Signature Global Aspire

by Signature Infrabuild India · Sector 95, Gurugram

Not on our price list yet

Possession 31 Oct 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 95, Gurugram5.0 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 586 sq ft
In m²about 54.4 m², the average flat, as declared
Registered
14 Nov 2019
Registered by
SIGNATURE INFRABUILD PRIVATE LIMITEDthe company that filed it, for Signature Infrabuild India
Timeline
  1. 30 Sep 2019Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 3 Oct 2019Layout plan approveddeclared to HARERA, read 29 Oct 2026
  3. 14 Nov 2019Registered with HARERAHARERA, read 4 Nov 2026
  4. 31 Oct 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  5. 28 Apr 2027Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.108 acres in all, by use
  • Roads2.297 acres · 45%
  • Green belts1.222 acres · 24%
  • Apartment buildings0.857 acres · 17%
  • Sewage and waste treatment0.434 acres · 8%
  • Other uses0.204 acres · 4%
  • Club house0.094 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenISI marked
  • LiftsISI marked
  • FloorsVitrified & ceramic tiles
  • WallsOBD
  • BathroomsISI marked
  • WindowsAluminiumn/UPVC
  • Main doorFlush door
  • Electrical fittingsISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 95, GurugramSector 95, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20255.0 km
  • Delhi–Gurugram–SNB RRTS6.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 6 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Signature Global Aspire registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/375/107/2019/69, registered on 14 Nov 2019. Valid to 28 Apr 2027.

The source ↗
What is the possession timeline for Signature Global Aspire?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Oct 2023. Its registration runs to 28 Apr 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Signature Global Aspire?From the records · Map pin and road lines, read 6 Sep 2026

Signature Global Aspire is in Sector 95, Gurugram; the site address declared to HARERA is Village Dhorka, Sector 95 Gurugram, Haryana. In a straight line it is about 5.0 km from Dwarka Expressway and 6.0 km from Delhi–Gurugram–SNB RRTS.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Signature Global Aspire?From the records · HARERA, read 4 Nov 2026

Signature Global Aspire is a Signature Infrabuild India project, registered by its company SIGNATURE INFRABUILD PRIVATE LIMITED.

The source ↗Signature Infrabuild India's projects and court record

The records

What the registers hold for Signature Global Aspire: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/375/107/2019/69: Registered. Valid to 28 Apr 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 73 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 3 Jul 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 3 Oct 2019, building plans 30 Sep 2019.Declared to HARERA, read 29 Oct 2026
The court record of Signature Infrabuild India’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 73 OF 2019 lapsed

    Named in this project’s application. Valid to 3 Jul 2026; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration ends soon

    Valid to 28 Apr 2027. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 32 HARERA files, with the dates we read them
Registration no.
GGM/375/107/2019/69
Registration date
14 Nov 2019
Registration valid till
28 Apr 2027
Declared possession
31 Oct 2023

Declared by the promoter to HARERA

Land area
5.1125 (Acre) (20,689.55 sq m)
FAR
the application prints 236, which is not a ratio
licence
73 of 2019 dated 04.07.2019
Estimated project cost
₹181.97 crore
Cost of land
₹42.04 crore
Layout plan, declared approved (field 5a)
3 Oct 2019
Building plans, declared approved
30 Sept 2019
Construction to start
1 Nov 2019
Completion declared for
31 Oct 2023
Declared inventory · 5 types

Declared inventory

  • Apartment/Shops/Other Buildings · 200 units · 10,996.4 sq m carpet · total for 200 flats, about 55 m² each
  • Apartment/Shops/Other Buildings · 160 units · 8,797.12 sq m carpet · total for 160 flats, about 55 m² each
  • Apartment/Shops/Other Buildings · 160 units · 8,797.12 sq m carpet · total for 160 flats, about 55 m² each
  • Apartment/Shops/Other Buildings · 58 units · 3,257.738 sq m carpet · total for 58 flats, about 56.2 m² each
  • Apartment/Shops/Other Buildings · 168 units · 8,766.44 sq m carpet · total for 168 flats, about 52.2 m² each
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE 73 OF 2019 — declared: already been obtained (4 Jul 2019)
  • II. 3863 — declared: already been obtained (26 Aug 2019)
  • III. GMDA/SEW/2019/2224 — declared: already been obtained (29 Aug 2019)
  • IV. DRG.NO. DTCP 7046 — declared: already been obtained (5 Jul 2019)
  • V. PALM/NORTH/B/090419/427556 — declared: already been obtained (9 Sept 2019)
  • VI. M3Y-NK0-FR92 — declared: already been obtained (20 Jun 2019)
On file with HARERA · 32 files

