Emerald Estate

by Emaar MGF Land · Sector 65, Gurugram

Not on our price list yet

Possession 31 Aug 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 65, Gurugram2.4 km from Sohna Elevated Corridor (NH-248A), in a straight line
Home types
2, 3 and 4 BHK
Carpet area
748–1,470 sq ft
In m²about 69–137 m², as declared
Registered
24 Aug 2017
Registered by
EMAAR MGF LAND LIMITEDthe company that filed it, for Emaar MGF Land
Timeline
  1. 29 Dec 2009Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
  3. 23 Aug 2022Registration valid toHARERA, read 3 Nov 2026
  4. 31 Aug 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

666homes, 748 to 1,470 sq ft of carpet area
  • Under 1,000 sq ft748–964 sq ft384
  • 1,000–1,500 sq ft1,144–1,470 sq ft282

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11.69 acres in all, by use
  • Roads5.287 acres · 45%
  • Apartment buildings2.937 acres · 25%
  • Parks and playgrounds1.987 acres · 17%
  • Parking1.369 acres · 12%
  • Sewage and waste treatment0.092 acres · under 1%
  • Electricity sub-station0.018 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified / ceramic tiles/ granite counters
  • LiftsProvided
  • FloorsVitrified tiles / ceramic tiles / antiskid tiles
  • WallsOil bound distemper / dry distemper / weather proof paint
  • BathroomsWhite chinaware & CP fittings
  • WindowsUPVC
  • Main doorSeasoned hardwood frames with flush shutters
  • Electrical fittingsModular switches

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 65, GurugramSector 65, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.4 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 19
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Emerald Estate registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 104 OF 2017, registered on 24 Aug 2017. Ended 23 Aug 2022. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Emerald Estate?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2022. Its registration runs to 23 Aug 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Emerald Estate?From the records · Map pin and road lines, read 6 Sep 2026

Emerald Estate is in Sector 65, Gurugram; the site address declared to HARERA is Sector-65. In a straight line it is about 2.4 km from Sohna Elevated Corridor (NH-248A), 5.8 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Emerald Estate?From the records · HARERA, read 3 Nov 2026

Emerald Estate is a Emaar MGF Land project, registered by its company EMAAR MGF LAND LIMITED.

The source ↗Emaar MGF Land's projects and court record

The records

What the registers hold for Emerald Estate: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 104 OF 2017: Registration expired. Ended 23 Aug 2022.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 6 OF 2008 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 16 Jan 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 29 Dec 2009, building plans 29 Dec 2009.Declared to HARERA, read 29 Oct 2026
The court record of Emaar MGF Land’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 23 Aug 2022. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 6 OF 2008 validity ended

    Named in this project’s application. Valid to 16 Jan 2025. The register links a completion certificate (LC-IX), dated 15 Apr 2026, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 29 HARERA files, with the dates we read them
Registration no.
104 OF 2017
Registration date
24 Aug 2017
Registration valid till
23 Aug 2022
Declared possession
31 Aug 2022

Declared by the promoter to HARERA

Land area
11.69 (Acre) (47,307.75 sq m)
FAR
the application prints 173, which is not a ratio
licence
06 of 2008
Estimated project cost
₹382.17 crore
Cost of land
₹17.68 crore
Layout plan, declared approved (field 5a)
29 Dec 2009
Building plans, declared approved
29 Dec 2009
Completion declared for
31 Aug 2022
Declared inventory · 16 types

Declared inventory — 16 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER - E , ( 3BHK ) · 24 units · 83.707 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER - F , ( 3BHK ) · 24 units · 89.542 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER - F , ( 2BHK ) · 48 units · 69.49 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -G , ( 3BHK ) · 24 units · 89.542 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -G , ( 3BHK ) · 48 units · 83.707 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -H , ( 3BHK ) · 24 units · 89.542 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -H , ( 3BHK ) · 24 units · 83.707 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER -H , ( 2BHK ) · 24 units · 69.49 sq m carpet · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (17 Jan 2008)
  • II. LOI — declared: already been obtained (14 Dec 2007)
  • III. LC-IV — declared: already been obtained (17 Jan 2008)
  • IV. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (14 Jan 2010)
  • V. FIRE SCHEME APPROVAL — declared: already been obtained (26 Mar 2015)
  • VI. SERVICE PLAN ESTIMATES — declared: already been obtained (14 Oct 2016)
  • VII. BUILDING PLAN — declared: already been obtained (29 Dec 2009)
  • VIII. ENVIRONMENT CLEARANCE — declared: already been obtained (20 Jul 2010)
On file with HARERA · 29 files

