Possession 30 Nov 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88A, Gurugram0.7 km from Dwarka Expressway, in a straight line
Timeline
  1. 28 Sep 2022Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Nov 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 30 Nov 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10.019 acres in all, by use
  • Plots for sale5.09 acres · 51%
  • Pavements2.586 acres · 26%
  • Land for community services, handed to the government1.004 acres · 10%
  • Parks and playgrounds0.716 acres · 7%
  • Other uses0.6 acres · 6%
  • Electricity sub-station0.022 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88A, GurugramSector 88A, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS4.5 km
  • Sohna Elevated Corridor (NH-248A)7.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is INDIA RASHTRA registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/631/363/2022/106. Valid to 30 Nov 2026.

The source ↗
What is the possession timeline for INDIA RASHTRA?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Nov 2026. Its registration runs to 30 Nov 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around INDIA RASHTRA?From the records · Map pin and road lines, read 6 Sep 2026

INDIA RASHTRA is in Sector 88A, Gurugram; the site address declared to HARERA is Sector 88a. In a straight line it is about 0.7 km from Dwarka Expressway, 4.5 km from Delhi–Gurugram–SNB RRTS and 7.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building INDIA RASHTRA?From the records · HARERA, read 4 Nov 2026

INDIA RASHTRA is a Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) project, registered by its company NEXT GENERATION PROJECTS PVT LTD.

The source ↗Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd)'s projects and court record

The records

What the registers hold for INDIA RASHTRA: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/631/363/2022/106: Registered. Valid to 30 Nov 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 144 OF 2022 is on the DTCP register, valid to 26 Sep 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Sep 2022, building plans 30 Nov 2026.Declared to HARERA, read 29 Oct 2026
The court record of Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd)’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 30 Nov 2026. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 20 HARERA files, with the dates we read them
Registration no.
GGM/631/363/2022/106
Registration valid till
30 Nov 2026
Declared possession
30 Nov 2026

Declared by the promoter to HARERA

Land area
10.01875 (Acre) (40,544.44 sq m)
FAR
1 proposed of 1 permissible
licence
LICENSE NO 144 OF 2022 DATED 28-09-2022
Estimated project cost
₹322.86 crore
Cost of land
₹191.51 crore
Layout plan, declared approved (field 5a)
28 Sept 2022
Building plans, declared approved
30 Nov 2026 (a date after the page was read, as typed)
Construction to start
1 Oct 2022
Completion declared for
30 Nov 2026
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE NO 144 OF 2022 DATED 28-09-2022 — declared: already been obtained (27 Sept 2022)
On file with HARERA · 20 files

On file with HARERA (20)

Plans

Site plan

1 file
Approved Site Plan28 Sept 2022

Layout plan

2 files
Demarcation Layout29 Nov 2022Latest Layout Plan28 Sept 2022

Zoning plan

1 file
Zoning Plan28 Sept 2022

Demarcation plan

1 file
Demarcation Plan28 Sept 2022

Building plans

1 file
Approved Building Plans, Full Set28 Sept 2022

Services

Service plans

2 files
Service Estimate29 Nov 2022Service Plans on the Layout28 Sept 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule28 Sept 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration26 Jun 2023

Money

Accounts and finance

6 files
Cash Flow Statement26 Jun 2023Project Report29 Nov 2022Service Estimates Applied Receipts29 Nov 2022

Timeline and progress

Construction schedule

1 file
PERT Chart29 Nov 2022

The promoter’s papers

Declarations and affidavits

2 files
Rep II29 Nov 2022The Promoter’s Declaration on Affidavit28 Sept 2022

Other filings

Other filings

1 file
Next Gen BR20 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

144 OF 2022 · Devasya Developers Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 26 Sept 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Sept 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

144 OF 2022: 31 parcels, 10.0187 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 10.0188 acres.

  • 56//10/2/15 marla
  • 56//10/2/34 kanal 14 marla
  • 56//118 kanal
  • 56//128 kanal
Show the other 27 parcels
  • 56//13/13 kanal
  • 56//13/25 kanal
  • 56//14/13 kanal 18 marla
  • 56//14/24 kanal 2 marla
  • 56//15/13 kanal 14 marla
  • 56//15/24 kanal 6 marla
  • 56//6/1/13 marla
  • 56//6/1/34 kanal 13 marla
  • 56//6/2/11 marla
  • 56//6/2/32 kanal 5 marla
  • 56//7/1/12 marla
  • 56//7/1/33 kanal 12 marla
  • 56//7/2/12 marla
  • 56//7/2/33 kanal 5 marla
  • 56//8/1/13 marla
  • 56//8/1/34 kanal 6 marla
  • 56//8/2/14 marla
  • 56//8/2/32 kanal 2 marla
  • 56//9/2/14 marla
  • 56//9/2/33 kanal 7 marla
  • 57//10/2/2/11 kanal 17 marla 5 sarsai
  • 57//10/2/2/213 marla 5 sarsai
  • 57//115 kanal 14 marla 1 sarsai
  • 57//12/113 marla 8 sarsai
  • 57//12/219 marla 4 sarsai
  • 57//9/1/112 marla 1 sarsai
  • 57//9/1/24 marla 3 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 56//10/2/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan28 Sept 2022

Layout plan

2 files
Demarcation Layout29 Nov 2022Latest Layout Plan28 Sept 2022

Building plans

1 file
Approved Building Plans, Full Set28 Sept 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (20 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2142 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd)

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.