Key facts

Location
Sector 95, Gurugram5.0 km from Dwarka Expressway, in a straight linePrices and what changed
Registered
14 Sep 2017
Timeline
  1. 1 Jan 1970Registration valid toHARERA, read 4 Nov 2026
  2. 14 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 19 Sep 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside12,444 m² in all, by use
  • Apartment buildings4,000 m² · 32%
  • Other usesas the form names them: Rain, Balance3,999 m² · 32%
  • Roads1,500 m² · 12%
  • Green belts1,000 m² · 8%
  • Pavements700 m² · 6%
  • Parks and playgrounds500 m² · 4%
  • Parking450 m² · 4%
  • Electricity sub-station200 m² · 2%
  • Sewage and waste treatment95 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts9 lifts (20PAX#7 lift + 10PAX#2 lift)
  • FloorsGranite stone for staircase, lobby, corridor & public area KOTA stone for service room vitrified + ceramic tiles for bathrooms & miscellaneous area
  • WallsCement plaster + OBD + enamel paint + white WASH in miscellaneous area
  • BathroomsWater conservatory fittings as per griha approval
  • Windows6T+12AG + 6T (DS40 – guardian glass) 6T+12AG + 5T (DS40 – guardian glass)
  • Electrical fittingsISI marked standard fittings
  • Water storageUG tank – 670 KLD OH tank – 110 KLD

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 95, GurugramSector 95, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20255.0 km
  • Delhi–Gurugram–SNB RRTS6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is New Town Square registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 192 OF 2017, registered on 14 Sep 2017. Ended 1 Jan 1970. The register shows it as: Registration expired.

The source ↗
How is the connectivity around New Town Square?From the records · Map pin and road lines, read 6 Sep 2026

New Town Square is in Sector 95, Gurugram; the site address declared to HARERA is Sector-95a, Main Pataudi Road, Hyatpur Village, Gurugram. In a straight line it is about 5.0 km from Dwarka Expressway and 6.0 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building New Town Square?From the records · HARERA, read 4 Nov 2026

New Town Square is a KPDK Buildtech project.

The source ↗KPDK Buildtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for New Town Square: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 192 OF 2017: Registration expired. Ended 1 Jan 1970.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 98 OF 2013 is on the DTCP register: Licence lapsed; the register prints its validity to 8 Nov 2019.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 19 Sep 2019, building plans 19 Sep 2019.Declared to HARERA, read 29 Oct 2026
The court record of KPDK Buildtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 1 Jan 1970. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 98 OF 2013 lapsed

    Named in this project’s application. Valid to 8 Nov 2019; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
192 OF 2017
Registration date
14 Sept 2017
Registration valid till
1 Jan 1970

Declared by the promoter to HARERA

Land area
3.075 (Acre) (12,444.08 sq m)
FAR
1.83 proposed of 1.87 permissible
licence
98 of 2013
Estimated project cost
₹137.77 crore
Cost of land
₹11.32 crore
Layout plan, declared approved (field 5a)
19 Sept 2019
Building plans, declared approved
19 Sept 2019
Declared inventory · 2 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL SHOPS, SERVICE APARTMENTS AND OTHER COMMERCIAL AREA 19.07.2017 · 496 units · 4,000 sq m carpet
  • APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL SHOPS, SERVICE APARTMENTS AND OTHER COMMERCIAL AREA ON 30.11.2019 · 496 units
Statutory approvals, as declared · 15

Statutory approvals, as declared

  • I. LICENSE FROM DTCP HARYANA — declared: already been obtained (6 Mar 2018)
  • II. REVISED BUILDING PLANS APPROVAL FROM CHIEF TOWN PLANNER HARYANA — declared: already been obtained (19 Sept 2019)
  • III. NOC FOR CONSTRUCTION FROM OFFICE OF THE ADMINISTRATOR HUDA GURGAON — declared: already been obtained (22 Jan 2014)
  • IV. HEIGHT CLEARANCE FROM AAI — declared: already been obtained (16 Jul 2019)
  • V. CLEARANCE FROM FOREST DEPARTMENT — declared: already been obtained (15 Jul 2014)
  • VI. NOC FOR ARAVALI PROJECT PLANTATION — declared: already been obtained (21 Jul 2014)
  • VII. ASSURANCE FOR POWER SUPPLY FROM DHBVN — declared: already been obtained (11 Nov 2014)
  • VIII. ASSURANCE OF WATER SUPPLY FOR DRINKING WATER — declared: already been obtained (13 Nov 2014)
  • IX. PERMIT FOR MINING EXCAVATION — declared: already been obtained (30 Jan 2015)
  • X. CLEARANCE FROM NATIONAL BOARD OF WILDLIFE — declared: already been obtained (4 Dec 2014)
  • XI. RENEWAL OF ENVIRONMENTAL CLEARANCE — declared: already been obtained (10 Oct 2019)
  • XII. CONSENT TO ESTABLISH FROM HARYANA STATE POLLUTION CONTROL BOARD — declared: already been obtained (16 Apr 2018)
  • XIII. NOC FOR CONSTRUCTION OF RAINWATER HARVESTING STRUCTURE — declared: already been obtained (9 May 2018)
  • XIV. APPROVAL OF FIRE FIGHTING SCHEME — declared: already been obtained (30 Oct 2019)
  • XV. OCCUPATION CERTIFICATE — declared: applied for but yet to receive (27 Sept 2019)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan6 Dec 2019

Layout plan

1 file
Latest Layout Plan6 Dec 2019

Zoning plan

1 file
Zoning Plan6 Dec 2019

Demarcation plan

1 file
Demarcation Plan6 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set6 Dec 2019

Services

Service plans

1 file
Service Plans on the Layout6 Dec 2019

Approvals and clearances

Occupation certificate (OC)

3 files
OC uploaded8 Aug 2023Oc uploaded4 Aug 2023Occupation certificate received dated 04.08.202028 Dec 2022

DTCP licence

1 file
Licence Copy with Land Schedule6 Dec 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration6 Dec 2019

Money

Accounts and finance

4 files
Kpdk Bank Account Details19 Feb 2020CA Certificate on the Application’s Figures6 Dec 2019Non-Default Certificate from a CA6 Dec 2019Cash Flow Statement6 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit6 Dec 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. HARERA/GGM/REP/RC/192/ 2O17/EXT/101/2019 DATED-08.05.201928 May 2020

Other filings

Other filings

4 files
Folder - D6 Dec 2019Folder - F6 Dec 2019Folder - C6 Dec 2019Folder - E6 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

98 OF 2013 · Mahender Kumar Gupta · GURGAON-MANESAR

Licence valid to 8 Nov 2019

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

98 OF 2013: 8 parcels, 3.075 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 3.08 acres.

  • 10//105 kanal
  • 10//117 kanal
  • 10//1118 marla
  • 10//2/12 kanal 16 marla
Show the other 4 parcels
  • 10//206 kanal 10 marla
  • 10//2010 marla
  • 11//151 kanal 10 marla
  • 11//158 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,04,750 per sq yd

Sector 95, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan6 Dec 2019

Layout plan

1 file
Latest Layout Plan6 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set6 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1039 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on KPDK Buildtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.