SIGNATURE GLOBAL CITY 81(2)

by Sternal Buildcon · Sector 81, Gurugram

Not on our price list yet

Possession 28 Feb 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 81, Gurugram1.4 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
304–933 sq ft
In m²about 28–87 m², as declared
Registered by
STERNAL BUILDCON PRIVATE LIMITEDthe company that filed it, for Sternal Buildcon
Timeline
  1. 5 Mar 2021Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 8 Aug 2022Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 28 Feb 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 27 Feb 2027Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

408homes, 304 to 933 sq ft of carpet area
  • Under 1,000 sq ft304–933 sq ft408

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside2.79 acres in all, by use
  • Apartment buildings2.79 acres · 100%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenOPEN kitchen
  • LiftsOTIS/fugite CH
  • FloorsVitrified & ceramic tiles
  • WallsCeramic kajaria, varmora, orient
  • BathroomsKajaria, varmora, orient
  • WindowsLaminated, 34MM thick
  • Main doorLaminated, 34MM thick
  • Electrical fittingsPolycab/HA vells/RR cables

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 81, GurugramSector 81, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.4 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.8 km
  • Sohna Elevated Corridor (NH-248A)9.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 8 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Registered, no OC or CC yet: 4
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is SIGNATURE GLOBAL CITY 81(2) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/623/355/2022/98. Valid to 27 Feb 2027.

The source ↗
What is the possession timeline for SIGNATURE GLOBAL CITY 81(2)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 28 Feb 2026. Its registration runs to 27 Feb 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SIGNATURE GLOBAL CITY 81(2)?From the records · Map pin and road lines, read 6 Sep 2026

SIGNATURE GLOBAL CITY 81(2) is in Sector 81, Gurugram; the site address declared to HARERA is Village Nakhdola,Sector-81, Gurugram. In a straight line it is about 1.4 km from Delhi–Gurugram–SNB RRTS, 3.8 km from Dwarka Expressway and 9.6 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SIGNATURE GLOBAL CITY 81(2)?From the records · HARERA, read 4 Nov 2026

SIGNATURE GLOBAL CITY 81(2) is a Sternal Buildcon project, registered by its company STERNAL BUILDCON PRIVATE LIMITED.

The source ↗Sternal Buildcon's projects and court record

The records

What the registers hold for SIGNATURE GLOBAL CITY 81(2): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/623/355/2022/98: Registered. Valid to 27 Feb 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 7 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 4 Mar 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 5 Mar 2021, building plans 8 Aug 2022.Declared to HARERA, read 29 Oct 2026
The court record of Sternal Buildcon’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 7 OF 2021 lapsed

    Named in this project’s application. Valid to 4 Mar 2026; the register’s note: “Migrated from LC-1763 (80 of 2014)”. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration ends soon

    Valid to 27 Feb 2027. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 49 HARERA files, with the dates we read them
Registration no.
GGM/623/355/2022/98
Registration valid till
27 Feb 2027
Declared possession
28 Feb 2026

Declared by the promoter to HARERA

Land area
2.7899 (Acre) (11,290.32 sq m)
FAR
2.64 proposed of 2.64 permissible
licence
07 of 2021 dated 05.03.2021
Estimated project cost
₹139.57 crore
Cost of land
₹18.83 crore
Layout plan, declared approved (field 5a)
5 Mar 2021
Building plans, declared approved
8 Aug 2022
Construction to start
1 Sept 2022
Completion declared for
28 Feb 2026
Declared inventory · 21 types

Declared inventory — 21 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 192 units · 66.14 sq m carpet · 48 towers · one flat
  • Apartment/Shops/Other Buildings · 56 units · 54.94 sq m carpet · 14 towers · one flat
  • Apartment/Shops/Other Buildings · 72 units · 63.55 sq m carpet · 18 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 64.45 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 58.33 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 58.07 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 54.38 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 4 units · 48.97 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (5 Mar 2021)
  • II. ZONING PLAN APPROVAL — declared: already been obtained (20 Apr 2021)
  • III. SITE LAYOUT PLAN APPROVAL — declared: already been obtained (5 Mar 2021)
  • IV. ENVIRONMENT CLEARANCE APPROVAL BASED ON LATEST APPROVED BUILDING PLAN — declared: already been obtained (3 Mar 2021)
  • V. BUILDING PLAN — declared: already been obtained (8 Aug 2022)
  • VI. COMMERCIAL BUILDING PLAN — declared: already been obtained (24 May 2021)
On file with HARERA · 49 files

