Skip to content

Aradhya Homes

by 4S Developers · Sector 67, Gurugram

Not on our price list yet

Possession 30 Sep 2021 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 67, Gurugram0.7 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
1,615–1,776 sq ft
In m²about 150–165 m², as declared
Registered
22 Jun 2020
Registered by
4S DEVELOPERS PVT. LTD.the company that filed it, for 4S Developers
Timeline
  1. 22 Jun 2020Registered with HARERAHARERA, read 4 Nov 2026
  2. 30 Sep 2021Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

172homes, 1,615 to 1,776 sq ft of carpet area
  • 1,500–2,000 sq ft1,615–1,776 sq ft172

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside10,464 m² in all, by use
  • Apartment buildings10,464 m² · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenModular kitchen
  • Kitchen appliancesYes-chimney, hob ,microwave and OWEN
  • WardrobesNormal wood wardrobes
  • FloorsItalian floor in drawing dining room and all bedroom verified tiles and same in bathroom
  • WallsPaint finishing
  • BathroomsJaguar make fittings
  • WindowsUPVC window
  • Main doorWood doors

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 67, GurugramSector 67, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.7 km
  • Delhi–Gurugram–SNB RRTS7.0 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Aradhya Homes registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/411/143/2020/27, registered on 22 Jun 2020. The register’s record shows an end date of 30 Sep 2021. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for Aradhya Homes?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2021. Its registration runs to 30 Sep 2021; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Aradhya Homes?From the records · Map pin and road lines, read 6 Sep 2026

Aradhya Homes is in Sector 67, Gurugram; the site address declared to HARERA is Sector 67-A, Gurugram, Haryana. In a straight line it is about 0.7 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Aradhya Homes?From the records · HARERA, read 4 Nov 2026

Aradhya Homes is a 4S Developers project, registered by its company 4S DEVELOPERS PVT. LTD..

The source ↗4S Developers's projects and court record

The records

What the registers hold for Aradhya Homes: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/411/143/2020/27: Registration lapsed. The register’s record shows an end date of 30 Sep 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
The court record of 4S Developers’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2021. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
GGM/411/143/2020/27
Registration date
22 Jun 2020
Registration valid till
30 Sept 2021
Declared possession
30 Sept 2021

Declared by the promoter to HARERA

Land area
10464 (Sqr/mtrs)
FAR
2.64 proposed of 2.64 permissible
licence
Land Owner
Estimated project cost
₹99.28 crore
Cost of land
₹44.28 crore
Construction to start
15 Apr 2020
Completion declared for
30 Sept 2021
Declared inventory · 2 types

Declared inventory

  • Apartment/Shops/Other Buildings · 120 units · 165 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 52 units · 150 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: yet to file for approval
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan22 Feb 2020

Layout plan

1 file
Latest Layout Plan22 Feb 2020

Zoning plan

1 file
Zoning Plan22 Feb 2020

Demarcation plan

1 file
Demarcation Plan22 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set22 Feb 2020

Services

Service plans

1 file
Service Plans on the Layout22 Feb 2020

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule22 Feb 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration22 Feb 2020

Money

Accounts and finance

3 files
Cash Flow Statement22 Feb 2020CA Certificate on the Application’s Figures22 Feb 2020Non-Default Certificate from a CA22 Feb 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit22 Feb 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Land Owner. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 13 Mar 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, residential flat
₹6,400 per sq ft

Sector 67, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan22 Feb 2020

Layout plan

1 file
Latest Layout Plan22 Feb 2020

Building plans

1 file
Approved Building Plans, Full Set22 Feb 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1313 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on 4S Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.