Not on our price list yet

Possession 30 Sep 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 77, Gurugram1.1 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,139–1,498 sq ft
In m²about 106–139 m², as declared
Registered by
KEYSTONE WORLD PVT LTDthe company that filed it, for Keystone World
Timeline
  1. 13 Feb 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

175homes, 1,139 to 1,498 sq ft of carpet area
  • 1,000–1,500 sq ft1,139–1,498 sq ft175

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside16,329 m² in all, by use
  • Other usesas the form names them: Solid waste management plant, Rain water harvesting system6,405 m² · 39%
  • Roads4,033 m² · 25%
  • Parks and playgrounds2,704 m² · 17%
  • Apartment buildings1,628 m² · 10%
  • Club house785 m² · 5%
  • Parking462 m² · 3%
  • Sewage and waste treatment312 m² · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningSplit AC'S
  • KitchenCeramic tiles above kitchen platform upto approximately 2 FEET and low VOC acrylic emulsion paint in the balance area,ceiling - low VOC acrylic emulsion paint and PART POP
  • LiftsHigh speed elevators
  • FloorsLiving room / dining family lounge - italian/ imported marble bed room-laminated wooden floor kitchen-tiles bathrooms - tiles balconies / terraces- tiles servant room & toilet-tiles apartment lift lobbies (private).-italian/ imported marble
  • WallsWalls - low VOC acrylic emulsion paint , ceramic tiles above kitchen platform upto approximately 2 FEET and low VOC acrylic emulsion paint in the balance area ,vitrified tiles up to false ceiling with granite on the counter ,M S handrail low VOC acrylic emulsion paint
  • BathroomsKohler, groha& ROCA or equivalent
  • WindowsUPVC framed single glazing
  • Main doorFlash door

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 77, GurugramSector 77, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.1 km
  • Dwarka ExpresswayOpen, 17 Aug 20252.6 km
  • Sohna Elevated Corridor (NH-248A)6.4 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SEASONS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/823/555/2024/50. Valid to 30 Sep 2029.

The source ↗
What is the possession timeline for SEASONS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2029. Its registration runs to 30 Sep 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SEASONS?From the records · Map pin and road lines, read 6 Sep 2026

SEASONS is in Sector 77, Gurugram; the site address declared to HARERA is Sector 77, Gurugram. In a straight line it is about 1.1 km from Delhi–Gurugram–SNB RRTS, 2.6 km from Dwarka Expressway and 6.4 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SEASONS?From the records · HARERA, read 4 Nov 2026

SEASONS is a Keystone World project, registered by its company KEYSTONE WORLD PVT LTD.

The source ↗Keystone World's projects and court record

The records

What the registers hold for SEASONS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/823/555/2024/50: Registered. Valid to 30 Sep 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 67 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 15 Jul 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 13 Feb 2024.Declared to HARERA, read 29 Oct 2026
The court record of Keystone World’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 67 OF 2011 lapsed

    Named in this project’s application. Valid to 15 Jul 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 42 HARERA files, with the dates we read them
Registration no.
GGM/823/555/2024/50
Registration valid till
30 Sept 2029
Declared possession
30 Sept 2029

Declared by the promoter to HARERA

Land area
4.0350 (Acre) (16,329.07 sq m)
FAR
1.78 proposed of 1.78 permissible
licence
67 of 2011 dated 16-07-2011 valid till 15-07-2026
Estimated project cost
₹245.80 crore
Cost of land
₹28.40 crore
Building plans, declared approved
13 Feb 2024
Construction to start
1 Apr 2024
Completion declared for
30 Sept 2029
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 25 units · 106.37 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 25 units · 106.16 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 25 units · 106.38 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 25 units · 106.15 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 25 units · 105.78 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 50 units · 139.13 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (13 Feb 2024)
  • II. AAI — declared: already been obtained (1 Sept 2023)
  • III. ELECTRICAL LOAD NOC — declared: already been obtained (4 Jan 2021)
  • IV. FOREST NOC — declared: already been obtained (27 Aug 2013)
  • V. WATER ASSURANCE — declared: already been obtained (16 Aug 2023)
  • VI. SEWERAGE ASSURANCE — declared: already been obtained (18 Aug 2023)
  • VII. STROM WATER ASSURANCE — declared: already been obtained (16 Feb 2024)
  • VIII. FIRE SCHEME APPROVAL — declared: already been obtained (22 Mar 2024)
On file with HARERA · 42 files

