by Solutrean Building Technologies · Sector 95, Gurugram

Not on our price list yet

Possession 30 Jun 2024 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 95, Gurugram5.0 km from Dwarka Expressway, in a straight line
Registered by
SOLUTREAN BUILDING TECHNOLOGIES PVT LTDthe company that filed it, for Solutrean Building Technologies
Timeline
  1. 10 Mar 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Jun 2024Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Aug 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.512 acres in all, by use
  • Plots for sale4.02 acres · 62%
  • Other uses0.785 acres · 12%
  • Land for community services, handed to the government0.651 acres · 10%
  • Roads0.565 acres · 9%
  • Parks and playgrounds0.491 acres · 8%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 95, GurugramSector 95, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20255.0 km
  • Delhi–Gurugram–SNB RRTS6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is GATEWAY95 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/607/339/2022/82. Ended 30 Aug 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for GATEWAY95?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2024. Its registration runs to 30 Aug 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GATEWAY95?From the records · Map pin and road lines, read 6 Sep 2026

GATEWAY95 is in Sector 95, Gurugram; the site address declared to HARERA is Gateway95 Sector95 Village Dhorka Tehsil Harsaru District Gurugram Haryana. In a straight line it is about 5.0 km from Dwarka Expressway and 6.0 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GATEWAY95?From the records · HARERA, read 4 Nov 2026

GATEWAY95 is a Solutrean Building Technologies project, registered by its company SOLUTREAN BUILDING TECHNOLOGIES PVT LTD.

The source ↗Solutrean Building Technologies's projects and court record

The records

What the registers hold for GATEWAY95: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/607/339/2022/82: Registration expired. Ended 30 Aug 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 17 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 8 Mar 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 Mar 2022.Declared to HARERA, read 29 Oct 2026
The court record of Solutrean Building Technologies’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Aug 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 17 OF 2022 ends soon

    Named in this project’s application. Valid to 8 Mar 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 52 HARERA files, with the dates we read them
Registration no.
GGM/607/339/2022/82
Registration valid till
30 Aug 2025
Declared possession
30 Jun 2024

Declared by the promoter to HARERA

Land area
6.50625 (Acre) (26,329.86 sq m)
FAR
0 proposed of 0 permissible
licence
TCP17 of 2022 dated 09March2022
Estimated project cost
₹72.78 crore
Cost of land
₹42.13 crore
Layout plan, declared approved (field 5a)
10 Mar 2022
Construction to start
1 Jul 2022
Completion declared for
30 Jun 2024
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (9 Mar 2022)
  • II. ZONNING PLAN — declared: already been obtained (3 Jun 2022)
  • III. LAYOUT PLAN — declared: already been obtained (10 Mar 2022)
On file with HARERA · 52 files

On file with HARERA (52)

Plans

Site plan

1 file
Approved Site Plan3 Aug 2022

Layout plan

2 files
Community Area Sector-95 Layout10 Sept 2022Latest Layout Plan10 Sept 2022

Zoning plan

2 files
Zoning Plan10 Sept 2022Approval of Zonning Plan Letter10 Sept 2022

Demarcation plan

1 file
Demarcation Plan10 Sept 2022

Building plans

1 file
Approved Building Plans, Full Set3 Aug 2022

Services

Sewerage and drainage

5 files
Approved Sewarage Scheme Gateway 9510 Sept 2022Approved Storm Water Drainage Gateway 9510 Sept 2022GMDA-STP Treated Water for Construction10 Sept 2022

Water supply

2 files
Approved Water Supply Scheme Gateway 9510 Sept 2022GMDA-Assurance of Water Supply10 Sept 2022

Electricity

3 files
Assurance Letter- Power Supply10 Sept 2022Electrifiication Load Approval10 Sept 2022Street Light Plan Gateway 9510 Sept 2022

Roads

1 file
Approved Road Plan Gateway 9510 Sept 2022

Landscape and green areas

1 file
Landscape Plan Gateway 9510 Sept 2022

Service plans

4 files
Service Estimate Approval 21.07.202210 Sept 2022Sector- 95 Service Estimate Report10 Sept 2022Haryana Shehari Vikas Pradhikaran Service Plan 16-05-202210 Sept 2022Service Plans on the Layout3 Aug 2022

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded4 Aug 2025

DTCP licence

3 files
LC-III, LOI10 Sept 2022LC IV10 Sept 2022Licence Copy with Land Schedule3 Aug 2022

Other NOCs and clearances

1 file
Clarification Forest NOC10 Sept 2022

Land records

Land records

4 files
Jamabandi Fard Village Dhorka Sector 95 Gurgaon10 Sept 2022Revenue Record Entry of Licence and Collaboration10 Sept 2022Non Encumbrance -Sum-Search Report10 Sept 2022Non Encumbrance -Sum-Search Report 210 Sept 2022

Sales papers

Allotment and sale agreements

2 files
Plotting Inventory Freeze Plots Gateway 9510 Sept 2022Plotting Inventory Gateway 95 29.06.202210 Sept 2022

Money

Accounts and finance

6 files
Approval of Service Plan IDC10 Sept 2022Non-Default Certificate from a CA10 Sept 2022Form LC-IV-B EDC Agreement10 Sept 2022

Timeline and progress

Construction schedule

1 file
PERT Chart GATEWAY9510 Sept 2022

The promoter’s papers

Declarations and affidavits

8 files
Affidavit Bank Accounts GATEWAY9510 Sept 2022Affidavit Environment Clearance GATEWAY9510 Sept 2022Affidavit Forest Land GATEWAY9510 Sept 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 20 of 2024 dated 14.10.202420 Nov 2024

Other filings

Other filings

2 files
Aksh Cizara-Dhorka Sector 95 Gurgaon10 Sept 2022Gift Deed Vasika No. 3505 Dt. 28-06-202210 Sept 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

17 OF 2022 · Solutrean Building Technologies Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 8 Mar 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Aug 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

17 OF 2022: 15 parcels, 6.5062 acres in all, in Dhorka (hadbast 120), tehsil Harsaru.

The licence register prints the same licensed area, 6.5063 acres.

  • 30//3/22 kanal 6 marla
  • 30//4/13 kanal 18 marla
  • 30//4/22 marla
  • 30//4/3/13 kanal 17 marla
Show the other 11 parcels
  • 30//5/14 kanal 15 marla
  • 30//7/216 marla
  • 29//1/114 marla
  • 22//168 kanal
  • 22//17/14 kanal
  • 22//247 kanal 15 marla
  • 22//245 marla
  • 22//25/17 kanal 12 marla
  • 22//25/28 marla
  • 23//20/24 kanal 5 marla
  • 23//20/33 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhorka (hadbast 120), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//3/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan3 Aug 2022

Layout plan

2 files
Community Area Sector-95 Layout10 Sept 2022Latest Layout Plan10 Sept 2022

Building plans

1 file
Approved Building Plans, Full Set3 Aug 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (52 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2057 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Solutrean Building Technologies

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.