Skip to content
New launch

The Marq (Adani The Marq)

by Adani Realty · Sector 102, Gurugram

₹17,500 a sq ftof carpet area

Bhumiq team price list, 16 Sep 2026: an asking rate, not a registry figure.

Possession 31 Dec 2031 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
1,081–1,786 sq ft
In m²about 100–166 m², as declared
Asking rate
₹17,500 a sq ft of carpet
Bhumiq team price list, 16 Sep 2026
Registered by
ADANI M2K REALTORS LLPthe company that filed it, for Adani Realty
Timeline
  1. 20 Jan 2026Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Dec 2031Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

366homes, 1,081 to 1,786 sq ft of carpet area
  • 1,000–1,500 sq ft1,081–1,386 sq ft274
  • 1,500–2,000 sq ft1,786 sq ft92

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 2 rows of a single unit and 73 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.163 acres in all, by use
  • Other uses1.297 acres · 25%
  • Parks and playgrounds1.23 acres · 24%
  • Plots for sale1.007 acres · 20%
  • Pavements0.977 acres · 19%
  • Roads0.651 acres · 13%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per detail shared in the MEP drawing by the consultant
  • KitchenVitrified tile upto 2' above counter & acrylic emulsion paint in balance area
  • Kitchen appliancesISI standard
  • Lifts4 lifts per floor and 1 service lift in FIRE tower
  • FloorsLarge format/luxury vitrified tiles
  • WallsCombination of tiles, acrylic emulsion paint & WASH basin mirror
  • BathroomsCombination of tiles, acrylic emulsion paint & WASH basin mirror
  • WindowsUPVC/aluminum

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is The Marq (Adani The Marq) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/1042/774/2026/14. Valid to 31 Dec 2031.

The source ↗
What is the possession timeline for The Marq (Adani The Marq)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2031. Its registration runs to 31 Dec 2031; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around The Marq (Adani The Marq)?From the records · Map pin and road lines, read 6 Sep 2026

The Marq (Adani The Marq) is in Sector 102, Gurugram; the site address declared to HARERA is Sector 102 & 102a. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What does a home in The Marq (Adani The Marq) cost, and how does that compare nearby?From the records · Bhumiq team price list, 16 Sep 2026

The Bhumiq team's price list has ₹17,500 a sq ft of carpet area (16 Sep 2026). Prices change; ask the developer for its current price list.

What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty

The records

What the registers hold for The Marq (Adani The Marq): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/1042/774/2026/14: Registered. Valid to 31 Dec 2031.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 131 OF 2025 is on the DTCP register, valid to 28 Jul 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 20 Jan 2026.Declared to HARERA, read 29 Oct 2026
The court record of Adani Realty’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 70 HARERA files, with the dates we read them
Registration no.
GGM/1042/774/2026/14
Registration valid till
31 Dec 2031
Declared possession
31 Dec 2031
Asking price (indicative)
₹17,500 / sq ft of carpet area

Bhumiq team price list · as of 16 Sept 2026 · a quoted rate, not a registry figure

Declared by the promoter to HARERA

Land area
5.1625 (Acre) (20,891.9 sq m)
FAR
3.11 proposed of 3.12 permissible
licence
131 of 2025 Dated 29.07.2025 and 24 of 2012 Dated 27.03.2012
Estimated project cost
₹1197.67 crore
Cost of land
₹252.00 crore
Building plans, declared approved
20 Jan 2026
Construction to start
1 Apr 2026
Completion declared for
31 Dec 2031
Declared inventory · 24 types

Declared inventory — 24 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 8 units · 100.4 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 8 units · 104.57 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 2 units · 119.62 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 82 units · 119.62 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 119.75 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 90 units · 119.75 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 46 units · 123.85 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 123.85 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 12

Statutory approvals, as declared

  • I. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (26 Dec 2024)
  • II. FOREST NOC — declared: already been obtained (4 Mar 2024)
  • III. HUDA CONSTRUCTION — declared: already been obtained (23 Dec 2024)
  • IV. EC — declared: already been obtained (21 Jan 2026)
  • V. BR-III — declared: already been obtained (20 Jan 2026)
  • VI. ASSURANCE FOR STORM WATER — declared: already been obtained (23 Dec 2024)
  • VII. ELECTRICAL LOAD — declared: already been obtained (20 Jan 2025)
  • VIII. LICENSE — declared: already been obtained (29 Jul 2025)
  • IX. ASSURANCE FOR WATER SUPPLY — declared: already been obtained (24 Dec 2024)
  • X. ASSURANCE FOR SEWAGE CONNECTION — declared: already been obtained (24 Dec 2024)
  • XI. SERVICE PLANS AND ESTIMATES APPROVAL — declared: applied for but yet to receive (2 Feb 2026)
  • XII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (2 Feb 2026)
On file with HARERA · 70 files

