ARRIVAL NOC LICENCE NO 31 — declared: already been obtained (27 Jun 2013)
  • IX. FOREST NOC LICENCE 93 — declared: already been obtained (13 Mar 2013)
  • X. FOREST NOC LICENCE 30 — declared: already been obtained (13 Mar 2013)
  • XI. FOREST NOC LICENCE 31 — declared: already been obtained (13 Mar 2013)
  • XII. WATER NOC/PERMISSION FROM HUDA — declared: already been obtained (21 Jul 2014)
  • XIII. ENVIRONMENTAL CLEARANCE — declared: already been obtained (31 May 2015)
  • XIV. NOC FROM AIRPORT AUTHORITY — declared: already been obtained (1 Aug 2014)
  • XV. ZONING PLAN — declared: already been obtained (11 Feb 2015)
On file with HARERA · 40 files

On file with HARERA (40)

Plans

Site plan

2 files
Site Plan13 Feb 2020Approved Site Plan23 Nov 2019

Layout plan

2 files
Garden Hydrant Layout13 Feb 2020Latest Layout Plan23 Nov 2019

Zoning plan

1 file
Zoning Plan21 Nov 2019

Demarcation plan

1 file
Demarcation Plan21 Nov 2019

Building plans

3 files
Revised Approved Building Plan13 Feb 2020BR-Iii(approval of Building Plan)25 Nov 2019Approved Building Plans, Full Set23 Nov 2019

Services

Sewerage and drainage

2 files
Drainage Layout13 Feb 2020Sewerage Layout13 Feb 2020

Water supply

1 file
Water Supply Layout13 Feb 2020

Electricity

1 file
Ultimate Power Load25 Nov 2019

Roads

1 file
Road Layout13 Feb 2020

Service plans

2 files
Approval of Service Plan Estimate13 Feb 2020Service Plans on the Layout23 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate18 Oct 2024

DTCP licence

7 files
LC-Iv(lc No 93)13 Feb 2020LOI of 3.46 Acres13 Feb 2020LOI of 2.15 Acres13 Feb 2020

Environment clearance

1 file
Environmental Clearance25 Nov 2019

Fire safety

2 files
Fire Approval13 Feb 2020Fire Fighting Layout13 Feb 2020

Other NOCs and clearances

4 files
Airport NOC13 Feb 2020NOC from Aravali25 Nov 2019Water NOC25 Nov 2019NOC Non Forest Land25 Nov 2019

Land records

Land records

3 files
Collaboration Agreement Supplementary Regd13 Feb 2020Collaboration Agreement Sec 102 Registered13 Feb 2020Revenue Record Entry of Licence and Collaboration23 Nov 2019

Sales papers

Allotment and sale agreements

1 file
Builder Buyer Agreement25 Nov 2019

Money

Accounts and finance

3 files
Non-Default Certificate from a CA13 Feb 2020Cash Flow Statement27 Nov 2019CA Certificate on the Application’s Figures25 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Nov 2019

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/316 of 2017/7(3)/26/2023/03 Dated 03.02.202324 Feb 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 3 DTCP licences named on the application

93 OF 2012 · Clarion Properties Pvt. Ltd · GURGAON-MANESAR

Licence valid to 4 Sept 2020

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

30 OF 2014 · Clarion Properties Ltd. · GURGAON-MANESAR

Licence valid to 11 Jun 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

31 OF 2014 · Clarion Properties Ltd. · GURGAON-MANESAR

Licence valid to 11 Jun 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 27 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 3 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

93 OF 2012: 6 parcels, 3.4625 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.

The licence register prints the same licensed area, 3.4625 acres.

  • 77//147 kanal 12 marla
  • 77//15/14 kanal 18 marla
  • 77//15/23 kanal 2 marla
  • 77//6/34 kanal 13 marla
Show the other 2 parcels
  • 77//7/1/23 kanal 12 marla
  • 77//7/2/23 kanal 17 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

30 OF 2014: 2 parcels, 0.225 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.

The licence register prints the same licensed area, 0.23 acres.

  • 78//11/16 marla
  • 78//11/11 kanal 10 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

31 OF 2014: 8 parcels, 2.1594 acres in all, in Dhankot (hadbast 49), tehsil Kadipur.

The licence register prints the same licensed area, 2.16 acres.

  • 77//12/218 marla
  • 77//137 kanal 4 marla
  • 77//148 marla
  • 77//18/11 kanal 7 marla
Show the other 4 parcels
  • 77//3/2/21 marla
  • 77//3/2/31 kanal 7 marla
  • 77//7/1/28 marla
  • 77//8/15 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhankot (hadbast 49), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 77//14.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,52,000 per sq yd

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan13 Feb 2020Approved Site Plan23 Nov 2019

Layout plan

2 files
Garden Hydrant Layout13 Feb 2020Latest Layout Plan23 Nov 2019

Building plans

3 files
Revised Approved Building Plan13 Feb 2020BR-Iii(approval of Building Plan)25 Nov 2019Approved Building Plans, Full Set23 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (40 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/950 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Clarion Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.