Skip to content

Oyster Grande- Tower G

by Adani M2K Projects · Sector 102, Gurugram

From ₹4.60 CrPlatinum Tower

From ₹5.70 CrPlatinum Tower

As listed on adanirealty.com (“4.6 Crore.”, “₹ 5.7Cr Onwards*”), read 26 Oct 2026.

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
2,333–4,282 sq ft
In m²about 217–398 m², as declared
Registered
10 Aug 2017
Price, as listed
From ₹4.60 Cr (Platinum Tower) · From ₹5.70 Cr (Platinum Tower)
Registered by
ADANI M2K PROJECTS LLPthe company that filed it, for Adani M2K Projects
Timeline
  1. 27 Apr 2012Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 10 Aug 2017Registered with HARERAHARERA, read 3 Nov 2026
  3. 30 Sep 2024Registration valid toHARERA, read 3 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

58homes, 2,333 to 4,282 sq ft of carpet area
  • 2,000–2,500 sq ft2,333–2,354 sq ft56
  • 3,000 sq ft and above4,282 sq ft2

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Lifts2 passanger lift (14) 1 service lift 1050KG
  • FloorsGF lobby- marble flooring, typical floor lobby-granite, common area stair CASE- KOTA stone
  • WindowsUPVC windows
  • Main doorLaminated jlush door
  • Electrical fittingsModular switches / sockets and LED lights
  • Water storageOverhead tank-domestic 7.5KL, overhead tank FIRE-10KL, overhead tank flushing- 3.5KL

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Oyster Grande- Tower G registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as 37 OF 2017, registered on 10 Aug 2017. The register’s record shows an end date of 30 Sep 2024. The register shows it as: Registration lapsed.

The source ↗
How is the connectivity around Oyster Grande- Tower G?From the records · Map pin and road lines, read 6 Sep 2026

Oyster Grande- Tower G is in Sector 102, Gurugram; the site address declared to HARERA is Sector 102/102a. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What does a home in Oyster Grande- Tower G cost, and how does that compare nearby?From the records · adanirealty.com, read 26 Oct 2026

The developer's website, adanirealty.com, lists homes from ₹4.60 Cr ("4.6 Crore.") and ₹5.70 Cr ("₹ 5.7Cr Onwards*"). Prices change; ask the developer for its current price list.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Oyster Grande- Tower G?From the records · HARERA, read 3 Nov 2026

Oyster Grande- Tower G is a Adani M2K Projects project, registered by its company ADANI M2K PROJECTS LLP.

The source ↗Adani M2K Projects's projects and court record

The records

What the registers hold for Oyster Grande- Tower G: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 37 OF 2017: Registration lapsed. The register’s record shows an end date of 30 Sep 2024.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 29 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 9 Apr 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 27 Apr 2012, building plans 27 Apr 2012.Declared to HARERA, read 29 Oct 2026
The court record of Adani M2K Projects’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 29 OF 2012 lapsed

    Named in this project’s application. Valid to 9 Apr 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 30 Sep 2024. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 12 HARERA files, with the dates we read them
Registration no.
37 OF 2017
Registration date
10 Aug 2017
Registration valid till
30 Sept 2024

Declared by the promoter to HARERA

Land area
0.2401 (Acre) (971.65 sq m)
FAR
1.75 proposed of 1.75 permissible
licence
29 of 2012 (10-04-2012)
Estimated project cost
₹136.53 crore
Cost of land
₹45.84 crore
Layout plan, declared approved (field 5a)
27 Apr 2012
Building plans, declared approved
27 Apr 2012
Declared inventory · 3 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-1 · 44 units · 216.73 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-2 · 12 units · 218.68 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-3 · 2 units · 397.81 sq m carpet · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. SERVICE ESTIMATE PLAN — declared: already been obtained (2 Aug 2017)
  • II. FOREST NOC — declared: already been obtained (22 Feb 2013)
  • III. LICENCE — declared: already been obtained (10 Apr 2012)
  • IV. CONSENT TO ESTABLISH — declared: already been obtained (10 Jun 2014)
  • V. ENVIRONMENTAL CLEARANCE — declared: already been obtained (24 Dec 2013)
  • VI. AIRPORT HEIGHT CLEARANCE NOC — declared: already been obtained (26 Apr 2017)
  • VII. FIRE SCHEME APPROVAL — declared: already been obtained (23 Mar 2013)
  • VIII. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (21 Jun 2017)
On file with HARERA · 12 files

On file with HARERA (12)

Plans

Site plan

1 file
Approved Site Plan31 Dec 2019

Layout plan

1 file
Latest Layout Plan31 Dec 2019

Zoning plan

1 file
Zoning Plan31 Dec 2019

Demarcation plan

1 file
Demarcation Plan31 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set31 Dec 2019

Services

Service plans

1 file
Service Plans on the Layout31 Dec 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule31 Dec 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration31 Dec 2019

Money

Accounts and finance

3 files
Cash Flow Statement31 Dec 2019Non-Default Certificate from a CA31 Dec 2019CA Certificate on the Application’s Figures31 Dec 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit31 Dec 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

29 OF 2012 · Aakarshan Estates Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 9 Apr 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

29 OF 2012: 20 parcels, 15.7188 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.

The licence register prints the same licensed area, 15.72 acres.

  • 45//114 kanal 6 marla
  • 45//124 kanal 13 marla
  • 45//137 kanal
  • 45//148 kanal
Show the other 16 parcels
  • 45//15/14 kanal
  • 45//16/23 kanal
  • 45//178 kanal
  • 45//188 kanal
  • 45//198 kanal
  • 45//206 kanal
  • 45//215 kanal 19 marla
  • 45//228 kanal
  • 45//238 kanal
  • 45//248 kanal
  • 45//258 kanal
  • 45//6/11 kanal 12 marla
  • 45//6/26 kanal 8 marla
  • 45//78 kanal
  • 45//87 kanal 19 marla
  • 45//92 kanal 18 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 45//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan31 Dec 2019

Layout plan

1 file
Latest Layout Plan31 Dec 2019

Building plans

1 file
Approved Building Plans, Full Set31 Dec 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (12 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1170 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adani M2K Projects

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

From ₹4.60 CrBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.