OYSTER ARCADE

by Adani M2K Projects · Sector 102, Gurugram

Not on our price list yet

Possession 24 Nov 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight line
Registered by
ADANI M2K PROJECTS LLPthe company that filed it, for Adani M2K Projects
Timeline
  1. 26 Nov 2020Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 24 Nov 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.5 acres in all, by use
  • Other usesas the form names them: Roads, Toilet, UGT or WTP underground, Rain water harvesting system underground1.494 acres · 60%
  • Plots for sale0.875 acres · 35%
  • Electricity sub-station0.104 acres · 4%
  • Sewage and waste treatment0.027 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is OYSTER ARCADE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/476/208/2021/44. The register’s record shows an end date of 24 Nov 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for OYSTER ARCADE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 24 Nov 2025. Its registration runs to 24 Nov 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around OYSTER ARCADE?From the records · Map pin and road lines, read 6 Sep 2026

OYSTER ARCADE is in Sector 102, Gurugram; the site address declared to HARERA is Village Kherki Majra, Sector 102 Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building OYSTER ARCADE?From the records · HARERA, read 4 Nov 2026

OYSTER ARCADE is a Adani M2K Projects project, registered by its company ADANI M2K PROJECTS LLP.

The source ↗Adani M2K Projects's projects and court record

The records

What the registers hold for OYSTER ARCADE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/476/208/2021/44: Registration lapsed. The register’s record shows an end date of 24 Nov 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 37 OF 2020 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 24 Nov 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 26 Nov 2020.Declared to HARERA, read 29 Oct 2026
The court record of Adani M2K Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 24 Nov 2025. HARERA Gurugram, read 4 Nov 2026. Source

  • Amber flag: Licence 37 OF 2020 validity ended

    Named in this project’s application. Valid to 24 Nov 2025. The register links a completion certificate (LC-IX), dated 24 Oct 2024, against this licence. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 23 HARERA files, with the dates we read them
Registration no.
GGM/476/208/2021/44
Registration valid till
24 Nov 2025
Declared possession
24 Nov 2025

Declared by the promoter to HARERA

Land area
2.5 (Acre) (10,117.14 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
37 OF 2020 DATED 25.11.2020
Estimated project cost
₹25.19 crore
Cost of land
₹0.93 crore
Layout plan, declared approved (field 5a)
26 Nov 2020
Construction to start
1 Jan 2021
Completion declared for
24 Nov 2025
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LICENCE 37 OF 2020 — declared: already been obtained (25 Nov 2020)
  • II. WATER SUPPLY (DRINKING) — declared: already been obtained (30 Jun 2021)
  • III. SEWAGE DISPOSAL — declared: already been obtained (25 Jun 2021)
  • IV. STORM WATER DRAINAGE — declared: already been obtained (25 Jun 2021)
  • V. LAYOUT PLAN — declared: already been obtained (26 Nov 2020)
On file with HARERA · 23 files

On file with HARERA (23)

Plans

Site plan

2 files
Approved Site Plan7 Dec 2021A SCO 102 Superimposed Layout7 Dec 2021

Layout plan

3 files
External Light Layout13 Dec 2021Coordinated Layout7 Dec 2021Latest Layout Plan14 Dec 2020

Zoning plan

1 file
Zoning Plan7 Dec 2021

Demarcation plan

1 file
Demarcation Plan14 Dec 2020

Building plans

1 file
Approved Building Plans, Full Set7 Dec 2021

Services

Sewerage and drainage

2 files
Sewer Water Drainage Layout13 Dec 2021Storm Water Layout7 Dec 2021

Water supply

1 file
Water Supply Layout13 Dec 2021

Roads

1 file
Road Layout13 Dec 2021

Service plans

2 files
Service Plan Estimate Approval Letter13 Dec 2021Service Plans on the Layout7 Dec 2021

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule14 Dec 2020

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration7 Dec 2021

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures13 Dec 2021Cash Flow Statement7 Dec 2021Non-Default Certificate from a CA14 Dec 2020

The promoter’s papers

Declarations and affidavits

3 files
The Promoter’s Declaration on Affidavit7 Dec 2021CA Certificate Rep-I7 Dec 2021Rep II7 Dec 2021

Other filings

Other filings

1 file
E Document 517 Dec 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

37 OF 2020 · Adani M2K Projects LLP · GURGAON-MANESAR

Licence valid to 24 Nov 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Jan 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

37 OF 2020: 7 parcels, 2.5 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.

The licence register prints the same licensed area, 2.5 acres.

  • 45//10/15 kanal 8 marla
  • 45//10/22 kanal
  • 45//113 kanal 2 marla
  • 45//123 kanal 7 marla
Show the other 3 parcels
  • 45//131 kanal
  • 45//81 marla
  • 45//95 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 45//10/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan7 Dec 2021A SCO 102 Superimposed Layout7 Dec 2021

Layout plan

3 files
External Light Layout13 Dec 2021Coordinated Layout7 Dec 2021Latest Layout Plan14 Dec 2020

Building plans

1 file
Approved Building Plans, Full Set7 Dec 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (23 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1502 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adani M2K Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.