Skip to content
Under construction

M3M Altitude

by M3M India · Sector 65, Gurugram

₹27,000 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Jul 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 65, Gurugram2.4 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Asking rate
₹27,000 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
MANGLAM MULTIPLEX PRIVATE LIMITEDthe company that filed it, for M3M India
Timeline
  1. 18 Apr 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Jul 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.79 acres in all, by use
  • Roads1.29 acres · 46%
  • Apartment buildings1.003 acres · 36%
  • Other usesas the form names them: Parking, STP (sewage treatment plant), Underground, Electrical0.497 acres · 18%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningYes, in specific areas
  • KitchenStone over kitchen counter, SS sink
  • LiftsHigh speed elevators (passenger & service)
  • FloorsLaminated wooden flooring / vitrified tiles / ceramic tile
  • WallsAcylic emulsion paint / oil bound distemper, over gypsum/cement plaster / vitrified/ antiskid tiles in toilet DADO.
  • BathroomsCP fiting & chinaware
  • WindowsAluminium doors & windows
  • Main doorMAIN door - modular doors with hardwares.

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 65, GurugramSector 65, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)2.4 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 13 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 9

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is M3M Altitude registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/821/553/2024/48. Valid to 31 Jul 2031.

The source ↗
What is the possession timeline for M3M Altitude?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jul 2031. Its registration runs to 31 Jul 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M Altitude?From the records · Map pin and road lines, read 6 Sep 2026

M3M Altitude is in Sector 65, Gurugram; the site address declared to HARERA is Sector 65, Gurugram. In a straight line it is about 2.4 km from Sohna Elevated Corridor (NH-248A), 5.8 km from Delhi–Gurugram–SNB RRTS and 7.7 km from Dwarka Expressway.

The source ↗
What does a home in M3M Altitude cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹27,000 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for M3M Altitude: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/821/553/2024/48: Registered. Valid to 31 Jul 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 234 OF 2007 is on the DTCP register, valid to 15 Oct 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 18 Apr 2024, building plans 18 Apr 2024.Declared to HARERA, read 29 Oct 2026
The court record of M3M India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 65 HARERA files, with the dates we read them
Registration no.
GGM/821/553/2024/48
Registration valid till
31 Jul 2031
Declared possession
31 Jul 2031
Asking price (indicative)
₹27,000 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
2.79 (Acre) (11,290.73 sq m)
FAR
1.94 proposed of 1.94 permissible
licence
234 OF 2007 DATED 16.10.2007, 35 OF 2010 DATED 06.05.2010, 52 OF 2009 DATED 28.08.2009 AND 228 of 2023 DATED 31.10.2023
Estimated project cost
₹1016.75 crore
Cost of land
₹18.28 crore
Layout plan, declared approved (field 5a)
18 Apr 2024
Building plans, declared approved
18 Apr 2024
Construction to start
1 May 2024
Completion declared for
31 Jul 2031
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 342 units · 7,74,203.95 sq m carpet · 3 towers
Statutory approvals, as declared · 1

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (31 Oct 2023)
On file with HARERA · 65 files

On file with HARERA (65)

Plans

Site plan

2 files
T-Abc- Approved Site Plan2 May 2024Approved Site Plan19 Apr 2024

Layout plan

1 file
Latest Layout Plan19 Apr 2024

Zoning plan

1 file
Zoning Plan2 May 2024

Demarcation plan

1 file
Demarcation Plan2 May 2024

Building plans

7 files
BR-III30 May 2024Ta- Elevation 1 & 32 May 2024Ta- Section Xx2 May 2024

Floor plans

26 files
T-B-14th Floor Plan2 May 2024T-Abc- Typical Floor Balcony Details2 May 2024Tc-31st Floor Plan2 May 2024

Services

Sewerage and drainage

4 files
Assurance of Storm Water30 May 2024Assurance of Sewerage Connection30 May 2024Sewerage Layout2 May 2024Storm Water Layout2 May 2024

