Skip to content

JOYVILLE GURUGRAM-I

by Joyville Shapoorji Housing · Sector 102, Gurugram

Not on our price list yet

Possession 15 Jul 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 726 sq ft
In m²about 67.5 m², the average flat, as declared
Registered
29 Nov 2018
Registered by
JOYVILLE SHAPOORJI HOUSING PVT LTDthe company that filed it, for Joyville Shapoorji Housing
Timeline
  1. 7 Feb 2018Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 22 Oct 2018Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 29 Nov 2018Registered with HARERAHARERA, read 4 Nov 2026
  4. 15 Jul 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026
  5. 15 Mar 2023Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningProvision for split AC in bed room and living room
  • KitchenKitchen counter top – black granite. sink – S.S. sink without drainboard.
  • Lifts2NOS. passenger and 1 NOS. service elevator
  • FloorsVitrified or laminated wooden flooring or ceramic tile.
  • WallsOBD or ceramic tile
  • BathroomsConcealed bathroom fittings.
  • WindowsPowder - coated aluminium window with clear glass - 5 MM thick
  • Main doorWooden flush door with laminate on both side

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is JOYVILLE GURUGRAM-I registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/295/2018/27, registered on 29 Nov 2018. Ended 15 Mar 2023. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for JOYVILLE GURUGRAM-I?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 15 Jul 2022. Its registration runs to 15 Mar 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around JOYVILLE GURUGRAM-I?From the records · Map pin and road lines, read 6 Sep 2026

JOYVILLE GURUGRAM-I is in Sector 102, Gurugram; the site address declared to HARERA is Village-Kherki Majra, Sector-102, Tehsil-Gurugram, District-Gurugram, Haryana. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building JOYVILLE GURUGRAM-I?From the records · HARERA, read 4 Nov 2026

JOYVILLE GURUGRAM-I is a Joyville Shapoorji Housing project, registered by its company JOYVILLE SHAPOORJI HOUSING PVT LTD.

The source ↗Joyville Shapoorji Housing's projects and court record

The records

What the registers hold for JOYVILLE GURUGRAM-I: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/295/2018/27: Registration expired. Ended 15 Mar 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 14 OF 2018 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 6 Feb 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 7 Feb 2018, building plans 22 Oct 2018.Declared to HARERA, read 29 Oct 2026
The court record of Joyville Shapoorji Housing’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 15 Mar 2023. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 14 OF 2018 validity ended

    Named in this project’s application. Valid to 6 Feb 2026. The register links a completion certificate (LC-IX), dated 3 Dec 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
GGM/295/2018/27
Registration date
29 Nov 2018
Registration valid till
15 Mar 2023
Declared possession
15 Jul 2022

Declared by the promoter to HARERA

Land area
0.97 (Acre) (3,925.45 sq m)
FAR
2.5 proposed of 2.5 permissible
licence
14/2018
Estimated project cost
₹207.76 crore
Cost of land
₹26.76 crore
Layout plan, declared approved (field 5a)
7 Feb 2018
Building plans, declared approved
22 Oct 2018
Construction to start
1 Jan 2019
Completion declared for
15 Jul 2022
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 235 units · 15,858 sq m carpet · 2 towers · total for 235 flats, about 67.5 m² each
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENCE NO 14/2018 TOWN AND COUNTRY PLANNING DEPT GOVT OF HARYANA — declared: already been obtained (7 Feb 2018)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan15 Oct 2018

Layout plan

1 file
Latest Layout Plan15 Oct 2018

Zoning plan

1 file
Zoning Plan15 Oct 2018

Demarcation plan

1 file
Demarcation Plan15 Oct 2018

Building plans

1 file
Approved Building Plans, Full Set15 Oct 2018

Approvals and clearances

Occupation certificate (OC)

1 file
OC uploaded10 Jul 2025

DTCP licence

1 file
Licence Copy with Land Schedule15 Oct 2018

Land records

Land records

1 file
Non Encumbrance15 Oct 2018

Money

Accounts and finance

2 files
CA Certificate on the Application’s Figures15 Oct 2018Non-Default Certificate from a CA15 Oct 2018

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit15 Oct 2018

Other filings

Other filings

1 file
Correction in RC Validity5 Jun 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

14 OF 2018 · Joyville Shapoorji Housing Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 6 Feb 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Oct 2018 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

14 OF 2018: 27 parcels, 17.9 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.

The licence register prints the same licensed area, 17.9 acres.

  • 54//138 kanal
  • 54//148 kanal
  • 54//158 kanal
  • 54//16/17 marla
Show the other 23 parcels
  • 54//16/27 kanal
  • 54//177 kanal 7 marla
  • 54//187 kanal 7 marla
  • 54//58 kanal
  • 54//68 kanal
  • 54//78 kanal
  • rectangle 54, kila 4 min7 kanal 9 marla
  • rectangle 54, kila 12/2 min east north3 kanal 6 marla
  • rectangle 54, kila 19 min east north1 kanal 10 marla
  • rectangle 54, kila 3/2 min1 kanal 7 marla
  • rectangle 54, kila 8 min7 kanal 3 marla
  • rectangle 54, kila 9 min15 marla
  • rectangle 54, kila 12/1 min2 kanal 9 marla
  • 55//1/12 kanal 13 marla
  • 55//108 kanal
  • 55//11/13 kanal 11 marla
  • 55//11/24 kanal 9 marla
  • 55//128 kanal
  • 55//197 kanal 7 marla
  • 55//20/15 kanal 11 marla
  • 55//20/21 kanal 16 marla
  • 55//9/26 kanal 9 marla
  • rectangle 55, kila 13/11 kanal 8 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 54//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan15 Oct 2018

Layout plan

1 file
Latest Layout Plan15 Oct 2018

Building plans

1 file
Approved Building Plans, Full Set15 Oct 2018

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/223 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Joyville Shapoorji Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.