M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT)
by Roshni Builders · Sector 71, Gurugram
Not on our price list yet
About this project
Key facts
- Location
- Sector 71, Gurugram1.9 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Carpet area
- about 340 sq ft
In m²
about 31.5 m², the average flat, as declared - Registered by
- ROSHNI BUILDERS PRIVATE LIMITEDthe company that filed it, for Roshni Builders
- 17 Jan 2023Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Apr 2024Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings4.518 acres · 58%
- Roads2.145 acres · 27%
- Other usesas the form names them: Area, Boundary0.911 acres · 12%
- Parks and playgrounds0.274 acres · 3%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningChilled water AC system for office & provision forwater cooled DX system upto TAP OFF inside SHOP
- LiftsStandard make elevators
- FloorsRAW (tile for service apartment)
- WallsRAW wall/ partitions (paint for service apartment)
- BathroomsStandard chinaware, CP fittings, with/ withoutwash basin counter
- WindowsAluminium glazing
- Main doorAluminium / glass doors (wooden flush door forservice apartments)
- Electrical fittingsCommon areas & toilets to be provided with ledlight fixtures.
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)1.9 km
- Delhi–Gurugram–SNB RRTS2.9 km
- Dwarka ExpresswayOpen, 17 Aug 20253.1 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
GOOD EARTH 71No photo on file yet | Good Earth Plotted Development Private Limited (Formerly Known As M/s Raj Buildwell Pvt. Ltd.) | Same sector | — | — | 31 Mar 2030 |
No photo of the project on file yet | Signature Global | Same sector | New launch | ₹21,000/sq ft | 1 Jan 2033 |
ONE GOOD EARTHNo photo on file yet | Good Earth Plotted Development Private Limited (Formerly Known As M/s Raj Buildwell Pvt. Ltd.) | Same sector | — | — | 30 Sep 2024 |
| Birla Estates | Same sector | New launch | ₹17,000/sq ft | 31 Mar 2032 | |
No photo of the project on file yet | CHD Developers | Same sector | — | — | — |
| Signature Global | Same sector | Under construction | ₹18,000/sq ft | 31 May 2031 | |
Andour HeightsNo photo on file yet | Sarvpriya Securities | Same sector | — | — | — |
| Signature Global | Same sector | Under construction | ₹18,000/sq ft | 31 May 2031 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT) registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/700/432/2023/44. Ended 30 Apr 2024. The register shows it as: Registration expired.
The source ↗How is the connectivity around M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT)?From the records · Map pin and road lines, read 6 Sep 2026
M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT) is in Sector 71, Gurugram; the site address declared to HARERA is Sector 71, Gurugram. In a straight line it is about 1.9 km from Sohna Elevated Corridor (NH-248A), 2.9 km from Delhi–Gurugram–SNB RRTS and 3.1 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT)?From the records · HARERA, read 4 Nov 2026
M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT) is a Roshni Builders project, registered by its company ROSHNI BUILDERS PRIVATE LIMITED.
The source ↗Roshni Builders's projects and court recordWhat protections do I have as a buyer?General guidance
Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.
The records
What the registers hold for M3M BROADWAY (INCLUDING (RETAIL, OFFICE , MULTIPLEX) AND SERVICE APARTMENTS(M3M SKY LOFT): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/700/432/2023/44: Registration expired. Ended 30 Apr 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 71 OF 2018 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 24 Oct 2023.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 17 Jan 2023, building plans 17 Jan 2023.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 30 Apr 2024. HARERA Gurugram, read 4 Nov 2026. Source
Amber flag: Licence 71 OF 2018 validity ended
Named in this project’s application. Valid to 24 Oct 2023. The register links a completion certificate (LC-IX), dated 13 Aug 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 60 HARERA files, with the dates we read them
- Registration no.
- GGM/700/432/2023/44
- Registration valid till
- 30 Apr 2024
Declared by the promoter to HARERA
- Land area
- 7.84875 (Acre) (31,762.76 sq m)
- FAR
- 3.69 proposed of 3.69 permissible
- licence
- 71 of 2018 dated 25.10.2018
- Estimated project cost
- ₹1146.22 crore
- Cost of land
- ₹282.28 crore
- Layout plan, declared approved (field 5a)
- 17 Jan 2023
- Building plans, declared approved
- 17 Jan 2023
Declared inventory · 1 type
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL, OFFICE & SERVICE APARTMENTS · 2,364 units · 74,574.36 sq m carpet · total for 2,364 flats, about 31.5 m² each
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (25 Oct 2018)
- II. ENVIRONMENT CLEARANCE — declared: already been obtained (21 Jan 2019)
- III. AIRPORT NOC — declared: already been obtained (12 Jul 2018)
- IV. ELECTRICAL APPROVAL — declared: already been obtained (18 Nov 2020)
On file with HARERA · 60 files
On file with HARERA (60)
Plans
Site plan
1 fileLayout plan
12 filesZoning plan
1 fileDemarcation plan
2 filesBuilding plans
7 filesServices
Sewerage and drainage
4 filesWater supply
3 filesElectricity
2 filesRoads
1 fileLandscape and green areas
1 fileService plans
8 filesApprovals and clearances
Occupation certificate (OC)
3 filesCompletion certificate (CC)
1 fileDTCP licence
1 fileEnvironment clearance
1 fileFire safety
6 filesOther NOCs and clearances
3 filesLand records
Land records
1 fileMoney
Accounts and finance
1 fileThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
71 OF 2018 · Roshni Builders Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 24 Oct 2023
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 10 Feb 2023 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
71 OF 2018: 16 parcels, 7.8486 acres in all, in Fazilpur jharsa (hadbast 99), tehsil Badshahpur.
The licence register prints the same licensed area, 7.8488 acres.
- 43//15/11 kanal 2 marla
- 43//15/26 kanal 7 marla
- 43//16/17 kanal
- 43//51 kanal 13 marla 7 sarsai
Show the other 12 parcels
- 43//51 kanal
- 43//63 kanal 13 marla
- 43//61 kanal 19 marla
- 44//14 kanal 9 marla
- 44//10/13 kanal 4 marla
- 44//10/24 kanal 16 marla
- 44//11/14 kanal 12 marla
- 44//11/23 kanal 8 marla
- 44//12/14 kanal
- 44//2/1 min1 kanal 14 marla
- 44//20/15 kanal 18 marla
- 44//98 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Fazilpur jharsa (hadbast 99), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 43//15/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
12 filesBuilding plans
7 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (60 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/2350 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Roshni Builders
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