On file with HARERA (32)

Plans

Site plan

2 files
Site Plan and Area Sheet7 Nov 2019Approved Site Plan27 Sept 2019

Layout plan

1 file
Latest Layout Plan27 Sept 2019

Demarcation plan

1 file
Demarcation Plan7 Nov 2019

Building plans

10 files
Tower-E, Elevation A & B7 Nov 2019Commercial Gf,ff,sf & Terrace Floor Plan7 Nov 2019Tower-E, Elevation C & D7 Nov 2019

Floor plans

3 files
Tower-E, Area Diagram Chart7 Nov 2019Carpet Area7 Nov 2019Parking & Area Sheet7 Nov 2019

Services

Landscape and green areas

1 file
Landscape & Area Sheet7 Nov 2019

Service plans

1 file
Service Coordination Plan7 Nov 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Amendment in the RC/REP/HARERA/GGM/375/107/2019/69 dated 14.11.2019 after additional FAR of 332.637 sqmtr achieved via revised building plans vide memo no ZP-1339/PA(DK)/2023/29485 dated 06.09.2023 of which amendment in registration approved vide agenda no RC/REP/HARERA/GGM/375/107/2019/69 dated 29.01.2024 registered earlier without any change in the date of occupation certificate and completion date24 May 2024

Completion certificate (CC)

1 file
Tower-E, Section-CC & DD7 Nov 2019

DTCP licence

1 file
Licence Copy with Land Schedule27 Sept 2019

Fire safety

1 file
Fire Fighting Layout Plan7 Nov 2019

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration13 Nov 2019Super Imposed Approved Site Plan Overlap Sajra Plan7 Nov 2019

Money

Accounts and finance

1 file
Non-Default Certificate from a CA7 Nov 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit27 Sept 2019

HARERA’s orders

HARERA’s orders

2 files
EXTENSION IN PROJECT CONTINUATION APPROVED WITH RC NO.: RC/REP/HARERA/GGM/69 of 2019/7(3)/68/2025/10 Date: 13.04.202616 Apr 2026Extension No. 02 of 2024 dated 29.04.202423 May 2024

Other filings

Other filings

3 files
PROJECT CONTINUATION- RC/REP/HARERA/GGM/69 of 2019/7(3)/68/2025/10 DATED 13.04.202616 Apr 2026PROJECT CONTINUATION- RC/REP/HARERA/GGM/69 of 2019/7(3)/68/2025/10 DATED 06.05.202513 May 2025Commercial Gf,ff,sf & Area Diagram7 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

73 OF 2019 · SIGNATURE INFRABUILD PVT. LTD. · GURGAON-MANESAR

Licence valid to 3 Jul 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 27 Sept 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

73 OF 2019: 8 parcels, 5.1125 acres in all, in Dhorka (hadbast 120), tehsil Harsaru.

The licence register prints the same licensed area, 5.1125 acres.

  • 11//38 kanal
  • 11//83 kanal 8 marla
  • 3//18/22 kanal
  • 3//19/22 kanal
Show the other 4 parcels
  • 3//20/1/21 kanal 18 marla
  • 3//228 kanal
  • 3//238 kanal
  • 3//21/27 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Dhorka (hadbast 120), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//3.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 95, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan and Area Sheet7 Nov 2019Approved Site Plan27 Sept 2019

Layout plan

1 file
Latest Layout Plan27 Sept 2019

Building plans

10 files
Tower-E, Elevation A & B7 Nov 2019Commercial Gf,ff,sf & Terrace Floor Plan7 Nov 2019Tower-E, Elevation C & D7 Nov 2019Commercial Elevation A & B7 Nov 2019Commercial Section-A-A7 Nov 2019Tower-D, Elevation Aa & Bb7 Nov 2019

Floor plans

3 files
Tower-E, Area Diagram Chart7 Nov 2019Carpet Area7 Nov 2019Parking & Area Sheet7 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (32 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/872 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Infrabuild India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.