Skip to content

The Ultima (Phase II)

by DLF · Sector 81, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 81, Gurugram1.4 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Registered
20 Sep 2019
Registered by
DLF LIMITEDthe company that filed it, for DLF
Timeline
  1. 16 Jan 2014Building plans approveddeclared to HARERA, read 15 Oct 2026
  2. 20 Sep 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Nov 2020Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside45,903 m² in all, by use
  • Parks and playgrounds19,348 m² · 42%
  • Parking7,462 m² · 16%
  • Roads7,086 m² · 15%
  • Apartment buildings5,389 m² · 12%
  • Other usesas the form names them: Community5,250 m² · 11%
  • Club house1,368 m² · 3%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenWhite WASH/ tiles up-to 2’ above counter & acrylic emulsion paint in balance area
  • Kitchen appliancesModular kitchen with hob, chimney, oven, microwave, dishwasher, refrigerator, washing machine of reputed manufacturer & make
  • LiftsOTIS
  • WardrobesModular wardrobes of standard make in bedrooms (except in S. room)
  • FloorsIPS flooring/ imported marble
  • WallsWhite WASH/ acrylic emulsion paint on POP punning
  • BathroomsEuropean fitting with PVC fittings
  • WindowsMS angle & pressed MS door frames, MS Z-section window frame, flush door shutters

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 81, GurugramSector 81, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS1.4 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.8 km
  • Sohna Elevated Corridor (NH-248A)9.6 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 30 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 18
  • Registered, no OC or CC yet: 12

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is The Ultima (Phase II) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/358/90/2019/52, registered on 20 Sep 2019. Ended 30 Nov 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around The Ultima (Phase II)?From the records · Map pin and road lines, read 6 Sep 2026

The Ultima (Phase II) is in Sector 81, Gurugram; the site address declared to HARERA is Village Lakhnola, Sector 81, Gurugram, Haryana. In a straight line it is about 1.4 km from Delhi–Gurugram–SNB RRTS, 3.8 km from Dwarka Expressway and 9.6 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building The Ultima (Phase II)?From the records · HARERA, read 4 Nov 2026

The Ultima (Phase II) is a DLF project, registered by its company DLF LIMITED.

The source ↗DLF's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for The Ultima (Phase II): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/358/90/2019/52: Registration expired. Ended 30 Nov 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 114 OF 2012 is on the DTCP register: Licence lapsed; the register prints its validity to 14 Nov 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 16 Jan 2014.Declared to HARERA, read 15 Oct 2026
The court record of DLF’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Nov 2020. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 114 OF 2012 lapsed

    Named in this project’s application. Valid to 14 Nov 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
GGM/358/90/2019/52
Registration date
20 Sept 2019
Registration valid till
30 Nov 2020

Declared by the promoter to HARERA

Land area
11.343 (Acre) (45,903.49 sq m)
FAR
the application prints 175, which is not a ratio
licence
61 of 2011 (29-06-2019), 114 of 2012 (14-11-2020)
Estimated project cost
₹733.52 crore
Cost of land
₹64.25 crore
Building plans, declared approved
16 Jan 2014
Statutory approvals, as declared · 2

Statutory approvals, as declared

  • I. LICENCE 61 OF 2011 DATED 30.06.2011 — declared: already been obtained (30 Jun 2011)
  • II. LICENCE 114 OF 2012 DATED 15.11.2012 — declared: already been obtained (15 Nov 2012)
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

1 file
Approved Site Plan26 Jul 2019

Layout plan

1 file
Latest Layout Plan26 Sept 2019

Zoning plan

1 file
Zoning Plan26 Jul 2019

Demarcation plan

1 file
Demarcation Plan26 Jul 2019

Building plans

1 file
Approved Building Plans, Full Set26 Jul 2019

Services

Service plans

1 file
Service Plans on the Layout26 Jul 2019

Approvals and clearances

Occupation certificate (OC)

2 files
OC for tower Tower C, D, F, G Community Building dated 18.19.20193 Aug 2023OC for tower Tower E, H, J, K, L, S & EWS) dated 11.06.183 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule26 Jul 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration26 Jul 2019

Money

Accounts and finance

3 files
Cash Flow Statement26 Jul 2019Non-Default Certificate from a CA26 Jul 2019CA Certificate on the Application’s Figures26 Jul 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit26 Sept 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

61 OF 2011 · DLF New Gurgaon Homes Developers · GURGAON-MANESAR

Licence valid to 29 Jun 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

114 OF 2012 · DLF Ltd. · GURGAON-MANESAR

Licence valid to 14 Nov 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 27 Aug 2019 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

61 OF 2011: 21 parcels, 11.6687 acres in all, in Lakhnola (hadbast 110), tehsil Manesar.

The licence register prints the same licensed area, 11.67 acres.

  • 11//13/1/13 kanal 18 marla
  • 11//13/23 kanal 2 marla
  • 11//148 kanal
  • 11//15/14 kanal 16 marla
Show the other 17 parcels
  • 11//15/21 kanal 12 marla
  • 11//15/31 kanal 12 marla
  • 11//168 kanal
  • 11//17/16 kanal
  • 11//17/2/11 kanal 7 marla
  • 11//17/2/213 marla
  • 11//188 kanal
  • 11//21/2/22 kanal 4 marla
  • 11//228 kanal
  • 11//24/2/117 marla
  • 11//24/2/21 kanal 16 marla
  • 11//25/15 kanal 7 marla
  • 11//6/27 kanal 16 marla
  • 10//10/216 marla
  • 10//20/27 kanal 9 marla
  • rectangle 10, kila 11/1 min 11/2 min4 kanal 2 marla
  • rectangle 11, kila 238 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

114 OF 2012: 23 parcels, 10.5625 acres in all, in Lakhnola (hadbast 110), tehsil Manesar.

The licence register prints the same licensed area, 10.56 acres.

  • 11//19/13 kanal 12 marla
  • 11//19/24 kanal 8 marla
  • 11//20/1/11 kanal
  • 11//20/1/26 kanal 2 marla
Show the other 19 parcels
  • 11//20/2/18 marla
  • 11//20/2/210 marla
  • 11//21/15 kanal 8 marla
  • 11//21/2/18 marla
  • 11//5/13 kanal 7 marla
  • 11//5/21 kanal 2 marla
  • 11//11/27 kanal 4 marla
  • 12//13/26 kanal 18 marla
  • 12//14/13 kanal 11 marla
  • 12//15/212 marla
  • 12//167 kanal 4 marla
  • 12//178 kanal
  • 12//18/11 kanal 4 marla
  • 12//18/25 kanal
  • 12//18/31 kanal 16 marla
  • 12//19/14 kanal
  • 12//22/24 kanal
  • 12//238 kanal
  • 8//2516 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Lakhnola (hadbast 110), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//13/1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No collector rate for a residential flat in Sector 81 in the lists Bhumiq reads, as of 28 Aug 2026. That is not confirmation that none exists.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan26 Jul 2019

Layout plan

1 file
Latest Layout Plan26 Sept 2019

Building plans

1 file
Approved Building Plans, Full Set26 Jul 2019

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/458 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on DLF

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.