Water supply

2 files
Assurance of Water Supply30 May 2024Water Layout2 May 2024

Electricity

1 file
Electrical Layout2 May 2024

Roads

1 file
Road Layout2 May 2024

Service plans

2 files
Application of Service Plans & Estimates30 May 2024Service Plans on the Layout19 Apr 2024

Approvals and clearances

DTCP licence

3 files
LC-IV30 May 2024LOI30 May 2024Licence Copy with Land Schedule18 Apr 2024

Environment clearance

1 file
Environment Clearance Approval30 May 2024

Fire safety

1 file
Application of Fire Scheme30 May 2024

Other NOCs and clearances

2 files
AAI NOC30 May 2024Forest NOC30 May 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration19 Apr 2024

Money

Accounts and finance

4 files
CA Certificate Incurred30 May 2024CA Certificate Net Worth30 May 2024Cash Flow Statement2 May 2024Non-Default Certificate from a CA19 Apr 2024

The promoter’s papers

Declarations and affidavits

3 files
Affidavit 4 2 (L)(d)30 May 2024Bank Undertaking30 May 2024The Promoter’s Declaration on Affidavit2 May 2024

Other filings

Other filings

2 files
LC-Iva30 May 2024T-Abc- Oht Plan2 May 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 4 DTCP licences named on the application

234 OF 2007 · Manglam Multiplex Pvt Ltd · GURGAON-MANESAR

Licence valid to 15 Oct 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

35 OF 2010 · Manglam Multiplex · GURGAON-MANESAR

Licence valid to 5 May 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

52 OF 2009 · Manglam Multiplex · GURGAON-MANESAR

Licence valid to 27 Aug 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

228 OF 2023 · Manglam Multiplex Pvt Ltd · GURGAON-MANESAR

Licence valid to 30 Oct 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 19 Apr 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 4 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

234 OF 2007: 106 parcels, 54.6125 acres in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 54.61 acres.

  • 18//10/11 kanal 12 marla
  • 18//10/26 kanal 8 marla
  • 18//11/21 kanal 12 marla
  • 18//11/32 kanal 8 marla
Show the other 102 parcels
  • 18//12/15 kanal 14 marla
  • 18//4/17 kanal 12 marla
  • 18//4/28 marla
  • 18//58 kanal
  • 18//78 kanal
  • 18//88 kanal
  • 18//98 kanal
  • 19//1/1/17 kanal
  • 19//1/1/14 marla
  • 19//1/1/23 marla
  • 19//1/1/25 marla
  • 19//10/1/21 kanal 13 marla
  • 19//12/21 kanal 1 marla
  • 19//12/36 kanal 11 marla
  • 19//13/12 kanal 17 marla
  • 19//13/25 kanal 3 marla
  • 19//148 kanal
  • 19//157 kanal 10 marla
  • 19//1510 marla
  • 19//18/12 kanal 5 marla
  • 19//18/212 marla
  • 19//19/12 kanal 6 marla
  • 19//2/26 kanal 15 marla
  • 19//3/22 kanal 13 marla
  • 19//4/1/22 kanal 4 marla
  • 19//4/21 kanal
  • 19//5/112 marla
  • 19//5/28 marla
  • 19//5/35 kanal 16 marla
  • 19//5/41 kanal 4 marla
  • 19//67 kanal 15 marla
  • 19//65 marla
  • 19//7/13 kanal 4 marla
  • 19//7/24 kanal 16 marla
  • 19//8/2/13 kanal 18 marla
  • 19//8/2/2/13 kanal 17 marla
  • 19//8/2/2/21 marla
  • 19//9/11 kanal 3 marla
  • 19//9/26 kanal 1 marla
  • rectangle 19, kila 17/23 kanal 7 marla
  • rectangle 19, kila 24/1/11 kanal 11 marla
  • rectangle 19, kila 24/1/26 kanal 3 marla
  • 11//217 marla
  • 11//217 kanal 13 marla
  • 11//228 kanal
  • 11//23/13 kanal 11 marla
  • 11//24/25 kanal 5 marla
  • 12//128 kanal
  • 12//13/22 kanal 13 marla
  • 12//146 kanal
  • 12//142 kanal
  • 12//158 kanal
  • 12//168 kanal
  • 12//178 kanal
  • 12//238 kanal
  • 12//248 kanal
  • 12//258 kanal
  • 12//4 min2 kanal
  • 12//68 kanal
  • 12//74 kanal 5 marla
  • 12//73 kanal 15 marla
  • 20//1/16 kanal 16 marla
  • 20//1/21 kanal 4 marla
  • 20//108 kanal
  • 20//118 kanal
  • 20//12/11 kanal 12 marla
  • 20//12/28 marla
  • 20//12/33 kanal 4 marla
  • 20//12/42 kanal 4 marla
  • 20//12/512 marla
  • 20//13/1/23 kanal 16 marla
  • 20//13/1/11 kanal 8 marla
  • 20//13/22 kanal 16 marla
  • 20//148 kanal
  • 20//18/2/22 kanal
  • 20//19/112 marla
  • 20//19/21 kanal 12 marla
  • 20//19/38 marla
  • 20//19/43 kanal 4 marla
  • 20//19/52 kanal 4 marla
  • 20//2/25 kanal 2 marla
  • 20//38 kanal
  • 20//48 kanal
  • 20//6/1/13 kanal 17 marla
  • 20//6/1/27 marla
  • 20//6/2/13 kanal 10 marla
  • 20//6/2/26 marla
  • 20//7/17 kanal 7 marla
  • 20//7/213 marla
  • 20//88 kanal
  • 20//9/13 kanal 11 marla
  • 20//9/24 kanal 9 marla
  • rectangle 19, kila 17/14 kanal 13 marla
  • 10//11/14 kanal 14 marla
  • 10//11/23 kanal 6 marla
  • 10//208 kanal
  • 10//218 kanal
  • 17//6/14 kanal
  • 11//23/24 kanal 9 marla
  • 11//24/12 kanal 15 marla
  • 19//3/15 kanal 7 marla
  • 19//4/1/14 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

