IVORY ARCHES
by Zakspaces & Interiors · Sector 88B, Gurugram
Not on our price list yet
Possession 30 Sep 2029 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 88B, Gurugram0.6 km from Dwarka Expressway, in a straight line
- Registered by
- ZAKSPACES & INTERIORS PRIVATE LIMITEDthe company that filed it, for Zakspaces & Interiors
- 7 May 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Sep 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,028–1,310 sq ft8
- 1,500–2,000 sq ft1,508 sq ft4
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings0.138 acres · 100%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- KitchenTiles I OBD I equivalent
- Lifts1 lift / 2 plots
- WardrobesPlywood based finished with laminates both inside and outside
- FloorsIPS flooring / tiles / marble / granite
- WallsOBD/ equivalent
- BathroomsStandard sanitary & CP fittings
- WindowsAluminium
- Main doorLaminated/painted flush door with all hardware
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.6 km
- Delhi–Gurugram–SNB RRTS5.0 km
- Sohna Elevated Corridor (NH-248A)7.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Vatika Group | Same sector | — | — | 30 Jun 2024 | |
SKY PALAZZOSNo photo on file yet | Fidatocity Homes | Same sector | — | — | 31 Dec 2032 |
MAHIRA HOMES 88BNo photo on file yet | Mahira Homes | Same sector | — | — | 31 Dec 2026 |
COCOA COUNTY PHASE 02No photo on file yet | Ashiana Landcraft Realty | 0.9 kmto its sector’s point | — | — | 31 Dec 2032 |
No photo of the project on file yet | Gcc Infra | 0.9 kmto its sector’s point | — | — | 31 Mar 2025 |
INDIA RASHTRANo photo on file yet | Devasya Developers Pvt. Ltd (Formerly Known As Next Generation Projects Pvt Ltd) | 0.9 kmto its sector’s point | — | — | 30 Nov 2026 |
| Signatureglobal (India) | 0.9 kmto its sector’s point | — | — | 28 Mar 2026 | |
No photo of the project on file yet | Nani Resorts and Floriculture | 0.9 kmto its sector’s point | — | — | 30 Dec 2028 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is IVORY ARCHES registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/1005/737/2025/108. Valid to 30 Sep 2029.
The source ↗What is the possession timeline for IVORY ARCHES?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Sep 2029. Its registration runs to 30 Sep 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around IVORY ARCHES?From the records · Map pin and road lines, read 6 Sep 2026
IVORY ARCHES is in Sector 88B, Gurugram; the site address declared to HARERA is Vatika India Next-Ii, Sector 88b. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building IVORY ARCHES?From the records · HARERA, read 4 Nov 2026
IVORY ARCHES is a Zakspaces & Interiors project, registered by its company ZAKSPACES & INTERIORS PRIVATE LIMITED.
The source ↗Zakspaces & Interiors's projects and court recordThe records
What the registers hold for IVORY ARCHES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/1005/737/2025/108: Registered. Valid to 30 Sep 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 7 May 2025.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
- Registration no.
- GGM/1005/737/2025/108
- Registration valid till
- 30 Sept 2029
- Declared possession
- 30 Sept 2029
Declared by the promoter to HARERA
- Land area
- 0.1384 (Acre) (560.08 sq m)
- FAR
- 2.64 proposed of 2.64 permissible
- licence
- Third Party Right Holder (Landowner- Conveyance Deed Holder )
- Estimated project cost
- ₹17.49 crore
- Cost of land
- ₹4.97 crore
- Building plans, declared approved
- 7 May 2025
- Construction to start
- 1 Aug 2025
- Completion declared for
- 30 Sept 2029
Declared inventory · 3 types
Declared inventory
- Apartment/Shops/Other Buildings · 4 units · 121.72 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 95.55 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 4 units · 140.14 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (17 Nov 2023)
- II. BUILDING PLAN APPROVAL (E-31/24) — declared: already been obtained (24 Apr 2025)
- III. BUILDING PLAN APPROVAL (H-40/22) — declared: already been obtained (16 Apr 2025)
- IV. BUILDING PLAN APPROVAL (J-12/24) — declared: already been obtained (14 Apr 2025)
- V. ZONING PLAN — declared: already been obtained (12 Jun 2025)
- VI. LAYOUT PLAN (E-31/24) — declared: already been obtained (24 Apr 2025)
- VII. LAYOUT PLAN (H-40/22) — declared: already been obtained (16 Apr 2025)
- VIII. LAYOUT PLAN (J-12/24) — declared: already been obtained (14 Apr 2025)
On file with HARERA · 39 files
On file with HARERA (39)
Plans
Site plan
2 filesLayout plan
1 fileDemarcation plan
2 filesBuilding plans
5 filesFloor plans
2 filesServices
Sewerage and drainage
3 filesWater supply
1 fileRoads
1 fileService plans
1 fileApprovals and clearances
DTCP licence
3 filesLand records
Land records
2 filesSales papers
Allotment and sale agreements
3 filesMoney
Accounts and finance
7 filesTimeline and progress
Construction schedule
1 fileThe promoter’s papers
Declarations and affidavits
4 filesCompany papers
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Third Party Right Holder (Landowner- Conveyance Deed Holder ). We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jul 2025 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
5 filesFloor plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (39 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3552 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Zakspaces & Interiors
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

