Not on our price list yet

Possession 30 Apr 2030 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 67, Gurugram0.7 km from Sohna Elevated Corridor (NH-248A), in a straight line
Carpet area
about 1,325 sq ft
In m²about 123.1 m², the average flat, as declared
Registered by
CONSOLIDATE REALTORS PRIVATE LIMITEDthe company that filed it, for Consolidate Realtors
Timeline
  1. 1 Nov 2029Registration valid toHARERA, read 4 Nov 2026
  2. 30 Apr 2030Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside1 acre in all, by use
  • Apartment buildings1 acre · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per design
  • KitchenStone over kitchen counter and SS sink.
  • Kitchen appliancesAs per design
  • LiftsElevators with speed as per vertical traffic
  • WardrobesAs per design
  • FloorsCombination of tile/wooden flooring/ anti skid tiles in drawing/dining room/bedroom/kitchen/toilets
  • WallsCement plaster/gypsum plaster/OBD/acrylic emulsion paint/DADO tile/stone as applicable in bedroom/kitchen/drawing/dining/toilets ETC.
  • BathroomsCP fittings and chinaware

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 67, GurugramSector 67, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.7 km
  • Delhi–Gurugram–SNB RRTS7.0 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is M3M OPUS AT M3M MERLIN registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/876/608/2024/103. Valid to 1 Nov 2029.

The source ↗
What is the possession timeline for M3M OPUS AT M3M MERLIN?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2030. Its registration runs to 1 Nov 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M OPUS AT M3M MERLIN?From the records · Map pin and road lines, read 6 Sep 2026

M3M OPUS AT M3M MERLIN is in Sector 67, Gurugram; the site address declared to HARERA is Sector-67, Gurugram. In a straight line it is about 0.7 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M OPUS AT M3M MERLIN?From the records · HARERA, read 4 Nov 2026

M3M OPUS AT M3M MERLIN is a Consolidate Realtors project, registered by its company CONSOLIDATE REALTORS PRIVATE LIMITED.

The source ↗Consolidate Realtors's projects and court record

The records

What the registers hold for M3M OPUS AT M3M MERLIN: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/876/608/2024/103: Registered. Valid to 1 Nov 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 53 OF 2011 is on the DTCP register, valid to 9 Jun 2029.DTCP, read 3 Nov 2026
The court record of Consolidate Realtors’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 48 HARERA files, with the dates we read them
Registration no.
GGM/876/608/2024/103
Registration valid till
1 Nov 2029
Declared possession
30 Apr 2030

Declared by the promoter to HARERA

Land area
1.000 (Acre) (4,046.86 sq m)
FAR
2.14 proposed of 2.14 permissible
licence
License No. 53 of 2011 dated 10.06.2011 renewed up to 09.06.2029
Estimated project cost
₹194.02 crore
Cost of land
₹23.70 crore
Construction to start
1 Oct 2024
Completion declared for
30 Apr 2030
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 134 units · 16,495 sq m carpet · 1 tower · total for 134 flats, about 123.1 m² each
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. BUILDING PLAN APPROVAL — declared: already been obtained (3 Sept 2024)
  • II. ELECTRICITY APPROVAL — declared: already been obtained (3 May 2017)
  • III. ASSURANCE TREATEED WATER — declared: already been obtained (4 Sept 2024)
  • IV. ASSURANCE SEWERAGE — declared: already been obtained (4 Sept 2024)
  • V. ASSURANCE WATER SUPPLY — declared: already been obtained (28 Aug 2024)
On file with HARERA · 48 files

On file with HARERA (48)

Plans

Site plan

2 files
Approved Site Plan3 Sept 2024Approved Site Plan3 Sept 2024

Layout plan

3 files
Phasing Plan Approved11 Oct 2024Approved Layout Plan3 Sept 2024Latest Layout Plan3 Sept 2024

Zoning plan

3 files
Revised Zoning Plan11 Oct 2024Approved Zoning Plan3 Sept 2024Zoning Plan3 Sept 2024

Demarcation plan

2 files
Approved Demarcation Plan3 Sept 2024Demarcation Plan3 Sept 2024

Building plans

5 files
Approved BR-III11 Oct 2024Section Plan11 Oct 2024Elevation Plan A&C11 Oct 2024

Floor plans

3 files
Basement-2 Floor Plan11 Oct 2024Basement-1 Floor Plan11 Oct 2024Typical Floor Plan11 Oct 2024

Services

Sewerage and drainage

4 files
Assurance Storm Water11 Oct 2024Sewerage Assurance11 Oct 2024Storm Water Layout11 Oct 2024Sewerage Layout Plan11 Oct 2024

Water supply

2 files
Assurance Water Supply11 Oct 2024Water Layout Plan11 Oct 2024

Electricity

2 files
Electrical Load Connection Approval11 Oct 2024Electrical Layout Plan11 Oct 2024

Roads

1 file
Road Layout Plan11 Oct 2024

Service plans

1 file
SPE Application11 Oct 2024

Approvals and clearances

DTCP licence

3 files
LC-IV & IV A11 Oct 2024LOI11 Oct 2024Licence Copy with Land Schedule3 Sept 2024

Environment clearance

1 file
Environment Clearence Approval11 Oct 2024

Fire safety

1 file
Fire Scheme Application11 Oct 2024

Other NOCs and clearances

2 files
Airport Height Clearence11 Oct 2024STP Treated Water NOC11 Oct 2024

Land records

Land records

6 files
Non-Encumbrance Certificate11 Oct 2024Information to Revenue Department11 Oct 2024Jamabandi11 Oct 2024

Money

Accounts and finance

5 files
CA Certificate- Non Default11 Oct 2024CA Certificate Incurred11 Oct 2024CA Certificate Inventory11 Oct 2024

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking11 Oct 2024The Promoter’s Declaration on Affidavit3 Sept 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

53 OF 2011 · Consolidate Realtors · GURGAON-MANESAR

Licence valid to 9 Jun 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Sept 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

53 OF 2011: 21 parcels, 13.3438 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 13.34 acres.

  • 98//10/1 min south5 marla
  • 98//11 min south7 kanal 4 marla
  • 98//196 kanal 13 marla
  • 98//20/16 kanal
Show the other 17 parcels
  • 98//21/26 kanal
  • 98//22/27 kanal 12 marla
  • 98//22/18 marla
  • 98//238 kanal
  • 98//248 kanal
  • 103//2/26 kanal 4 marla
  • 103//38 kanal
  • 103//48 kanal
  • 103//98 kanal
  • 103//1/1/12 kanal 10 marla
  • 103//1/1/22 kanal 10 marla
  • 103//1/23 kanal
  • 103//2/11 kanal 16 marla
  • 104//5/14 kanal
  • 104//5/24 kanal
  • 98//186 kanal 13 marla
  • 98//21/12 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 98//10/1 min south.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan3 Sept 2024Approved Site Plan3 Sept 2024

Layout plan

3 files
Phasing Plan Approved11 Oct 2024Approved Layout Plan3 Sept 2024Latest Layout Plan3 Sept 2024

Building plans

5 files
Approved BR-III11 Oct 2024Section Plan11 Oct 2024Elevation Plan A&C11 Oct 2024Elevation Plan B & D11 Oct 2024Terrace Plan11 Oct 2024

Floor plans

3 files
Basement-2 Floor Plan11 Oct 2024Basement-1 Floor Plan11 Oct 2024Typical Floor Plan11 Oct 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (48 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3095 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Consolidate Realtors

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.