Skip to content

Group Housing Colony (The Roselia)

by Forever Buildtech · Sector 95, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 95, Gurugram5.0 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
514–644 sq ft
In m²about 48–60 m², as declared
Registered
20 Jun 2017
Registered by
FOREVER BUILDTECH PRIVATE LIMITEDthe company that filed it, for Forever Buildtech
Timeline
  1. 20 Jun 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 17 May 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

1,101homes, 514 to 644 sq ft of carpet area
  • Under 1,000 sq ft514–644 sq ft1,101

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside32,512 m² in all, by use
  • Parking14,303 m² · 44%
  • Apartment buildings6,533 m² · 20%
  • Green belts5,712 m² · 18%
  • Roads5,288 m² · 16%
  • Electricity sub-station457 m² · 1%
  • Land for community services, handed to the government219 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenISI marked
  • FloorsVitrified & ceramic tiles
  • WallsOBD
  • BathroomsISI marked
  • WindowsUPVC
  • Main doorFlush door
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 95, GurugramSector 95, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20255.0 km
  • Delhi–Gurugram–SNB RRTS6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Group Housing Colony (The Roselia) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 05 OF 2017, registered on 20 Jun 2017. Ended 17 May 2021. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Group Housing Colony (The Roselia)?From the records · Map pin and road lines, read 6 Sep 2026

Group Housing Colony (The Roselia) is in Sector 95, Gurugram; the site address declared to HARERA is Village Wazirpur Jharsa Sector 95 A. In a straight line it is about 5.0 km from Dwarka Expressway and 6.0 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Group Housing Colony (The Roselia)?From the records · HARERA, read 4 Nov 2026

Group Housing Colony (The Roselia) is a Forever Buildtech project, registered by its company FOREVER BUILDTECH PRIVATE LIMITED.

The source ↗Forever Buildtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Group Housing Colony (The Roselia): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 05 OF 2017: Registration expired. Ended 17 May 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 13 OF 2016 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 30 Jun 2026.DTCP, read 3 Nov 2026
The court record of Forever Buildtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 17 May 2021. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 13 OF 2016 validity ended

    Named in this project’s application. Valid to 30 Jun 2026. The register links a completion certificate (LC-IX), dated 15 Jul 2026, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 7 HARERA files, with the dates we read them
Registration no.
05 OF 2017
Registration date
20 Jun 2017
Registration valid till
17 May 2021

Declared by the promoter to HARERA

Land area
8.034 (Acre) (32,512.44 sq m)
FAR
the application prints 225, which is not a ratio
licence
13 OF 2016 DATED 26/09/2016
Estimated project cost
₹231.69 crore
Cost of land
₹63.16 crore
Declared inventory · 21 types

Declared inventory — 21 types declared, first 8 shown

  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T STORE · 52 units · 59.815 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(A) · 48 units · 52.884 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(B) · 50 units · 47.777 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(A) · 51 units · 52.884 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(B) · 52 units · 47.777 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(A) · 51 units · 52.884 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(B) · 52 units · 47.777 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type 2B+2T(A) · 51 units · 52.884 sq m carpet · one flat
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. ENVIRONMENT CLEARANCE VIDE ENDST. NO. SEIAA/HR/2017/324 — declared: already been obtained (18 May 2017)
  • II. AIRPORT HEIGHT CLEARANCE VIDE NOCID NO. PALM/NORTH/B/120217/265774 — declared: already been obtained (2 Dec 2017)
  • III. LICENSE NO 13 OF 2016 — declared: already been obtained (26 Sept 2016)
  • IV. FOREST NOC VIDE LETTER NO 2734.G — declared: already been obtained (6 Dec 2017)
  • V. POWER ASSURANCE FROM DHBVN VIDE MEMO NO. CH. O4/DRG-PLC — declared: already been obtained (20 Nov 2017)
  • VI. SEWERAGE ASSURANCE VIDE MEMO NO. 214970 — declared: already been obtained (15 Nov 2017)
  • VII. WATER ASSURANCE VIDE MEMO NO. 214061 — declared: already been obtained (15 Nov 2017)
On file with HARERA · 7 files

On file with HARERA (7)

Plans

Site plan

1 file
Approved Site Plan29 Nov 2019

Layout plan

1 file
Latest Layout Plan29 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded8 Aug 2023

Completion certificate (CC)

1 file
Completion certificate uploaded4 Aug 2026

DTCP licence

1 file
Licence Copy with Land Schedule29 Nov 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA29 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit29 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

13 OF 2016 · Forever Buildtech Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 30 Jun 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

13 OF 2016: 18 parcels, 8.0344 acres in all, in Wazirpur (hadbast 115), tehsil Harsaru.

The licence register prints the same licensed area, 8.03 acres.

  • 49//22/12 kanal 4 marla
  • 49//22/25 kanal 16 marla
  • 49//23/1/11 kanal 10 marla
  • 49//23/2/11 kanal 10 marla
Show the other 14 parcels
  • 57//118 kanal
  • 57//128 kanal
  • 57//13/16 kanal 1 marla
  • 57//17/23 kanal 11 marla
  • 57//18/1/22 kanal 18 marla
  • 57//18/22 kanal 18 marla
  • 57//19/2/114 marla
  • 57//19/2/23 kanal 6 marla
  • 57//28 kanal
  • 57//23/1/25 marla
  • 57//24/1/22 kanal 16 marla
  • 57//261 kanal 12 marla
  • 57//3/13 kanal
  • 57//8/22 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Wazirpur (hadbast 115), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 49//22/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 95, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan29 Nov 2019

Layout plan

1 file
Latest Layout Plan29 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (7 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/984 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Forever Buildtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.