Timeline
  1. 30 May 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Jul 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 29 Jul 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.404 acres in all, by use
  • Parking2.206 acres · 65%
  • Plots for sale1.198 acres · 35%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88A, GurugramSector 88A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS4.5 km
  • Sohna Elevated Corridor (NH-248A)7.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 5 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SIGNATURE GLOBAL SCOII 88A registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/611/343/2022/86. Ended 29 Jul 2025. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL SCOII 88A?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jul 2023. Its registration runs to 29 Jul 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL SCOII 88A?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL SCOII 88A is in Sector 88A, Gurugram; the site address declared to HARERA is Village-Harsaru, Sector-88a, Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL SCOII 88A?From the records · HARERA, read 4 Nov 2026

SIGNATURE GLOBAL SCOII 88A is a JMK Holdings project, registered by its company JMK HOLDINGS PVT. LTD..

The source ↗JMK Holdings's projects and court record

The records

What the registers hold for SIGNATURE GLOBAL SCOII 88A: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/611/343/2022/86: Registration expired. Ended 29 Jul 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 69 OF 2022 is on the DTCP register, valid to 26 May 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 30 May 2022.Declared to HARERA, read 29 Oct 2026
The court record of JMK Holdings’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 29 Jul 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
GGM/611/343/2022/86
Registration valid till
29 Jul 2025
Declared possession
31 Jul 2023

Declared by the promoter to HARERA

Land area
3.428 (Acre) (13,872.62 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
69 of 2022
Estimated project cost
₹98.18 crore
Cost of land
₹42.10 crore
Layout plan, declared approved (field 5a)
30 May 2022
Construction to start
1 Sept 2022
Completion declared for
31 Jul 2023
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (13 Oct 2021)
  • II. WATER ASSURANCE — declared: already been obtained (5 Jul 2022)
  • III. POWER ASSURANCE — declared: already been obtained (6 Jun 2022)
  • IV. NOC FOR ARAVALI PROJECT PLANTATION 1992 — declared: already been obtained (21 Dec 2021)
  • V. LICENSE NO. 69-2022 — declared: already been obtained (27 May 2022)
  • VI. LAYOUT PLAN — declared: already been obtained (30 May 2022)
  • VII. ARCHITECTURE CONTROL SHEET — declared: already been obtained (25 Aug 2022)
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

1 file
Approved Site Plan4 Aug 2022

Layout plan

2 files
Layout Plan26 Sept 2022Latest Layout Plan4 Aug 2022

Zoning plan

1 file
Zoning Plan4 Aug 2022

Demarcation plan

2 files
Demarcation Plan26 Sept 2022Demarcation Plan4 Aug 2022

Building plans

2 files
Architectural Control Sheet26 Sept 2022Approved Building Plans, Full Set4 Aug 2022

Services

Sewerage and drainage

1 file
Strom Water Plan26 Sept 2022

Water supply

2 files
Water Assurance26 Sept 2022Water Supply Plan26 Sept 2022

Electricity

2 files
Electrical Plan26 Sept 2022Power Assurance26 Sept 2022

Landscape and green areas

1 file
Landscape Plan26 Sept 2022

Service plans

2 files
Service Estimates Application Letter26 Sept 2022Service Plans on the Layout4 Aug 2022

Approvals and clearances

Completion certificate (CC)

1 file
Completion Certificate Uploaded20 Jul 2026

DTCP licence

4 files
LC-IV26 Sept 2022License26 Sept 2022LOI26 Sept 2022Licence Copy with Land Schedule4 Aug 2022

Other NOCs and clearances

1 file
Forest NOC26 Sept 2022

Land records

Land records

8 files
Mutation26 Sept 2022Jamabandi Copy26 Sept 2022Aks-Shajra26 Sept 2022

Sales papers

Allotment and sale agreements

3 files
Allotment Letter 88A II26 Sept 2022BBA26 Sept 2022Conveyence Deed26 Sept 2022

Brochure and specifications

1 file
Brochure Document26 Sept 2022

Money

Accounts and finance

5 files
CA Certificate for Land Cost and REP126 Sept 2022CA Certificate for Non-Default in Payment26 Sept 2022Cash Flow Statement4 Aug 2022

Timeline and progress

Construction schedule

1 file
PERT Chart26 Sept 2022

The promoter’s papers

Declarations and affidavits

4 files
Bank Undertaking26 Sept 2022Repii26 Sept 2022Undertaking for Power Siffting, Tree Cutting, Natural Can26 Sept 2022The Promoter’s Declaration on Affidavit5 Aug 2022

Company papers

2 files
GST Certificate26 Sept 2022MOA and AOA26 Sept 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 22 of 2023 dated 07.08.20235 Sept 2023

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/86 of 2022/7(3)/58/2024/17 Dated 19.12.202420 Feb 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

69 OF 2022 · JMK HOLDINGS PVT. LTD. · GURGAON-MANESAR

Licence valid to 26 May 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 5 Aug 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

69 OF 2022: 6 parcels, 3.425 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 3.428 acres.

  • 87//132 marla
  • 87//148 kanal
  • 87//158 kanal
  • 87//168 kanal
Show the other 2 parcels
  • 87//181 kanal 7 marla
  • 87//23/11 kanal 19 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 87//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan4 Aug 2022

Layout plan

2 files
Layout Plan26 Sept 2022Latest Layout Plan4 Aug 2022

Building plans

2 files
Architectural Control Sheet26 Sept 2022Approved Building Plans, Full Set4 Aug 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2061 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on JMK Holdings

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.