PRIME RESIDENCES
by Countryside Properties · Sector 65, Gurugram
Not on our price list yet
Possession 31 Dec 2029 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 65, Gurugram2.4 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- COUNTRY SIDE PROPERTIES PRIVATE LIMITEDthe company that filed it, for Countryside Properties
- 2 Jan 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
- 22 Oct 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Dec 2029Registration valid toHARERA, read 4 Nov 2026
- 31 Dec 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft646–935 sq ft236
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings2.073 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit AC
- KitchenMATT -satin finish vitrified tiles /anti skid ceremic tiles
- Lifts5-6 passenger elevator
- Wardrobes19 MM commercial board 1MM sunmica over IT
- FloorsItalian LOOK high gloss vitrified tiles 4X2/wooden flooring/antiskid tiles
- WallsWall putty , emulsion paints/ceramic tiles uptil lentil
- BathroomsISI MARK
- Windows8MM
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)2.4 km
- Delhi–Gurugram–SNB RRTS5.8 km
- Dwarka ExpresswayOpen, 17 Aug 20257.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
COUNTRYSIDE RESIDENCESNo photo on file yet | Countryside Properties | Same sector | — | — | 30 Jan 2026 |
| Emaar MGF Land | Same sector | — | — | 31 Dec 2022 | |
No photo of the project on file yet | Manglam Multiplex | Same sector | — | — | — |
No photo of the project on file yet | Olive Realcon Pvt. Ltd. and Manglam Multiplex | Same sector | — | — | — |
No photo of the project on file yet | Olive Realcon Pvt. Ltd. and Manglam Multiplex | Same sector | — | — | — |
No photo of the project on file yet | Manglam Multiplex | Same sector | — | — | 28 Feb 2027 |
| Emaar MGF Land | Same sector | — | — | 31 Mar 2020 | |
| Emaar MGF Land | Same sector | — | — | 31 Aug 2022 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is PRIME RESIDENCES registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/900/632/2025/03. Valid to 30 Dec 2029.
The source ↗What is the possession timeline for PRIME RESIDENCES?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2029. Its registration runs to 30 Dec 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around PRIME RESIDENCES?From the records · Map pin and road lines, read 6 Sep 2026
PRIME RESIDENCES is in Sector 65, Gurugram; the site address declared to HARERA is Sector-65, Village Maidawas. In a straight line it is about 2.4 km from Sohna Elevated Corridor (NH-248A), 5.8 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building PRIME RESIDENCES?From the records · HARERA, read 4 Nov 2026
PRIME RESIDENCES is a Countryside Properties project, registered by its company COUNTRY SIDE PROPERTIES PRIVATE LIMITED.
The source ↗Countryside Properties's projects and court recordThe records
What the registers hold for PRIME RESIDENCES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/900/632/2025/03: Registered. Valid to 30 Dec 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 10 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 30 Jan 2027.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 2 Jan 2023, building plans 22 Oct 2024.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Licence 10 OF 2022 ends soon
Named in this project’s application. Valid to 30 Jan 2027. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 20 HARERA files, with the dates we read them
- Registration no.
- GGM/900/632/2025/03
- Registration valid till
- 30 Dec 2029
- Declared possession
- 31 Dec 2029
Declared by the promoter to HARERA
- Land area
- 2.0728257 (Acre) (8,388.43 sq m)
- FAR
- 2.5 proposed of 2.64 permissible
- licence
- 10 OF 2022 DATED 31.01.2022
- Estimated project cost
- ₹372.26 crore
- Cost of land
- ₹75.24 crore
- Layout plan, declared approved (field 5a)
- 2 Jan 2023
- Building plans, declared approved
- 22 Oct 2024
- Construction to start
- 1 Dec 2024
- Completion declared for
- 31 Dec 2029
Declared inventory · 6 types
Declared inventory
- Apartment/Shops/Other Buildings · 68 units · 86.892 sq m carpet · 17 towers · one flat
- Apartment/Shops/Other Buildings · 8 units · 66.69 sq m carpet · 2 towers · one flat
- Apartment/Shops/Other Buildings · 36 units · 60.034 sq m carpet · 9 towers · one flat
- Apartment/Shops/Other Buildings · 4 units · 84.541 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 116 units · 86.76 sq m carpet · 29 towers · one flat
- Apartment/Shops/Other Buildings · 4 units · 86.041 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 11
Statutory approvals, as declared
- I. LAND LICENSE (10 OF 2022) — declared: already been obtained (31 Jan 2022)
- II. LAYOUT CUM DEMARCATION PLAN — declared: already been obtained (2 Jan 2023)
- III. ZONING PLAN — declared: already been obtained (22 Jan 2023)
- IV. LOI — declared: already been obtained (8 Nov 2021)
- V. LC- IV — declared: already been obtained (31 Jan 2022)
- VI. EC — declared: already been obtained (25 Jun 2022)
- VII. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (26 Nov 2021)
- VIII. ASSURANCE FOR SEWAGE DISPOSAL — declared: already been obtained (12 Apr 2022)
- IX. ASSURANCE FOR ELECTRICITY — declared: already been obtained (24 May 2022)
- X. BRS - III — declared: already been obtained (22 Oct 2024)
- XI. ASSURANCE FOR ROAD CONNECTIVITY — declared: already been obtained (7 Jan 2023)
On file with HARERA · 20 files
On file with HARERA (20)
Plans
Site plan
1 fileLayout plan
2 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
6 filesServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileEnvironment clearance
1 fileLand records
Land records
1 fileMoney
Accounts and finance
4 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
10 OF 2022 · Countryside Properties Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 30 Jan 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Nov 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
10 OF 2022: 13 parcels, 5 acres in all, in Madabass (hadbast 85), tehsil Badshahpur.
The licence register prints the same licensed area, 5 acres.
- 21//14/32 kanal
- 21//15/14 kanal
- 21//15/24 kanal
- 21//16/13 kanal 12 marla
Show the other 9 parcels
- 21//16/24 kanal 8 marla
- 21//17/13 kanal
- 21//25/2/16 marla
- 21//5/2/14 marla
- 21//5/2/2/25 kanal 5 marla
- 21//68 kanal
- 22//20/11 kanal 7 marla
- 22//20/23 kanal 10 marla
- 22//21/18 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 85), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 21//14/3.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
2 filesBuilding plans
6 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (20 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3128 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Countryside Properties
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
![M3M Latitude [Tower R-01]: no photo yet, the developer's logo](/developer-logos/manglam-multiplex.png)
