Tranquil Heights
by Vatika Group · Sector 82, Gurugram
Not on our price list yet
Possession 30 Jul 2018 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 82, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
- Carpet area
- about 1,136 sq ft
In m²
about 105.5 m², the average flat, as declared - Registered by
- VATIKA LIMITEDthe company that filed it, for Vatika Group
- 16 Feb 2017Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 17 Nov 2017Registered with HARERAHARERA, read 3 Nov 2026
- 30 Jul 2018Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 30 Apr 2021Registration valid toHARERA, read 3 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Other uses31,528 m² · 69%
- Parks and playgrounds6,816 m² · 15%
- Parking4,931 m² · 11%
- Apartment buildings1,993 m² · 4%
- Electricity sub-station129 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningAIR-conditioning through energy efficient VRV / VRF systems in all bedrooms and living rooms
- KitchenRefer section below
- Kitchen appliancesA COOK top & a chimney installation
- LiftsSpacious elevators with pleasing interiors. provision of a stretcher lift in all the cores
- FloorsRefer section below
- WallsRefer section below
- BathroomsRefer section below
- WindowsPainted hardwood frames for doors/aluminum or UPVC frame windows
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS1.3 km
- Dwarka ExpresswayOpen, 17 Aug 20252.8 km
- Sohna Elevated Corridor (NH-248A)8.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Registered, no OC or CC yet: 3
- Other register states: 10
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Vatika Group | Same sector | — | — | 31 Jan 2025 | |
No photo of the project on file yet | Vipul Group | Same sector | — | — | — |
| Vatika Group | Same sector | — | — | 31 Jul 2022 | |
No photo of the project on file yet | SS Group | 1.3 kmto its sector’s point | — | — | 20 Feb 2028 |
No photo of the project on file yet | Hero Realty | 1.3 kmto its sector’s point | — | — | 30 Jun 2027 |
| Sternal Buildcon | 1.3 kmto its sector’s point | — | — | 28 Feb 2026 | |
AVENUE 81 PHASE-2No photo on file yet | Gls Infracon | 1.3 kmto its sector’s point | — | — | 3 Oct 2027 |
Aster Court PremierNo photo on file yet | B.E. Office Automation Products | 1.3 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Tranquil Heights registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as 359 OF 2017, registered on 17 Nov 2017. The register’s record shows an end date of 30 Apr 2021. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Tranquil Heights?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Jul 2018. Its registration runs to 30 Apr 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Tranquil Heights?From the records · Map pin and road lines, read 6 Sep 2026
Tranquil Heights is in Sector 82, Gurugram; the site address declared to HARERA is Sector-82a, Village Shikohpur. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 2.8 km from Dwarka Expressway and 8.3 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Tranquil Heights?From the records · HARERA, read 3 Nov 2026
Tranquil Heights is a Vatika Group project, registered by its company VATIKA LIMITED.
The source ↗Vatika Group's projects and court recordThe records
What the registers hold for Tranquil Heights: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 359 OF 2017: Registration lapsed. The register’s record shows an end date of 30 Apr 2021.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 22 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 23 Mar 2017.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 16 Feb 2017, building plans 16 Feb 2017.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Licence 22 OF 2011 lapsed
Named in this project’s application. Valid to 23 Mar 2017; the register’s note: “(6.093 acres migrated to L.No. 19 of 2024)”. DTCP Haryana register, read 3 Nov 2026. Source
Amber flag: Registration lapsed
The register’s record shows an end date of 30 Apr 2021. HARERA Gurugram, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
- Registration no.
- 359 OF 2017
- Registration date
- 17 Nov 2017
- Registration valid till
- 30 Apr 2021
- Declared possession
- 30 Jul 2018
Declared by the promoter to HARERA
- Land area
- 11.218 (Acre) (45,397.64 sq m)
- FAR
- the application prints 57.09, which is not a ratio
- licence
- 22 of 2011 dated 24-03-2011
- Estimated project cost
- ₹134.61 crore
- Cost of land
- ₹4.05 crore
- Layout plan, declared approved (field 5a)
- 16 Feb 2017
- Building plans, declared approved
- 16 Feb 2017
- Completion declared for
- 30 Jul 2018
Declared inventory · 1 type
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX-20 · 169 units · 17,835.55 sq m carpet · total for 169 flats, about 105.5 m² each
Statutory approvals, as declared · 7
Statutory approvals, as declared
- I. LAY OUT PLAN — declared: already been obtained (16 Feb 2017)
- II. ZONING PLAN — declared: already been obtained (16 Dec 2015)
- III. BUILDING PLAN — declared: already been obtained (16 Feb 2017)
- IV. SITE PLAN — declared: already been obtained (16 Feb 2017)
- V. FLOOR PLAN — declared: already been obtained (16 Feb 2017)
- VI. APARTMENT PLANS — declared: already been obtained (16 Feb 2017)
- VII. ELEVATION SECTION — declared: already been obtained (16 Feb 2017)
On file with HARERA · 43 files
On file with HARERA (43)
Plans
Site plan
4 filesLayout plan
1 fileBuilding plans
6 filesFloor plans
2 filesApprovals and clearances
DTCP licence
1 fileLand records
Land records
4 filesSales papers
Allotment and sale agreements
4 filesMoney
Accounts and finance
10 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
3 filesCompany papers
4 filesHARERA’s orders
HARERA’s orders
2 filesOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
22 OF 2011 · Vatika Ltd. · GURGAON-MANESAR
Licence valid to 23 Mar 2017
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
22 OF 2011: 16 parcels, 11.2188 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.
The licence register prints the licensed area as 5.125 acres.
- rectangle 147, kila 1472 bigha
- rectangle 148, kila 1481 bigha 8 biswa
- rectangle 149, kila 14912 biswa
- rectangle 150, kila 1502 bigha
Show the other 12 parcels
- rectangle 162, kila 1622 bigha 4 biswa
- rectangle 57, kila 5718 biswa
- rectangle 58, kila 58/113 biswa
- rectangle 59, kila 59/211 biswa
- rectangle 60, kila 602 bigha 5 biswa
- rectangle 61, kila 611 bigha 14 biswa
- rectangle 152, kila 1528 biswa
- rectangle 153, kila 1538 biswa
- rectangle 154, kila 1548 biswa
- rectangle 155, kila 15513 biswa
- rectangle 156, kila 1561 bigha 9 biswa
- rectangle 157, kila 157min8 biswa
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 147, kila 147.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No collector rate for a residential flat in Sector 82 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
4 filesLayout plan
1 fileBuilding plans
6 filesFloor plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1119 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Vatika Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.