Skip to content

COUNTRYSIDE RESIDENCES

by Countryside Properties · Sector 65, Gurugram

Not on our price list yet

Possession 30 Jan 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 65, Gurugram2.4 km from Sohna Elevated Corridor (NH-248A), in a straight line
Registered by
COUNTRYSIDE PROPERTIES PRIVATE LIMITEDthe company that filed it, for Countryside Properties
Timeline
  1. 31 Jan 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jan 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Jan 2026Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside20,234 m² in all, by use
  • Plots for sale12,141 m² · 60%
  • Roads4,500 m² · 22%
  • Land for community services, handed to the government2,023 m² · 10%
  • Parks and playgrounds1,518 m² · 8%
  • Electricity sub-station32 m² · under 1%
  • Sewage and waste treatment20 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 65, GurugramSector 65, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.4 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is COUNTRYSIDE RESIDENCES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/577/309/2022/52. Ended 31 Jan 2026. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for COUNTRYSIDE RESIDENCES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jan 2026. Its registration runs to 31 Jan 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around COUNTRYSIDE RESIDENCES?From the records · Map pin and road lines, read 6 Sep 2026

COUNTRYSIDE RESIDENCES is in Sector 65, Gurugram; the site address declared to HARERA is Sector-65 Gurgaon. In a straight line it is about 2.4 km from Sohna Elevated Corridor (NH-248A), 5.8 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building COUNTRYSIDE RESIDENCES?From the records · HARERA, read 4 Nov 2026

COUNTRYSIDE RESIDENCES is a Countryside Properties project, registered by its company COUNTRYSIDE PROPERTIES PRIVATE LIMITED.

The source ↗Countryside Properties's projects and court record

The records

What the registers hold for COUNTRYSIDE RESIDENCES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/577/309/2022/52: Registration expired. Ended 31 Jan 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 10 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 30 Jan 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 31 Jan 2022, building plans 31 Jan 2022.Declared to HARERA, read 29 Oct 2026
The court record of Countryside Properties’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Jan 2026. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 10 OF 2022 ends soon

    Named in this project’s application. Valid to 30 Jan 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 23 HARERA files, with the dates we read them
Registration no.
GGM/577/309/2022/52
Registration valid till
31 Jan 2026
Declared possession
30 Jan 2026

Declared by the promoter to HARERA

Land area
5 (Acre) (20,234.28 sq m)
FAR
0 proposed of 0 permissible
licence
LIC NO 10 OF 2022 DT 31 JAN 2022 GRANTED FOR AFFORDABLE PLOTTED COLONY UNDER DDJAY BY DTCP HARYANA CHANDIGARH
Estimated project cost
₹91.95 crore
Cost of land
₹15.68 crore
Layout plan, declared approved (field 5a)
31 Jan 2022; Part E of the same form gives 1 Feb 2022
Building plans, declared approved
31 Jan 2022
Construction to start
1 May 2022
Completion declared for
30 Jan 2026
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LOI FOR THE PROJECT — declared: already been obtained (8 Nov 2021)
  • II. LICENSE FOR THE PROJECT — declared: already been obtained (31 Jan 2022)
  • III. PROJECT LAYOUT PLAN — declared: already been obtained (1 Feb 2022)
  • IV. NOC FOR FOREST AND ARAVALLI ACT/NOTIFICATION — declared: already been obtained (13 Jan 2022)
  • V. CLARIFICATION FOR APPLICABILITY OF FOREST LAW ON NON-FOREST LAND — declared: already been obtained (10 Sept 2021)
  • VI. NON-ENCUMBRANCE CERTIFICATE — declared: already been obtained (17 Nov 2021)
  • VII. ENVIRONMENT CLEARANCE — declared: already been obtained (11 Apr 2022)
  • VIII. DEMARCATION PLAN — declared: already been obtained (10 Mar 2022)
On file with HARERA · 23 files

On file with HARERA (23)

Plans

Site plan

1 file
Approved Site Plan23 Apr 2022

Layout plan

2 files
Superimposed Demarcation on Approved Layout16 May 2022Latest Layout Plan23 Apr 2022

Zoning plan

1 file
Zoning Plan23 Apr 2022

Demarcation plan

1 file
Demarcation Plan16 May 2022

Building plans

1 file
Approved Building Plans, Full Set23 Apr 2022

Services

Landscape and green areas

1 file
Landscape Plan16 May 2022

Service plans

1 file
Service Plans on the Layout23 Apr 2022

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate20 Mar 2026

DTCP licence

1 file
Licence Copy with Land Schedule23 Apr 2022

Sales papers

Allotment and sale agreements

2 files
Plot Buyer Agreement22 Apr 2022Allotment Letter22 Apr 2022

Money

Accounts and finance

6 files
Cash Flow Statement25 May 2022Non-Default Certificate from a CA16 May 2022Net Cash Flow23 Apr 2022

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit25 May 2022Affidavit on Community Area Handover16 May 2022

HARERA’s orders

HARERA’s orders

1 file
Amendment in the Registration Certificate after change in saleable area of the project pursuant to the revision in layout plan10 Jul 2023

Other filings

Other filings

2 files
(Supplementary Document)21 May 2022Google Location of Project22 Apr 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

10 OF 2022 · Countryside Properties Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 30 Jan 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Apr 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

10 OF 2022: 13 parcels, 5 acres in all, in Madabass (hadbast 85), tehsil Badshahpur.

The licence register prints the same licensed area, 5 acres.

  • 21//14/32 kanal
  • 21//15/14 kanal
  • 21//15/24 kanal
  • 21//16/13 kanal 12 marla
Show the other 9 parcels
  • 21//16/24 kanal 8 marla
  • 21//17/13 kanal
  • 21//25/2/16 marla
  • 21//5/2/14 marla
  • 21//5/2/2/25 kanal 5 marla
  • 21//68 kanal
  • 22//20/11 kanal 7 marla
  • 22//20/23 kanal 10 marla
  • 22//21/18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 85), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 21//14/3.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Apr 2022

Layout plan

2 files
Superimposed Demarcation on Approved Layout16 May 2022Latest Layout Plan23 Apr 2022

Building plans

1 file
Approved Building Plans, Full Set23 Apr 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (23 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1877 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Countryside Properties

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.