Skip to content

Gurgaon Spectrum Centre

by Burman GSC Estate · Sector 82, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 82, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
346 sq ft
In m²about 32–32 m², as declared
Registered
18 Sep 2017
Registered by
BURMAN ESTATE PRIVATE LIMITEDthe company that filed it, for Burman GSC Estate
Timeline
  1. 31 Aug 2015Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 4 Nov 2015Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 18 Sep 2017Registered with HARERAHARERA, read 3 Nov 2026
  4. 30 Jun 2020Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

246homes, 346 to 346 sq ft of carpet area
  • Under 1,000 sq ft346 sq ft246

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 54 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside17,957 m² in all, by use
  • Other uses6,114 m² · 34%
  • Apartment buildings5,880 m² · 33%
  • Roads2,000 m² · 11%
  • Green belts1,100 m² · 6%
  • Parking988 m² · 6%
  • Land for community services, handed to the government675 m² · 4%
  • Pavements610 m² · 3%
  • Electricity sub-station400 m² · 2%
  • Sewage and waste treatment190 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit units, DSV, cassette VRV
  • KitchenKOTA stone, antiskide tiles
  • Kitchen appliancesKettle, fridge, induction
  • LiftsPassenger lifts, sscage 8 NOS
  • WardrobesPLY boards, laminate, stone top, sink (SS)
  • FloorsTiles, stone, IPS
  • WallsPOP, paint, stone
  • BathroomsCP sanitary white fixture

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 82, GurugramSector 82, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20252.8 km
  • Sohna Elevated Corridor (NH-248A)8.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Gurgaon Spectrum Centre registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 222 OF 2017, registered on 18 Sep 2017. The register’s record shows an end date of 30 Jun 2020. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Gurgaon Spectrum Centre?From the records · Map pin and road lines, read 6 Sep 2026

Gurgaon Spectrum Centre is in Sector 82, Gurugram; the site address declared to HARERA is Sector 82 A Gurugram. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 2.8 km from Dwarka Expressway and 8.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Gurgaon Spectrum Centre?From the records · HARERA, read 3 Nov 2026

Gurgaon Spectrum Centre is a Burman GSC Estate project, registered by its company BURMAN ESTATE PRIVATE LIMITED.

The source ↗Burman GSC Estate's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Gurgaon Spectrum Centre: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 222 OF 2017: Registration lapsed. The register’s record shows an end date of 30 Jun 2020.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 135 OF 2008 is on the DTCP register, valid to 27 Jun 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 31 Aug 2015, building plans 4 Nov 2015.Declared to HARERA, read 29 Oct 2026
The court record of Burman GSC Estate’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Jun 2020. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 33 HARERA files, with the dates we read them
Registration no.
222 OF 2017
Registration date
18 Sept 2017
Registration valid till
30 Jun 2020

Declared by the promoter to HARERA

Land area
17957.20 (Sqr/mtrs)
FAR
1.75 proposed
licence
135 of 2008(27-06-2020)
Estimated project cost
₹207.79 crore
Cost of land
₹47.28 crore
Layout plan, declared approved (field 5a)
31 Aug 2015
Building plans, declared approved
4 Nov 2015
Declared inventory · 2 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type SERVICED AAPARTMENT · 246 units · 32.12 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL SPACE · 54 units · 11.77 sq m carpet · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 10

Statutory approvals, as declared

  • I. AIRPORT AUTHORITY — declared: already been obtained (14 Jan 2016)
  • II. DEVELOPMENT BUILDING PLAN — declared: already been obtained (4 Nov 2015)
  • III. FIRE FIGHTING SCHEME — declared: already been obtained (18 Mar 2016)
  • IV. ENVIRONMENTAL CLEARENCE TO ESTABLISH CONSENT TO OPERATE — declared: already been obtained (23 Aug 2016)
  • V. WATER LOAD APPROVAL — declared: already been obtained (19 Feb 2016)
  • VI. MINING APPROVAL — declared: already been obtained (13 Jul 2016)
  • VII. LOAD SANCTION DEMAND — declared: already been obtained (10 Feb 2016)
  • VIII. PLOT LICENSE — declared: already been obtained
  • IX. ZIONING PLAN — declared: already been obtained (31 Aug 2015)
  • X. BUILDING PLAN — declared: already been obtained (4 Nov 2015)
On file with HARERA · 33 files

On file with HARERA (33)

Plans

Site plan

1 file
Approved Site Plan3 Dec 2019

Layout plan

1 file
Latest Layout Plan3 Dec 2019

Zoning plan

1 file
Zoning Plan3 Dec 2019

Demarcation plan

2 files
Approval Demarcation28 Feb 2020Demarcation Plan3 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set3 Dec 2019

Services

Water supply

2 files
Fresh Water Supply28 Feb 2020Fresh Water Supply3 Dec 2019

Electricity

1 file
Electricity Load3 Dec 2019

Service plans

1 file
Service Plans on the Layout3 Dec 2019

Approvals and clearances

DTCP licence

3 files
LOI28 Feb 2020LC IV D28 Feb 2020Licence Copy with Land Schedule28 Nov 2019

Environment clearance

2 files
Environment Clearance Certificate28 Feb 2020Environment Clearance Certificate3 Dec 2019

Fire safety

2 files
Fire Fighting Approval28 Feb 2020Fire Fighting Approval3 Dec 2019

Other NOCs and clearances

1 file
Height Clearence3 Dec 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration3 Dec 2019

Sales papers

Allotment and sale agreements

1 file
Agreement of Sales BBA3 Dec 2019

Money

Accounts and finance

10 files
Non-Default Certificate from a CA28 Feb 2020CA Certificate Q-228 Feb 2020Bank Detail- HARERA Collection 100 Percent28 Feb 2020

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit3 Dec 2019Application Form3 Dec 2019

Other filings

Other filings

1 file
Excavation Approval3 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

135 OF 2008 · Dr Fresh Real Estate Ventures · GURGAON-MANESAR

Licence valid to 27 Jun 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 7 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

135 OF 2008: 6 parcels, 4.4375 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.

The licence register prints the same licensed area, 4.44 acres.

  • rectangle 614, kila 61418 biswa
  • rectangle 615, kila 61514 biswa
  • rectangle 616, kila 61615 biswa
  • rectangle 617, kila 6173 bigha 15 biswa
Show the other 2 parcels
  • rectangle 641, kila 6414 biswa
  • rectangle 642, kila 64216 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 614, kila 614.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹1,44,100 per sq yd

Sector 82, collector rates effective 1 Apr 2026, Manesar tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan3 Dec 2019

Layout plan

1 file
Latest Layout Plan3 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set3 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (33 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/985 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Burman GSC Estate

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.