Skip to content

SHREE VARDHMAN MANTRA (Q TOWER)

by Dss Infrastructure · Sector 67, Gurugram

Not on our price list yet

Possession 31 Oct 2028 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 67, Gurugram0.7 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
526–532 sq ft
In m²about 49–49 m², as declared
Land
45575.620 (Sqr/mtrs)
Registered by
DSS INFRASTRUCTURE PRIVATE LIMITEDthe company that filed it, for Dss Infrastructure
Timeline
  1. 22 Aug 2023Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Oct 2028Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

123homes, 526 to 532 sq ft of carpet area
  • Under 1,000 sq ft526–532 sq ft123

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenMarble counter with 2 DADO
  • LiftsMarble flooring/ KOTA stone
  • FloorsCeramic tiles/ marble flooring
  • WallsOil BOND distemper
  • BathroomsISI marked
  • WindowsAluminium
  • Main doorFlush door
  • Electrical fittingsISI marked (standard)

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 67, GurugramSector 67, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.7 km
  • Delhi–Gurugram–SNB RRTS7.0 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SHREE VARDHMAN MANTRA (Q TOWER) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/763/495/2023/107. Valid to 31 Oct 2028.

The source ↗
What is the possession timeline for SHREE VARDHMAN MANTRA (Q TOWER)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2028. Its registration runs to 31 Oct 2028; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SHREE VARDHMAN MANTRA (Q TOWER)?From the records · Map pin and road lines, read 6 Sep 2026

SHREE VARDHMAN MANTRA (Q TOWER) is in Sector 67, Gurugram; the site address declared to HARERA is Shree Vardhman Mantra, Sector 67, Badshahpur, Gurugram. In a straight line it is about 0.7 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SHREE VARDHMAN MANTRA (Q TOWER)?From the records · HARERA, read 4 Nov 2026

SHREE VARDHMAN MANTRA (Q TOWER) is a Dss Infrastructure project, registered by its company DSS INFRASTRUCTURE PRIVATE LIMITED.

The source ↗Dss Infrastructure's projects and court record

The records

What the registers hold for SHREE VARDHMAN MANTRA (Q TOWER): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/763/495/2023/107: Registered. Valid to 31 Oct 2028.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 69 OF 2010 is on the DTCP register: Licence ends soon; the register prints its validity to 30 Apr 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 22 Aug 2023.Declared to HARERA, read 29 Oct 2026
The court record of Dss Infrastructure’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 69 OF 2010 ends soon

    Named in this project’s application. Valid to 30 Apr 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 42 HARERA files, with the dates we read them
Registration no.
GGM/763/495/2023/107
Registration valid till
31 Oct 2028
Declared possession
31 Oct 2028

Declared by the promoter to HARERA

Land area
45575.620 (Sqr/mtrs)
FAR
the application prints 175, which is not a ratio
licence
69 of 2010 dated 11 September, 2010
Estimated project cost
₹22.32 crore
Cost of land
₹2.25 crore
Building plans, declared approved
22 Aug 2023
Construction to start
1 Feb 2024
Completion declared for
31 Oct 2028
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 61 units · 49.398 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 62 units · 48.871 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. FORM BR-III (APPROVAL OF REVISED BUILDING PLAN) — declared: already been obtained (23 Aug 2023)
On file with HARERA · 42 files

On file with HARERA (42)

Plans

Site plan

1 file
Approved Site Plan16 Sept 2023

Layout plan

6 files
Superimposed Demarcation Plan on Layout Plan6 Jun 2024Revised Layout Q Tower6 Jun 2024Revised Layout Q Tower1 Dec 2023

Zoning plan

1 file
Zoning Plan6 Jun 2024

Demarcation plan

1 file
Demarcation Plan6 Jun 2024

Building plans

5 files
Elevation 26 Jun 2024Elevation6 Jun 2024Elevation1 Dec 2023

Floor plans

6 files
Floor Plan Q Block6 Jun 2024Basement Plan 26 Jun 2024Basement Plan6 Jun 2024

Services

Service plans

3 files
External Service Layout6 Jun 2024Service Plan Approval1 Dec 2023External Service Layout1 Dec 2023

Approvals and clearances

Occupation certificate (OC)

2 files
OC Granted6 Jun 2024OC Granted1 Dec 2023

DTCP licence

4 files
LC IV1 Dec 2023Renewal of Licence1 Dec 2023LOI1 Dec 2023Licence Copy with Land Schedule16 Sept 2023

Environment clearance

1 file
Environment Clearance1 Dec 2023

Other NOCs and clearances

1 file
Forest NOC1 Dec 2023

Land records

Land records

1 file
Non Encumbrance Cum Search Report1 Dec 2023

Sales papers

Allotment and sale agreements

2 files
Allotment Letter of Mantra1 Dec 2023RERA BBA - Dss1 Dec 2023

Money

Accounts and finance

2 files
Cash Flow Statement1 Dec 2023Non-Default Certificate from a CA16 Sept 2023

Timeline and progress

Construction schedule

2 files
PERT Chart-B1 Dec 2023PERT Chart-A1 Dec 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Jun 2024

Other filings

Other filings

3 files
Switching Station6 Jun 2024Area Chart Q Block6 Jun 2024Area Chart Q Block1 Dec 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

69 OF 2010 · DSS Infrastructure Pvt Ltd · GURGAON-MANESAR

Licence valid to 30 Apr 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 19 Sept 2023 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

69 OF 2010: 23 parcels, 11.2625 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 11.26 acres.

  • 103//16/11 kanal 12 marla
  • 103//16/22 kanal 8 marla
  • 103//16/32 kanal 8 marla
  • 103//16/41 kanal 12 marla
Show the other 19 parcels
  • 103//25/32 kanal 10 marla
  • 103//25/414 marla
  • 102//11/32 kanal 11 marla
  • 102//11/41 kanal 9 marla
  • 102//12/12 kanal 13 marla
  • 102//12/25 kanal 7 marla
  • 102//138 kanal
  • 102//188 kanal
  • 102//19/15 kanal 2 marla
  • 102//19/22 kanal 18 marla
  • 102//20/12 kanal 9 marla
  • 102//20/21 kanal 2 marla
  • 102//22/15 kanal 4 marla
  • 102//22/22 kanal 16 marla
  • 102//23/17 kanal 7 marla
  • 102//24/11 kanal 7 marla
  • 102//24/26 kanal 13 marla
  • 125//48 kanal
  • 125//58 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 103//16/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan16 Sept 2023

Layout plan

6 files
Superimposed Demarcation Plan on Layout Plan6 Jun 2024Revised Layout Q Tower6 Jun 2024Revised Layout Q Tower1 Dec 2023Superimposed Demarcation Plan on Layout Plan1 Dec 2023Revised Layout Q Tower1 Dec 2023Latest Layout Plan16 Sept 2023

Building plans

5 files
Elevation 26 Jun 2024Elevation6 Jun 2024Elevation1 Dec 2023Building Plan-BR III1 Dec 2023Elevation 21 Dec 2023

Floor plans

6 files
Floor Plan Q Block6 Jun 2024Basement Plan 26 Jun 2024Basement Plan6 Jun 2024Floor Plan Q Block1 Dec 2023Basement Plan 21 Dec 2023Basement Plan1 Dec 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (42 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2619 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Dss Infrastructure

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.