Skip to content

IVORY ARCHES

by Zakspaces & Interiors · Sector 88B, Gurugram

Not on our price list yet

Possession 30 Sep 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88B, Gurugram0.6 km from Dwarka Expressway, in a straight line
Carpet area
1,028–1,508 sq ft
In m²about 96–140 m², as declared
Registered by
ZAKSPACES & INTERIORS PRIVATE LIMITEDthe company that filed it, for Zakspaces & Interiors
Timeline
  1. 7 May 2025Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

12homes, 1,028 to 1,508 sq ft of carpet area
  • 1,000–1,500 sq ft1,028–1,310 sq ft8
  • 1,500–2,000 sq ft1,508 sq ft4

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside0.138 acres in all, by use
  • Apartment buildings0.138 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenTiles I OBD I equivalent
  • Lifts1 lift / 2 plots
  • WardrobesPlywood based finished with laminates both inside and outside
  • FloorsIPS flooring / tiles / marble / granite
  • WallsOBD/ equivalent
  • BathroomsStandard sanitary & CP fittings
  • WindowsAluminium
  • Main doorLaminated/painted flush door with all hardware

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88B, GurugramSector 88B, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is IVORY ARCHES registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1005/737/2025/108. Valid to 30 Sep 2029.

The source ↗
What is the possession timeline for IVORY ARCHES?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2029. Its registration runs to 30 Sep 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around IVORY ARCHES?From the records · Map pin and road lines, read 6 Sep 2026

IVORY ARCHES is in Sector 88B, Gurugram; the site address declared to HARERA is Vatika India Next-Ii, Sector 88b. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building IVORY ARCHES?From the records · HARERA, read 4 Nov 2026

IVORY ARCHES is a Zakspaces & Interiors project, registered by its company ZAKSPACES & INTERIORS PRIVATE LIMITED.

The source ↗Zakspaces & Interiors's projects and court record

The records

What the registers hold for IVORY ARCHES: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1005/737/2025/108: Registered. Valid to 30 Sep 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: building plans 7 May 2025.Declared to HARERA, read 29 Oct 2026
The court record of Zakspaces & Interiors’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 39 HARERA files, with the dates we read them
Registration no.
GGM/1005/737/2025/108
Registration valid till
30 Sept 2029
Declared possession
30 Sept 2029

Declared by the promoter to HARERA

Land area
0.1384 (Acre) (560.08 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
Third Party Right Holder (Landowner- Conveyance Deed Holder )
Estimated project cost
₹17.49 crore
Cost of land
₹4.97 crore
Building plans, declared approved
7 May 2025
Construction to start
1 Aug 2025
Completion declared for
30 Sept 2029
Declared inventory · 3 types

Declared inventory

  • Apartment/Shops/Other Buildings · 4 units · 121.72 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 95.55 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 140.14 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (17 Nov 2023)
  • II. BUILDING PLAN APPROVAL (E-31/24) — declared: already been obtained (24 Apr 2025)
  • III. BUILDING PLAN APPROVAL (H-40/22) — declared: already been obtained (16 Apr 2025)
  • IV. BUILDING PLAN APPROVAL (J-12/24) — declared: already been obtained (14 Apr 2025)
  • V. ZONING PLAN — declared: already been obtained (12 Jun 2025)
  • VI. LAYOUT PLAN (E-31/24) — declared: already been obtained (24 Apr 2025)
  • VII. LAYOUT PLAN (H-40/22) — declared: already been obtained (16 Apr 2025)
  • VIII. LAYOUT PLAN (J-12/24) — declared: already been obtained (14 Apr 2025)
On file with HARERA · 39 files

On file with HARERA (39)

Plans

Site plan

2 files
Site Plan31 Dec 2025Approved Site Plan10 Jul 2025

Layout plan

1 file
Latest Layout Plan10 Jul 2025

Demarcation plan

2 files
Demarcation Plan Approval31 Dec 2025Superimposed Demarcation Plan31 Dec 2025

Building plans

5 files
Building Plan Approval31 Dec 2025Elevation31 Dec 2025Section31 Dec 2025

Floor plans

2 files
Apartment Plan31 Dec 2025Floor Plan31 Dec 2025

Services

Sewerage and drainage

3 files
Sewerage Plan31 Dec 2025Storm Water Drainage31 Dec 2025Construction Water Used from STP31 Dec 2025

Water supply

1 file
Water Supply Plan31 Dec 2025

Roads

1 file
Road Plan31 Dec 2025

Service plans

1 file
Service Plans on the Layout31 Dec 2025

Approvals and clearances

DTCP licence

3 files
Zoning Plan Approval - License31 Dec 2025LOI31 Dec 2025Licence Copy with Land Schedule10 Jul 2025

Land records

Land records

2 files
Sale Deed31 Dec 2025Revenue Record Entry of Licence and Collaboration10 Jul 2025

Sales papers

Allotment and sale agreements

3 files
Draft Allotment Letter31 Dec 2025Draft BBA31 Dec 2025Draft Conveyance Deed31 Dec 2025

Money

Accounts and finance

7 files
CA Certificate Exp. & Inventory31 Dec 2025Cash Flow Statement31 Dec 2025CA Certificate on the Application’s Figures31 Dec 2025

Timeline and progress

Construction schedule

1 file
PERT Chart31 Dec 2025

The promoter’s papers

Declarations and affidavits

4 files
Bank Undertaking31 Dec 2025The Promoter’s Declaration on Affidavit31 Dec 2025Draft Application Form31 Dec 2025Affidavit 4(2)(L)(D)31 Dec 2025

Company papers

1 file
Board Resolution31 Dec 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Third Party Right Holder (Landowner- Conveyance Deed Holder ). We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 11 Jul 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan31 Dec 2025Approved Site Plan10 Jul 2025

Layout plan

1 file
Latest Layout Plan10 Jul 2025

Building plans

5 files
Building Plan Approval31 Dec 2025Elevation31 Dec 2025Section31 Dec 2025Structural31 Dec 2025Approved Building Plans, Full Set10 Jul 2025

Floor plans

2 files
Apartment Plan31 Dec 2025Floor Plan31 Dec 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (39 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3552 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Zakspaces & Interiors

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.