Town Square (Block D)

by Vatika Group · Sector 82, Gurugram

Not on our price list yet

Possession 31 Jan 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 82, Gurugram1.3 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
about 568 sq ft
In m²about 52.7 m², the average flat, as declared
Registered
22 Nov 2017
Registered by
VATIKA LIMITEDthe company that filed it, for Vatika Group
Timeline
  1. 22 Nov 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 31 Dec 2018Registration valid toHARERA, read 4 Nov 2026
  3. 31 Jan 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11,983 m² in all, by use
  • Other uses5,720 m² · 48%
  • Apartment buildings4,430 m² · 37%
  • Parking1,833 m² · 15%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningOffice space shall be AIR-conditioned through VRV / high wall splits
  • LiftsPassenger elevators designed to cater for the expected traffic with high quality finishes. dedicated service lift for movement of goods and materials.
  • WallsPlaster on walls
  • BathroomsSanitary WARE of standard make and brands for common toilets.
  • WindowsGlazed aluminum windows and fenestration along with curtain glass in locations
  • Electrical fittingsIs compliant light fittings in common areas.
  • Water storageOHT & UG tanks

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 82, GurugramSector 82, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.3 km
  • Dwarka ExpresswayOpen, 17 Aug 20252.8 km
  • Sohna Elevated Corridor (NH-248A)8.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 14 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 3
  • Other register states: 10

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Town Square (Block D) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 366 OF 2017, registered on 22 Nov 2017. The register’s record shows an end date of 31 Dec 2018. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Town Square (Block D)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jan 2025. Its registration runs to 31 Dec 2018; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Town Square (Block D)?From the records · Map pin and road lines, read 6 Sep 2026

Town Square (Block D) is in Sector 82, Gurugram; the site address declared to HARERA is Sector 82a, Village-Shikohpur, Tehsil-Manesar. In a straight line it is about 1.3 km from Delhi–Gurugram–SNB RRTS, 2.8 km from Dwarka Expressway and 8.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Town Square (Block D)?From the records · HARERA, read 4 Nov 2026

Town Square (Block D) is a Vatika Group project, registered by its company VATIKA LIMITED.

The source ↗Vatika Group's projects and court record

The records

What the registers hold for Town Square (Block D): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 366 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Dec 2018.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 110 OF 2010 is on the DTCP register: Licence lapsed; the register prints its validity to 28 Dec 2025.DTCP, read 3 Nov 2026
The court record of Vatika Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 110 OF 2010 lapsed

    Named in this project’s application. Valid to 28 Dec 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2018. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 55 HARERA files, with the dates we read them
Registration no.
366 OF 2017
Registration date
22 Nov 2017
Registration valid till
31 Dec 2018
Declared possession
31 Jan 2025

Declared by the promoter to HARERA

Land area
2.961 (Acre) (11,982.74 sq m)
FAR
the application prints 172.94, which is not a ratio
licence
110 of 2010 dated 29.12.2010
Estimated project cost
₹106.91 crore
Cost of land
₹1.05 crore
Completion declared for
31 Jan 2025
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type ANNEX-20 · 187 units · 9,861.38 sq m carpet · total for 187 flats, about 52.7 m² each
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LAY OUT PLAN — declared: already been obtained (15 Mar 2013)
  • II. ZONING PLAN — declared: already been obtained (30 Dec 2010)
  • III. BUILDING PLAN — declared: already been obtained (15 Mar 2013)
  • IV. SITE PLAN — declared: already been obtained (15 Mar 2013)
  • V. FLOOR PLAN — declared: already been obtained (15 Mar 2013)
  • VI. APARTMENT PLANS — declared: already been obtained (15 Mar 2013)
  • VII. ELEVATION SECTION — declared: already been obtained (15 Mar 2013)
  • VIII. SERVICE ESTIMATE — declared: already been obtained (30 Dec 2013)
On file with HARERA · 55 files

On file with HARERA (55)

Plans

Site plan

4 files
12 Location Plan21 Jan 2020Approved Site Plan21 Jan 202015 Site Plan21 Jan 202013 Sectorial Map21 Jan 2020

Layout plan

1 file
Latest Layout Plan21 Jan 2020

Zoning plan

1 file
Zoning Plan21 Jan 2020

Building plans

8 files
23 Architect and Engineer Certificate21 Jan 2020Tower D Elevation D21 Jan 2020Block D 14th Terrace Floor Plan21 Jan 2020

Floor plans

11 files
20 Detail of Unit21 Jan 2020Block D 12th 13th Floor Plan21 Jan 2020Block D 8th 9th Floor Plan21 Jan 2020

Services

Service plans

2 files
Service Plans on the Layout21 Jan 202018 Approval of Service Plan or Estimate for Comm21 Jan 2020

Approvals and clearances

Occupation certificate (OC)

1 file
2 Part Occupation Certificate of Town Square21 Jan 2020

DTCP licence

1 file
Licence Copy with Land Schedule21 Jan 2020

Land records

Land records

3 files
9 Revenue Records Sale Deed Etc21 Jan 202030 Encumbrances21 Jan 202011 Aks Shejra with Land Details21 Jan 2020

Sales papers

Allotment and sale agreements

5 files
32 Allottment Letter Commercial21 Jan 202025 Time Period Commited to Allottee21 Jan 202033 HRERA AFS Commercial Final21 Jan 2020

Money

Accounts and finance

8 files
10 Project Description and Cost21 Jan 2020Non-Default Certificate from a CA21 Jan 20205 Balance Sheet21 Jan 2020

Timeline and progress

Construction schedule

1 file
22 Development Work Plan21 Jan 2020

The promoter’s papers

Declarations and affidavits

3 files
1 Rep I21 Jan 2020The Promoter’s Declaration on Affidavit21 Jan 202031 Booking Application Form Commercial Final21 Jan 2020

Company papers

4 files
8 Resolution21 Jan 20204 MOA AOA21 Jan 20207 Shareholders21 Jan 20206 List of Directors21 Jan 2020

HARERA’s orders

HARERA’s orders

1 file
2 Registration Certificate21 Jan 2020

Other filings

Other filings

1 file
21 Annexure 3 321 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

110 OF 2010 · Vatika · GURGAON-MANESAR

Licence valid to 28 Dec 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 21 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

110 OF 2010: 1 parcel, 2.9609 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.

The licence register prints the same licensed area, 2.96 acres.

  • rectangle 633, kila 633/2min4 bigha 14 biswa 15 biswansi

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 633, kila 633/2min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹1,44,100 per sq yd

Sector 82, collector rates effective 1 Apr 2026, Manesar tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
12 Location Plan21 Jan 2020Approved Site Plan21 Jan 202015 Site Plan21 Jan 202013 Sectorial Map21 Jan 2020

Layout plan

1 file
Latest Layout Plan21 Jan 2020

Building plans

8 files
23 Architect and Engineer Certificate21 Jan 2020Tower D Elevation D21 Jan 2020Block D 14th Terrace Floor Plan21 Jan 202026 List of Architect Engineer Etc21 Jan 2020Tower D Elevation C21 Jan 2020Tower D Section 2 and 521 Jan 2020

Floor plans

11 files
20 Detail of Unit21 Jan 2020Block D 12th 13th Floor Plan21 Jan 2020Block D 8th 9th Floor Plan21 Jan 2020Tower D All Floor Area Calculation21 Jan 2020Block D Gf 1st Floor Plan21 Jan 2020Block D 4th 5th Floor Plan21 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (55 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1116 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Vatika Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.