JMD SUBURBIO-1
by JMD · Sector 67, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 67, Gurugram0.7 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Carpet area
- about 460 sq ft
In m²
about 42.7 m², the average flat, as declared
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking1.337 acres · 46%
- Apartment buildings1 acres · 34%
- Roads0.23 acres · 8%
- Parks and playgrounds0.23 acres · 8%
- Other uses0.115 acres · 4%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningNON AC building with provision of DX system cooling for shops. ALSO spilt AC in imperial suites
- KitchenGranite & tiles WORK
- Kitchen appliancesPhilips,LG make
- LiftsJohnson lifts SIX NOS with MAX. capacity 680 KGS
- WardrobesYes
- FloorsGranite & tiles WORK
- WallsGranite WORK, plastic paints
- BathroomsHIND WARE, jaguar,TOTO
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.7 km
- Delhi–Gurugram–SNB RRTS7.0 km
- Dwarka ExpresswayOpen, 17 Aug 20257.0 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Other register states: 2
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
The Corridors (Phase 1)No photo on file yet | Ireo Grace Realtech | Same sector | — | — | — |
The Corridors (Phase 3)No photo on file yet | Ireo Grace Realtech | Same sector | — | — | — |
No photo of the project on file yet | Landmark Apartments | Same sector | — | — | 31 May 2033 |
| DLF | Same sector | — | — | 31 Dec 2027 | |
M3M OPUS AT M3M MERLINNo photo on file yet | Consolidate Realtors | Same sector | — | — | 30 Apr 2030 |
SHREE VARDHMAN MANTRA (Q TOWER)No photo on file yet | Dss Infrastructure | Same sector | — | — | 31 Oct 2028 |
No photo of the project on file yet | 4S Developers | Same sector | — | — | 30 Sep 2021 |
No photo of the project on file yet | Landmark Apartments | Same sector | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is JMD SUBURBIO-1 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/555/287/2022/30. The register’s record shows an end date of 30 Dec 2024. The register shows it as: Registration lapsed.
The source ↗How is the connectivity around JMD SUBURBIO-1?From the records · Map pin and road lines, read 6 Sep 2026
JMD SUBURBIO-1 is in Sector 67, Gurugram; the site address declared to HARERA is Sector 67. In a straight line it is about 0.7 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building JMD SUBURBIO-1?From the records · HARERA, read 4 Nov 2026
JMD SUBURBIO-1 is a JMD project, registered by its company JMD LIMITED.
The source ↗JMD's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for JMD SUBURBIO-1: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/555/287/2022/30: Registration lapsed. The register’s record shows an end date of 30 Dec 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 291 OF 2007 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 30 Dec 2019.DTCP, read 3 Nov 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 30 Dec 2024. HARERA Gurugram, read 4 Nov 2026. Source
Amber flag: Licence 291 OF 2007 validity ended
Named in this project’s application. Valid to 30 Dec 2019. The register links a completion certificate (LC-IX), dated 16 Jan 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 33 HARERA files, with the dates we read them
- Registration no.
- GGM/555/287/2022/30
- Registration valid till
- 30 Dec 2024
Declared by the promoter to HARERA
- Land area
- 2.912007 (Acre) (11,784.47 sq m)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- 291 of 2007 dated 31/5/2007 by DTCP, Haryana
- Estimated project cost
- ₹139.16 crore
- Cost of land
- ₹39.10 crore
Declared inventory · 1 type
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type TOWER A,B,C · 519 units · 22,176.9 sq m carpet · total for 519 flats, about 42.7 m² each
Statutory approvals, as declared · 6
Statutory approvals, as declared
- I. ENVIRONMENT CLEARANCE — declared: already been obtained
- II. BR-III — declared: already been obtained
- III. ELECTRICAL SCHEME APPROVAL — declared: already been obtained
- IV. SERVICE PLAN AND ESIMATE — declared: already been obtained
- V. FIRE NOC — declared: already been obtained
- VI. OCCUPANCY CERTIFICATE — declared: already been obtained (18 Jul 2018)
On file with HARERA · 33 files
On file with HARERA (33)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
5 filesFloor plans
2 filesServices
Sewerage and drainage
1 fileWater supply
1 fileElectricity
3 filesRoads
1 fileLandscape and green areas
1 fileService plans
2 filesApprovals and clearances
DTCP licence
3 filesFire safety
1 fileOther NOCs and clearances
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileOther filings
Other filings
2 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
291 OF 2007 · Ansal Properties & Infrastructure · GURGAON-MANESAR
Licence valid to 30 Dec 2019
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Oct 2020 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
291 OF 2007
DTCP’s page showed no land schedule for licence 291 OF 2007 when Bhumiq read it on 18 Oct 2026. verify at source
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
5 filesFloor plans
2 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (33 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1469 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on JMD
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.