On file with HARERA (42)

Plans

Site plan

2 files
Copy of Architectural and Plumbing - Plan - Site Plan7 Jun 2024Approved Site Plan3 May 2024

Layout plan

1 file
Latest Layout Plan3 May 2024

Zoning plan

1 file
Zoning Plan26 Feb 2024

Demarcation plan

1 file
Demarcation Plan26 Feb 2024

Building plans

5 files
Community Building Roof Plan7 Jun 2024Approved Building Plans, Full Set7 Jun 2024Elevation Plan26 Feb 2024

Floor plans

4 files
Community Building Floor Plan7 Jun 2024Certificate for Units7 Jun 2024Floor Plan7 Jun 2024Parking Plan26 Feb 2024

Services

Sewerage and drainage

2 files
Storm Water Assurance7 Jun 2024Assurances - STP Treated Water, Drinking Water and Sewage7 Jun 2024

Water supply

2 files
Copy of Architectural and Plumbing - Plan - Basement 17 Jun 2024Water Assurance26 Feb 2024

Electricity

1 file
Electrical Load Availability7 Jun 2024

Service plans

1 file
Service Plans on the Layout24 Feb 2024

Approvals and clearances

DTCP licence

3 files
LOI7 Jun 2024LC IV7 Jun 2024Licence Copy with Land Schedule26 Feb 2024

Fire safety

5 files
Fire Approval - Fire Fighting Schematic Diagram Layout7 Jun 2024Fire Approval -Community Building Ground Floor Fire & Ventilation Layout7 Jun 2024Fire Approval -Eletrical Site Plan with Lighting Protection System7 Jun 2024

Other NOCs and clearances

4 files
Sewerage NOC7 Jun 2024Arawali Clearance7 Jun 2024Airport Height Clearance NOC7 Jun 2024Forest NOC7 Jun 2024

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration7 Jun 2024Non Encumbrance Certificate7 Jun 2024

Money

Accounts and finance

4 files
Cash Flow Statement7 Jun 2024CA Certificate on the Application’s Figures7 Jun 2024Cost Incurred on Project CA7 Jun 2024Non-Default Certificate from a CA24 Feb 2024

The promoter’s papers

Declarations and affidavits

2 files
The Promoter’s Declaration on Affidavit7 Jun 2024Bank Undertaking7 Jun 2024

Other filings

Other filings

2 files
Bip - Keystone7 Jun 2024Site Overlap with Khasara (3)-Model7 Jun 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

67 OF 2011 · Janpriya Build Estate · GURGAON-MANESAR

Licence valid to 15 Jul 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 27 Feb 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

67 OF 2011: 12 parcels, 16.5406 acres in all, in Shikohpur (hadbast 160), tehsil Manesar.

The licence register prints the same licensed area, 16.54 acres.

  • rectangle 1041, kila 1041/14 bigha 19 biswa
  • rectangle 911, kila 911/32 bigha 3 biswa
  • rectangle 907, kila 9072 bigha 1 biswa
  • rectangle 912, kila 9123 bigha 4 biswa
Show the other 8 parcels
  • rectangle 913, kila 91319 biswa
  • rectangle 908, kila 9081 bigha 6 biswa
  • rectangle 906, kila 906/11 bigha 8 biswa 14 biswansi
  • rectangle 1042, kila 1042/116 biswa 17 biswansi
  • rectangle 1042, kila 1042/23 bigha 12 biswa 3 biswansi
  • rectangle 906, kila 906/217 biswa 6 biswansi
  • rectangle 897, kila 897/17 biswa 6 biswansi
  • rectangle 1043, kila 10434 bigha 15 biswa

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Shikohpur (hadbast 160), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as rectangle 1041, kila 1041/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Copy of Architectural and Plumbing - Plan - Site Plan7 Jun 2024Approved Site Plan3 May 2024

Layout plan

1 file
Latest Layout Plan3 May 2024

Building plans

5 files
Community Building Roof Plan7 Jun 2024Approved Building Plans, Full Set7 Jun 2024Elevation Plan26 Feb 2024Briii26 Feb 2024Section Plan26 Feb 2024

Floor plans

4 files
Community Building Floor Plan7 Jun 2024Certificate for Units7 Jun 2024Floor Plan7 Jun 2024Parking Plan26 Feb 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (42 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2826 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Keystone World

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.