Skip to content

FLORA AVENUE 88A

by Gcc Infra · Sector 88A, Gurugram

Not on our price list yet

Possession 31 Mar 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
Timeline
  1. 6 Jan 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Mar 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside44,072 m² in all, by use
  • Plots for sale23,818 m² · 54%
  • Roads9,934 m² · 23%
  • Land for community services, handed to the government4,300 m² · 10%
  • Parks and playgrounds3,225 m² · 7%
  • Shops and offices1,720 m² · 4%
  • Electricity sub-station537 m² · 1%
  • Sewage and waste treatment537 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88A, GurugramSector 88A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS4.5 km
  • Sohna Elevated Corridor (NH-248A)7.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is FLORA AVENUE 88A registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/674/406/2023/18. The register’s record shows an end date of 30 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for FLORA AVENUE 88A?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Mar 2025. Its registration runs to 30 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around FLORA AVENUE 88A?From the records · Map pin and road lines, read 6 Sep 2026

FLORA AVENUE 88A is in Sector 88A, Gurugram; the site address declared to HARERA is Sector-88a, Village-Harsaru, Gurugram Manesar Urban Complex, Gurugram, Haryana-122505. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building FLORA AVENUE 88A?From the records · HARERA, read 4 Nov 2026

FLORA AVENUE 88A is a Gcc Infra project.

The source ↗Gcc Infra's projects and court record

The records

What the registers hold for FLORA AVENUE 88A: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/674/406/2023/18: Registration lapsed. The register’s record shows an end date of 30 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 05 OF 2023 is on the DTCP register, valid to 5 Jan 2028.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 6 Jan 2023, building plans 6 Jan 2023.Declared to HARERA, read 29 Oct 2026
The court record of Gcc Infra’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 37 HARERA files, with the dates we read them
Registration no.
GGM/674/406/2023/18
Registration valid till
30 Dec 2025
Declared possession
31 Mar 2025

Declared by the promoter to HARERA

Land area
10.625 (Acre) (42,997.85 sq m)
FAR
0 proposed of 0 permissible
licence
5 of 2023 Dated 06/01/2023 in addition to 126 of 2022 Dated 17/08/2022
Estimated project cost
₹118.66 crore
Cost of land
₹88.51 crore
Layout plan, declared approved (field 5a)
6 Jan 2023
Building plans, declared approved
6 Jan 2023
Construction to start
1 Mar 2023
Completion declared for
31 Mar 2025
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE 7.375 ACRES — declared: already been obtained (17 Aug 2022)
  • II. ADDITIONAL LICENSE 3.25 ACRES — declared: already been obtained (6 Jan 2023)
  • III. LAYOUT — declared: already been obtained (6 Jan 2023)
On file with HARERA · 37 files

On file with HARERA (37)

Plans

Site plan

5 files
Site Plan & Layout Plan for Storm14 Jun 2023Site Plan & Layout Plan for Road14 Jun 2023Site Plan & Layout Plan for Sewerage14 Jun 2023

Layout plan

1 file
Latest Layout Plan14 Jun 2023

Zoning plan

1 file
Zoning Plan14 Jun 2023

Demarcation plan

1 file
Demarcation Plan14 Jun 2023

Building plans

1 file
Approved Building Plans, Full Set11 Jan 2023

Services

Sewerage and drainage

3 files
Assurance for Storm Water14 Jun 2023Assurance for Supply of 135 Kld STP14 Jun 2023Assurance of Sewerage14 Jun 2023

Water supply

1 file
Assurance of Water Demand of 550 Kld14 Jun 2023

Electricity

1 file
Assurance of Power Supply14 Jun 2023

Service plans

2 files
Service Estimates14 Jun 2023Service Plans on the Layout11 Jan 2023

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule14 Jun 2023Additional License14 Jun 2023LOI11 Jan 2023

Other NOCs and clearances

4 files
Forest NOC 114 Jun 2023Aravli NOC14 Jun 2023Haryana State Pollution Control Board-Grant of Consent14 Jun 2023Forest NOC 214 Jun 2023

Land records

Land records

4 files
Non Encumbrance Certificate11 Jan 2023Sale Deed11 Jan 2023Revenue Record Entry of Licence and Collaboration11 Jan 2023Non Encumbrance Certificate11 Jan 2023

Money

Accounts and finance

5 files
Approval of Change of Bank Account2 Sept 2025CA Certificate on the Application’s Figures14 Jun 2023Cash Flow Statement14 Jun 2023

The promoter’s papers

Declarations and affidavits

3 files
The Promoter’s Declaration on Affidavit14 Jun 2023Affidavit14 Jun 2023RERA Bank Undertaking Flora Avenue14 Jun 2023

HARERA’s orders

HARERA’s orders

1 file
Extension No. 12 of 2025 dated 18.03.202520 Mar 2025

Other filings

Other filings

1 file
Ndc Gcc Flora Avenue14 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

05 OF 2023 · GCC INFRA · GURGAON-MANESAR

Licence valid to 5 Jan 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

126 OF 2022 · GCC INFRA · GURGAON-MANESAR

Licence valid to 16 Aug 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jan 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

05 OF 2023: 7 parcels, 3.25 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 3.25 acres.

  • 55//138 kanal
  • 55//14/19 marla
  • 55//14/31 kanal 9 marla
  • 55//15/15 marla
Show the other 3 parcels
  • 55//188 kanal
  • 55//19/112 marla
  • 55//23/37 kanal 5 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

126 OF 2022: 13 parcels, 7.375 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 7.375 acres.

  • 55//10/16 kanal 12 marla
  • 55//11/25 kanal 14 marla
  • 55//128 kanal
  • 55//20/14 kanal 8 marla
Show the other 9 parcels
  • 55//55 kanal 3 marla
  • 55//65 kanal 3 marla
  • 55//8/13 kanal 12 marla
  • 55//8/2/12 kanal 4 marla
  • 55//9/14 kanal
  • 55//9/24 kanal
  • 55//7/13 kanal 19 marla
  • 55//7/24 kanal 1 marla
  • 55//8/2/22 kanal 4 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 55//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

5 files
Site Plan & Layout Plan for Storm14 Jun 2023Site Plan & Layout Plan for Road14 Jun 2023Site Plan & Layout Plan for Sewerage14 Jun 2023Site Plan & Layout Plan for Water Supply14 Jun 2023Approved Site Plan11 Jan 2023

Layout plan

1 file
Latest Layout Plan14 Jun 2023

Building plans

1 file
Approved Building Plans, Full Set11 Jan 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (37 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2299 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Gcc Infra

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.