35 OF 2010: 1 parcel, 1 acre in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 1 acre.

  • 19//258 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

52 OF 2009: 7 parcels, 0.4375 acres in all, in Madabass (hadbast 87), tehsil Badshahpur.

The licence register prints the same licensed area, 0.44 acres.

  • 19//1/28 marla
  • 19//10/1/18 marla
  • 19//11/28 marla
  • 19//12/18 marla
Show the other 3 parcels
  • 19//2/11 kanal 5 marla
  • 19//9/38 marla
  • 19//19/3/15 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

228 OF 2023: 7 parcels, 3.975 acres in all, in Madabass (hadbast 85), tehsil Badshahpur.

The licence register prints the same licensed area, 3.975 acres.

  • 11//108 kanal
  • 11//18/13 kanal 15 marla
  • 11//8/14 kanal 13 marla
  • 11//98 kanal
Show the other 3 parcels
  • rectangle 11, kila 8/3/2 min7 marla
  • rectangle 11, kila 8/2 min1 kanal 5 marla
  • rectangle 11, kila 13 min5 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Madabass (hadbast 87) or Madabass (hadbast 85), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 18//10/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 65, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
T-Abc- Approved Site Plan2 May 2024Approved Site Plan19 Apr 2024

Layout plan

1 file
Latest Layout Plan19 Apr 2024

Building plans

7 files
BR-III30 May 2024Ta- Elevation 1 & 32 May 2024Ta- Section Xx2 May 2024Tb-Elevation 1 & 32 May 2024Tb- Section Xx2 May 2024Tc- Elevation 1 & 32 May 2024Tc- Section Xx2 May 2024

Floor plans

26 files
T-B-14th Floor Plan2 May 2024T-Abc- Typical Floor Balcony Details2 May 2024Tc-31st Floor Plan2 May 2024Tb-30th Floor Plan (Penthouse)2 May 2024Ta-16th & 25th Floor Plan2 May 2024Ta-31st Floor Plan2 May 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (65 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2884 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on M3M India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹27,000/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.