On file with HARERA (49)

Plans

Site plan

1 file
Approved Site Plan18 Aug 2022

Layout plan

1 file
Latest Layout Plan21 Jun 2023

Zoning plan

1 file
Zoning Plan18 Aug 2022

Demarcation plan

1 file
Demarcation Plan18 Aug 2022

Building plans

27 files
Building Plan of Plot-Type M-M1717 Oct 2022Building Plan of Plot-Type B-B11,13,17,19,21,2317 Oct 2022Building Plan of Plot-Type C-C1,3,5,7,9,11,13,15,1717 Oct 2022

Floor plans

1 file
Floor Plan15 Oct 2022

Services

Sewerage and drainage

1 file
Storm Water Plan15 Oct 2022

Water supply

1 file
Water Supply Plan15 Oct 2022

Service plans

2 files
Service Estimate15 Oct 2022Service Plans on the Layout18 Aug 2022

Approvals and clearances

DTCP licence

2 files
Change of Developer Order15 Oct 2022Licence Copy with Land Schedule18 Aug 2022

Environment clearance

1 file
Environment Clearance15 Oct 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration15 Oct 2022

Money

Accounts and finance

5 files
CA Certificate for Promoter Equity21 Jun 2023Non-Default Certificate from a CA21 Jun 2023Cash Flow Statement21 Jun 2023

The promoter’s papers

Declarations and affidavits

2 files
Bank Undertaking15 Oct 2022The Promoter’s Declaration on Affidavit18 Aug 2022

HARERA’s orders

HARERA’s orders

1 file
Extension No. 07 of 2026 dated 11.03.202612 Mar 2026

Other filings

Other filings

1 file
Swearage Plan15 Oct 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

7 OF 2021 · STERNAL BUILDCON PVT. LTD. · GURGAON-MANESAR

Licence valid to 4 Mar 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 22 Aug 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

7 OF 2021: 27 parcels, 11.9778 acres in all, in Lakhnola (hadbast 110), tehsil Manesar.

The licence register prints the same licensed area, 11.9778 acres.

  • 13//10/2/23 kanal 7 marla
  • 13//11/13 kanal 16 marla
  • 13//11/24 kanal 4 marla
  • 13//12/11 kanal 4 marla
Show the other 23 parcels
  • 13//15/11 kanal 16 marla
  • 13//15/212 marla
  • 13//167 kanal 12 marla
  • 13//177 kanal
  • 13//206 kanal 18 marla 4 sarsai
  • 13//23/25 kanal 8 marla
  • 13//24/14 kanal
  • 13//25/23 kanal 16 marla
  • rectangle 13, kila 19/3 min1 kanal 11 marla
  • rectangle 13, kila 12/3 min13 marla 1 sarsai
  • rectangle 13, kila 13 min4 kanal 9 marla 8 sarsai
  • rectangle 13, kila 14/1 min2 kanal 15 marla 7 sarsai
  • rectangle 13, kila 14/2 min3 kanal 17 marla
  • rectangle 13, kila 18 min7 kanal 19 marla 5 sarsai
  • rectangle 13, kila 19/1 min1 kanal 14 marla 5 sarsai
  • rectangle 13, kila 12/2 min5 kanal 3 marla 5 sarsai
  • rectangle 13, kila 19/2 min2 kanal 2 marla 5 sarsai
  • 14//154 kanal 8 marla
  • 14//16/13 kanal
  • 14//16/23 kanal
  • 14//24-25/12 kanal 6 marla
  • 14//62 kanal 2 marla
  • 13//171 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Lakhnola (hadbast 110), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 13//10/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan18 Aug 2022

Layout plan

1 file
Latest Layout Plan21 Jun 2023

Building plans

27 files
Building Plan of Plot-Type M-M1717 Oct 2022Building Plan of Plot-Type B-B11,13,17,19,21,2317 Oct 2022Building Plan of Plot-Type C-C1,3,5,7,9,11,13,15,1717 Oct 2022Building Plan of Plot-Type M-M917 Oct 2022Building Plan of Plot-Type M-M1117 Oct 2022Building Plan of Plot-Type C-C2,4,6,8,10,12,14,16,1817 Oct 2022

Floor plans

1 file
Floor Plan15 Oct 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (49 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2075 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Sternal Buildcon

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.