On file with HARERA (29)

Plans

Site plan

1 file
Approved Site Plan1 Feb 2020

Layout plan

2 files
Layout Plan12 Mar 2020Latest Layout Plan4 Feb 2020

Zoning plan

1 file
Zoning Plan12 Mar 2020

Building plans

2 files
BR-III12 Mar 2020Approved Building Plans, Full Set12 Mar 2020

Services

Service plans

2 files
Service Plan Estimate Approval GH 25.499 Acres12 Mar 2020Service Plans on the Layout12 Mar 2020

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded24 Aug 2023OC uploaded24 Aug 2023

Completion certificate (CC)

1 file
CC uploaded13 May 2026

DTCP licence

4 files
License12 Mar 2020LC-IV & Lv-A. 25.499 Acres12 Mar 2020LOI 25.49912 Mar 2020Licence Copy with Land Schedule4 Feb 2020

Environment clearance

1 file
Environmental Clearance12 Mar 2020

Fire safety

1 file
Approval of Fire Fighting Scheme12 Mar 2020

Other NOCs and clearances

2 files
Aravalli NOC- Emerald Estate12 Mar 2020Airport Height Clearance12 Mar 2020

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration12 Mar 2020Non Encumbrance Certificate12 Mar 2020

Sales papers

Allotment and sale agreements

1 file
BBA and Allottment Letter12 Mar 2020

Money

Accounts and finance

5 files
Non-Default Certificate from a CA12 Mar 2020Cash Flow Statement12 Mar 2020Annual Report 2016-174 Feb 2020

The promoter’s papers

Declarations and affidavits

2 files
Rep-II12 Mar 2020The Promoter’s Declaration on Affidavit4 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

6 OF 2008 · Emaar MGF Land · GURGAON-MANESAR

Licence valid to 16 Jan 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Feb 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

6 OF 2008: 39 parcels, 25.5 acres in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 25.5 acres.

  • 31//1/13 kanal 11 marla
  • 31//1/23 kanal 16 marla
  • 31//108 kanal
  • 31//118 kanal
Show the other 35 parcels
  • 31//128 kanal
  • 31//2/13 kanal 11 marla
  • 31//2/23 kanal 16 marla
  • 31//6/114 marla
  • 31//6/110 marla
  • 31//6/26 kanal 16 marla
  • 31//98 kanal
  • 31//15min17 marla
  • 20//158 kanal
  • 20//172 kanal
  • 20//176 kanal
  • 20//218 kanal
  • 20//228 kanal
  • 20//23/13 kanal 12 marla
  • 20//23/24 kanal 8 marla
  • 20//247 kanal
  • 20//241 kanal
  • 20//25/13 kanal 10 marla
  • 20//25/12 marla
  • 20//25/24 kanal 8 marla
  • 32//137 kanal 2 marla
  • 32//147 kanal 16 marla
  • 32//158 kanal
  • 32//37 kanal 7 marla
  • 32//47 kanal 7 marla
  • 32//57 kanal 7 marla
  • 32//68 kanal
  • 32//78 kanal
  • 32//88 kanal
  • 21//21/13 kanal 12 marla
  • 21//21/2/13 kanal 2 marla
  • 30//1/16 kanal 12 marla
  • 30//10/26 kanal 12 marla
  • 20//16/23 kanal
  • 20//16/212 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Madabass (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 31//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

this sector, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan1 Feb 2020

Layout plan

2 files
Layout Plan12 Mar 2020Latest Layout Plan4 Feb 2020

Building plans

2 files
BR-III12 Mar 2020Approved Building Plans, Full Set12 Mar 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (29 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1047 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emaar MGF Land

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.