GLS COURTYARD

by GLS Infraprojects · Sector 95, Gurugram

Not on our price list yet

Possession 10 Jul 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 95, Gurugram5.0 km from Dwarka Expressway, in a straight line
Registered by
GLS INFRAPROJECTS PVT. LTDthe company that filed it, for GLS Infraprojects
Timeline
  1. 12 Jul 2023Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 2 Apr 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 10 Jul 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,530 m² in all, by use
  • Plots for sale5,435 m² · 35%
  • Other usesas the form names them: Internal, Utility3,313 m² · 21%
  • Parking3,015 m² · 19%
  • Roads2,540 m² · 16%
  • Green belts1,226 m² · 8%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 95, GurugramSector 95, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20255.0 km
  • Delhi–Gurugram–SNB RRTS6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 2
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is GLS COURTYARD registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/815/547/2024/42. Valid to 10 Jul 2028.

The source ↗
What is the possession timeline for GLS COURTYARD?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 10 Jul 2028. Its registration runs to 10 Jul 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around GLS COURTYARD?From the records · Map pin and road lines, read 6 Sep 2026

GLS COURTYARD is in Sector 95, Gurugram; the site address declared to HARERA is Revenue Estate Of Village Dhorka, Sector 95, Gurugram, Haryana. In a straight line it is about 5.0 km from Dwarka Expressway and 6.0 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building GLS COURTYARD?From the records · HARERA, read 4 Nov 2026

GLS COURTYARD is a GLS Infraprojects project, registered by its company GLS INFRAPROJECTS PVT. LTD.

The source ↗GLS Infraprojects's projects and court record

The records

What the registers hold for GLS COURTYARD: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/815/547/2024/42: Registered. Valid to 10 Jul 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 103 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 7 Dec 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 12 Jul 2023, building plans 2 Apr 2024.Declared to HARERA, read 29 Oct 2026
The court record of GLS Infraprojects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 103 OF 2021 ends soon

    Named in this project’s application. Valid to 7 Dec 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 94 HARERA files, with the dates we read them
Registration no.
GGM/815/547/2024/42
Registration valid till
10 Jul 2028
Declared possession
10 Jul 2028

Declared by the promoter to HARERA

Land area
3.8375 (Acre) (15,529.81 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
License no. 103 of 2021 dated 08.12.2021 and License no. 145 of 2023 dated 11.07.2023
Estimated project cost
₹75.30 crore
Cost of land
₹29.93 crore
Layout plan, declared approved (field 5a)
12 Jul 2023
Building plans, declared approved
2 Apr 2024
Construction to start
1 Sept 2023
Completion declared for
10 Jul 2028
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE 103 OF 2021 — declared: already been obtained (8 Dec 2021)
  • II. LICENSE 145 OF 2023 — declared: already been obtained (11 Jul 2023)
  • III. LAYOUT PLAN APPROVAL — declared: already been obtained (12 Jul 2023)
  • IV. SERVICE PLAN ESTMATES — declared: already been obtained (3 Apr 2024)
  • V. STANDARD DESIGN — declared: already been obtained (2 Apr 2024)
On file with HARERA · 94 files

On file with HARERA (94)

Plans

Site plan

1 file
Approved Site Plan17 Aug 2023

Layout plan

2 files
Layout Cum Demarcation Plan28 May 2024Latest Layout Plan15 Jul 2023

Zoning plan

1 file
Zoning Plan17 Aug 2023

Demarcation plan

2 files
Demarcation Plan19 Aug 2023Superimposed Demarcation17 Aug 2023

Building plans

21 files
B1 Section & Elevation28 May 2024E2 Section & Elevation28 May 2024C 3 to C 12 Section & Elevation28 May 2024

Floor plans

20 files
F 11 Floor Plan28 May 2024A11 Floor Plan28 May 2024D5 Floor Plan28 May 2024

Services

Sewerage and drainage

6 files
Service Plan- Storm Layout28 May 2024Service Plan- Sewer Layout28 May 2024Assurance Storm Water18 Aug 2023

Water supply

2 files
Service Plan- Water Supply Layout28 May 2024Assurance Water Supply18 Aug 2023

Electricity

3 files
Electricity Plan21 Aug 2023Street Light Plan21 Aug 2023Power Assurance17 Aug 2023

Roads

1 file
Service Plan- Road Layout28 May 2024

Service plans

4 files
Service Estimates Booklet28 May 2024Service Plan & Estimates Approval Letter28 May 2024Service Plans on the Layout17 Aug 2023Service Estimate17 Aug 2023

Approvals and clearances

DTCP licence

6 files
Licence Copy with Land Schedule18 Aug 2023License No. 103 of 2021 Dated 08.12.202117 Aug 2023LC IV & Bilateral Aggrement17 Aug 2023

Other NOCs and clearances

2 files
STP Water NOC18 Aug 2023Forest NOC17 Aug 2023

Land records

Land records

12 files
Search Report19 Aug 2023Aks Sizra18 Aug 2023Revenue Record Entry of Licence and Collaboration17 Aug 2023

Money

Accounts and finance

6 files
Demand Draft21 Aug 2023Project Report19 Aug 2023Non-Default Certificate from a CA19 Aug 2023

Timeline and progress

Construction schedule

1 file
PERT Chart19 Aug 2023

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit19 Aug 2023Bank Undertaking19 Aug 2023

Company papers

2 files
MOA17 Aug 2023AOA17 Aug 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

103 OF 2021 · GLS Infraprojects Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 7 Dec 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

145 OF 2023 · GLS Infraprojects Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 10 Jul 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Aug 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

103 OF 2021: 8 parcels, 2.9563 acres in all, in Dhorka (hadbast 120), tehsil Harsaru.

The licence register prints the same licensed area, 2.9563 acres.

  • 15//16/2/22 kanal 12 marla
  • 14//11/2/24 kanal 7 marla
  • 14//19/1/15 kanal 4 marla
  • 14//19/2/21 kanal 6 marla
Show the other 4 parcels
  • 14//20/1/15 kanal 3 marla
  • 14//20/1/22 kanal 9 marla
  • 14//21/2/12 kanal 10 marla
  • 14//22/12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

145 OF 2023: 2 parcels, 0.8812 acres in all, in Dhorka (hadbast 120), tehsil Harsaru.

The licence register prints the same licensed area, 0.8813 acres.

  • 14//11/2/13 kanal 5 marla
  • 14//12/13 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhorka (hadbast 120), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//16/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan17 Aug 2023

Layout plan

2 files
Layout Cum Demarcation Plan28 May 2024Latest Layout Plan15 Jul 2023

Building plans

21 files
B1 Section & Elevation28 May 2024E2 Section & Elevation28 May 2024C 3 to C 12 Section & Elevation28 May 2024F3 Section & Elevation28 May 2024A11 Section & Elevation28 May 2024A2 to A10, B2 to B 9 Section & Elevation28 May 2024

Floor plans

20 files
F 11 Floor Plan28 May 2024A11 Floor Plan28 May 2024D5 Floor Plan28 May 2024E2 Floor Plan28 May 2024B 10 Floor Plan28 May 2024F2 Floor Plan28 May 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (94 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2554 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on GLS Infraprojects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.