MAHIRA HOMES 88B

by Mahira Homes · Sector 88B, Gurugram

Not on our price list yet

Possession 31 Dec 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 88B, Gurugram0.6 km from Dwarka Expressway, in a straight line
Carpet area
about 613 sq ft
In m²about 57 m², the average flat, as declared
Registered by
MAHIRA HOMES PVT LTDthe company that filed it, for Mahira Homes
Timeline
  1. 10 May 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside6.675 acres in all, by use
  • Parking2.619 acres · 39%
  • Apartment buildings2.149 acres · 32%
  • Roads1.306 acres · 20%
  • Parks and playgrounds0.294 acres · 4%
  • Other usesas the form names them: Area under commercial units, School and other related community0.17 acres · 3%
  • Electricity sub-station0.089 acres · 1%
  • Club house0.048 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenVitrified tile/ceramic tile, oil BOND distemper
  • Kitchen appliancesISI MARK standard fittings
  • Lifts2 NOS lift per tower
  • WardrobesColour WASH
  • FloorsVitrified tile/ ceramic tile/ IPS flooring
  • WallsOil BOND distemper / color WASH
  • BathroomsC.P. fitting
  • WindowsAluminium / MS Z section

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 88B, GurugramSector 88B, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.6 km
  • Delhi–Gurugram–SNB RRTS5.0 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is MAHIRA HOMES 88B registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/707/439/2023/51 (IN ABEYANCE). Valid to 31 Dec 2026.

The source ↗
What is the possession timeline for MAHIRA HOMES 88B?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2026. Its registration runs to 31 Dec 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around MAHIRA HOMES 88B?From the records · Map pin and road lines, read 6 Sep 2026

MAHIRA HOMES 88B is in Sector 88B, Gurugram; the site address declared to HARERA is Village- Harsaru , Sector - 88b. In a straight line it is about 0.6 km from Dwarka Expressway, 5.0 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building MAHIRA HOMES 88B?From the records · HARERA, read 3 Nov 2026

MAHIRA HOMES 88B is a Mahira Homes project, registered by its company MAHIRA HOMES PVT LTD.

The source ↗Mahira Homes's projects and court record

The records

What the registers hold for MAHIRA HOMES 88B: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/707/439/2023/51 (IN ABEYANCE): Registered. Valid to 31 Dec 2026.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 9 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 30 Jan 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 10 May 2022, building plans 10 May 2022.Declared to HARERA, read 29 Oct 2026
The court record of Mahira Homes’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration ends soon

    Valid to 31 Dec 2026. HARERA Gurugram, read 3 Nov 2026. Source

  • Amber flag: Licence 9 OF 2022 ends soon

    Named in this project’s application. Valid to 30 Jan 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 44 HARERA files, with the dates we read them
Registration no.
GGM/707/439/2023/51 (IN ABEYANCE)
Registration valid till
31 Dec 2026
Declared possession
31 Dec 2026

Declared by the promoter to HARERA

Land area
6.675 (Acre) (27,012.77 sq m)
FAR
the application prints 15.18, which is not a ratio
licence
License No. 9 of 2022 dated 31.01.2022
Estimated project cost
₹251.41 crore
Cost of land
₹53.48 crore
Layout plan, declared approved (field 5a)
10 May 2022
Building plans, declared approved
10 May 2022
Construction to start
15 May 2022
Completion declared for
31 Dec 2026
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 864 units · 51,729.278 sq m carpet · 6 towers · total for 864 flats, about 59.9 m² each
  • Apartment/Shops/Other Buildings · 98 units · 3,057.676 sq m carpet · 1 tower · total for 98 flats, about 31.2 m² each
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (31 Jan 2022)
  • II. LOI — declared: already been obtained (18 Nov 2021)
  • III. CHANGE OF DEVELOPER (COD) — declared: applied for but yet to receive (23 Feb 2022)
On file with HARERA · 44 files

On file with HARERA (44)

Plans

Site plan

3 files
Site Plan 222 Mar 2023Site Plan(podium Lvl)22 Mar 2023Approved Site Plan22 Mar 2023

Layout plan

1 file
Latest Layout Plan13 Feb 2022

Zoning plan

1 file
Zoning Plan22 Mar 2023

Demarcation plan

2 files
Superimposed Demarcation Over Site22 Mar 2023Demarcation Plan13 Feb 2022

Building plans

11 files
Community and Aanganwadi-Elevations and Sections22 Mar 2023Elevations 122 Mar 2023Elevations 222 Mar 2023

Floor plans

9 files
Commercial Floor Plans22 Mar 2023Parking Plan22 Mar 2023Tower A1-Floor Plans22 Mar 2023

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule13 Feb 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration13 Feb 2022

Money

Accounts and finance

11 files
CA Certificate -Land Value-Feb 2322 Mar 2023CA Certificate -No Default Certificate -FEB2322 Mar 2023CA Certificate-Expenditure-Feb 2322 Mar 2023

The promoter’s papers

Declarations and affidavits

3 files
Fire Scheme Undertaking22 Mar 2023Bank Undertaking22 Mar 2023The Promoter’s Declaration on Affidavit13 Feb 2022

Other filings

Other filings

1 file
Community and Aanganwadi Plans22 Mar 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

9 OF 2022 · Vatika Ltd. · GURGAON-MANESAR

Licence valid to 30 Jan 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Feb 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

9 OF 2022: 12 parcels, 6.675 acres in all, in Harsuru (hadbast 107), tehsil Harsaru.

The licence register prints the same licensed area, 6.675 acres.

  • 11//10/1/119 marla
  • 11//21 kanal 12 marla
  • 11//36 kanal 16 marla
  • 11//48 kanal
Show the other 8 parcels
  • 11//5/16 kanal 16 marla
  • 11//5/21 kanal 4 marla
  • 11//6/14 kanal 14 marla
  • 11//7/14 kanal 14 marla
  • 11//8/14 kanal 14 marla
  • 11//9/1/14 kanal 11 marla
  • rectangle 12, kila 1/15 kanal 17 marla
  • rectangle 12, kila 10/2min North3 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Harsuru (hadbast 107), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//10/1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Site Plan 222 Mar 2023Site Plan(podium Lvl)22 Mar 2023Approved Site Plan22 Mar 2023

Layout plan

1 file
Latest Layout Plan13 Feb 2022

Building plans

11 files
Community and Aanganwadi-Elevations and Sections22 Mar 2023Elevations 122 Mar 2023Elevations 222 Mar 2023Elevations 322 Mar 2023Elevations 422 Mar 2023Sections 122 Mar 2023

Floor plans

9 files
Commercial Floor Plans22 Mar 2023Parking Plan22 Mar 2023Tower A1-Floor Plans22 Mar 2023Tower A2-A6 Floor Plans22 Mar 2023Tower A-First Floor Plans22 Mar 2023Tower A-Typical Floor Plans22 Mar 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (44 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1866 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Mahira Homes

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.