INDIA WORLDMART

by Betterchoice Realtors · Sector 88A, Gurugram

Not on our price list yet

Possession 30 Sep 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
Registered by
BETTERCHOICE REALTORS PRIVATE LIMITEDthe company that filed it, for Betterchoice Realtors
Timeline
  1. 21 Feb 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2029Registration valid toHARERA, read 4 Nov 2026

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88A, GurugramSector 88A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS4.5 km
  • Sohna Elevated Corridor (NH-248A)7.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is INDIA WORLDMART registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/960/692/2025/63. Valid to 31 Dec 2029.

The source ↗
What is the possession timeline for INDIA WORLDMART?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2029. Its registration runs to 31 Dec 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around INDIA WORLDMART?From the records · Map pin and road lines, read 6 Sep 2026

INDIA WORLDMART is in Sector 88A, Gurugram; the site address declared to HARERA is Sector- 88a. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building INDIA WORLDMART?From the records · HARERA, read 4 Nov 2026

INDIA WORLDMART is a Betterchoice Realtors project, registered by its company BETTERCHOICE REALTORS PRIVATE LIMITED.

The source ↗Betterchoice Realtors's projects and court record

The records

What the registers hold for INDIA WORLDMART: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/960/692/2025/63: Registered. Valid to 31 Dec 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 100 OF 2024 is on the DTCP register, valid to 23 Jul 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 21 Feb 2024.Declared to HARERA, read 29 Oct 2026
The court record of Betterchoice Realtors’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 44 HARERA files, with the dates we read them
Registration no.
GGM/960/692/2025/63
Registration valid till
31 Dec 2029
Declared possession
30 Sept 2029

Declared by the promoter to HARERA

Land area
3.4583 (Acre) (13,995.24 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
100 OF 2024 DATED 24.07.2024 Memo No. Endst. No. LC-4634/JE(AK)/2024/23667
Estimated project cost
₹149.58 crore
Cost of land
₹99.50 crore
Layout plan, declared approved (field 5a)
21 Feb 2024
Construction to start
1 Apr 2025
Completion declared for
30 Sept 2029
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENSE NO 100 OF 2024 DATED 24.07.2024 — declared: already been obtained (24 Jul 2024)
  • II. LAYOUT PLAN — declared: already been obtained (21 Feb 2024)
  • III. ELECTRICAL LOAD — declared: already been obtained (11 Dec 2024)
  • IV. PHASING PLAN — declared: already been obtained (20 Dec 2024)
  • V. ARCHITECT CONTROL SHEET — declared: already been obtained (24 Apr 2024)
On file with HARERA · 44 files

On file with HARERA (44)

Plans

Site plan

1 file
Approved Site Plan26 Jun 2025

Layout plan

3 files
Approved Phasing Plan26 Jun 2025Latest Layout Plan26 Jun 2025Approval of Phasing Plan27 Feb 2025

Zoning plan

1 file
Zoning Plan26 Jun 2025

Demarcation plan

1 file
Demarcation Plan26 Jun 2025

Building plans

14 files
E2 to E7 Floor Plans, Elevation & Section26 Jun 2025I2, I3, H3 & H4 Standard Design Plan26 Jun 2025H2 Floor Plans, Elevation & Section26 Jun 2025

Floor plans

1 file
Unit Allocation26 Jun 2025

Services

Sewerage and drainage

2 files
Assurance for Storm Water27 Feb 2025Assuance for Sewerage Connection27 Feb 2025

Water supply

1 file
Water Supply Assurance27 Feb 2025

Electricity

1 file
Electrical Load Availability27 Feb 2025

Service plans

1 file
Service Plans on the Layout6 Jan 2025

Approvals and clearances

DTCP licence

3 files
LOI27 Feb 2025LC-IV27 Feb 2025Licence Copy with Land Schedule27 Feb 2025

Other NOCs and clearances

2 files
Forest NOC27 Feb 2025Road Permission27 Feb 2025

Land records

Land records

6 files
Mutation26 Jun 2025Non Encumberance Certificate26 Jun 2025Aks Shizra26 Jun 2025

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures26 Jun 2025Non-Default Certificate from a CA26 Jun 2025Cash Flow Statement26 Jun 2025

The promoter’s papers

Declarations and affidavits

4 files
The Promoter’s Declaration on Affidavit26 Jun 2025Affidavit 4(2)(L)(D)24 Apr 2025NCZ Undertaking24 Apr 2025Bank Undertaking17 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

100 OF 2024 · Betterchoice Realtors Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 23 Jul 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 24 Apr 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

100 OF 2024: 12 parcels, 5.5583 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 5.5583 acres.

  • 58//11/1/24 kanal 17 marla
  • 58//12/2 min17 marla 7 sarsai
  • rectangle 58, kila 11/2 min2 kanal 2 sarsai
  • rectangle 58, kila 12/1 min6 kanal 4 marla 4 sarsai
Show the other 8 parcels
  • rectangle 58, kila 13/1/1 min2 kanal 16 marla 4 sarsai
  • rectangle 58, kila 13/2/1 min1 marla 1 sarsai
  • 57//58 kanal
  • 57//68 kanal
  • rectangle 57, kila 7/1/1 min1 kanal 10 marla 2 sarsai
  • rectangle 57, kila 14/2/2 min8 marla 7 sarsai
  • rectangle 57, kila 15 min7 kanal 2 marla 2 sarsai
  • rectangle 57, kila 4/2 min2 kanal 11 marla 1 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 58//11/1/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan26 Jun 2025

Layout plan

3 files
Approved Phasing Plan26 Jun 2025Latest Layout Plan26 Jun 2025Approval of Phasing Plan27 Feb 2025

Building plans

14 files
E2 to E7 Floor Plans, Elevation & Section26 Jun 2025I2, I3, H3 & H4 Standard Design Plan26 Jun 2025H2 Floor Plans, Elevation & Section26 Jun 2025I1 Floor Plans, Elevation & Section26 Jun 2025J1 & J16 Floor Plans, Elevation & Section26 Jun 2025J12 & J13 Floor Plans, Elevation & Section26 Jun 2025

Floor plans

1 file
Unit Allocation26 Jun 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (44 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3281 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Betterchoice Realtors

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.