On file with HARERA (70)

Plans

Site plan

2 files
Site Plan & Green Area Diagram24 Feb 2026Approved Site Plan19 Feb 2026

Layout plan

2 files
Approved Revised Zoning Layout24 Feb 2026Latest Layout Plan2 Jan 2026

Zoning plan

1 file
Zoning Plan2 Jan 2026

Demarcation plan

1 file
Demarcation Plan2 Jan 2026

Building plans

12 files
EWS - Sections and Elevation24 Feb 2026Tower B Terrace & Mumty Floor Plan & Area Diagram24 Feb 2026Typical Elevation-2 & 4-Tower A & B24 Feb 2026

Floor plans

20 files
Ground Floor Plan (Combined)24 Feb 2026Basement-1- Floor Plan24 Feb 2026EWS Floor Plan & Area Diagram (2)24 Feb 2026

Services

Sewerage and drainage

2 files
GMDA Storm Water Connection Assurance24 Feb 2026GMDA Sewerage Assurance24 Feb 2026

Water supply

1 file
GMDA Drinking Water Assurance24 Feb 2026

Electricity

1 file
Power Assurance24 Feb 2026

Service plans

2 files
Tower A Service Personnel Floor Plan & Area Diagram24 Feb 2026Service Plans on the Layout2 Jan 2026

Approvals and clearances

DTCP licence

3 files
LOI24 Feb 2026LC IV24 Feb 2026Licence Copy with Land Schedule24 Dec 2025

Environment clearance

1 file
EC Letter24 Feb 2026

Fire safety

1 file
Firefighting Scheme24 Feb 2026

Other NOCs and clearances

2 files
Forest NOC24 Feb 2026AAI NOC24 Feb 2026

Land records

Land records

7 files
Jamabandi24 Feb 2026Non Encubrance Certificate and Infromation to Revenue24 Feb 2026All Sale Deed24 Feb 2026

Sales papers

Allotment and sale agreements

2 files
BBA24 Feb 2026Allotment Letter24 Feb 2026

Money

Accounts and finance

4 files
Service Plan Estimate Submission Receipt24 Feb 2026Non-Default Certificate from a CA24 Feb 2026CA Certificate on the Application’s Figures24 Feb 2026Cash Flow Statement24 Feb 2026

The promoter’s papers

Declarations and affidavits

4 files
The Promoter’s Declaration on Affidavit24 Feb 2026Affidavit - 4(2)(L)(D)24 Feb 2026Icici Bank Undertaking24 Feb 2026NCZ Affidavit24 Feb 2026

Other filings

Other filings

2 files
Approved Phasing24 Feb 2026Project Proponent24 Feb 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

131 OF 2025 · Adani M2K Projects LLP · GURGAON-MANESAR

Licence valid to 28 Jul 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

24 OF 2012 · RADHEY BUILD HOME · GURGAON-MANESAR

Licence valid to 26 Mar 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 Jan 2026 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

131 OF 2025

DTCP’s page showed no land schedule for licence 131 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source

24 OF 2012: 32 parcels, 17.9875 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.

The licence register prints the licensed area as 5.1313 acres.

  • 30//1/14 kanal 4 marla
  • 30//1/11 kanal
  • 30//1/38 marla
  • 30//108 kanal
Show the other 28 parcels
  • 31//14/1/23 kanal 9 marla
  • 31//14/2/217 marla
  • 31//158 kanal
  • 31//168 kanal
  • 31//17/17 kanal 9 marla
  • 31//23/2/22 kanal 12 marla
  • 31//248 kanal
  • 31//258 kanal
  • 31//68 kanal
  • 31//7/11 kanal 4 marla
  • 41//15/1/21 kanal 15 marla
  • 41//15/2/25 marla
  • 41//16/211 marla
  • 41//17/26 kanal 15 marla
  • 41//3/1/25 marla
  • 41//3/2/15 marla
  • 41//3/3/19 marla
  • 41//4/1/11 kanal 18 marla
  • 41//4/2/25 kanal 3 marla
  • 41//58 kanal
  • 41//6/17 kanal 11 marla
  • 42//11/1/23 kanal 1 marla
  • 42//11/24 kanal 12 marla
  • 42//128 kanal
  • 42//138 kanal
  • 42//188 kanal
  • 42//197 kanal 18 marla
  • 42//20/1/12 kanal 7 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 30//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 102, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan & Green Area Diagram24 Feb 2026Approved Site Plan19 Feb 2026

Layout plan

2 files
Approved Revised Zoning Layout24 Feb 2026Latest Layout Plan2 Jan 2026

Building plans

12 files
EWS - Sections and Elevation24 Feb 2026Tower B Terrace & Mumty Floor Plan & Area Diagram24 Feb 2026Typical Elevation-2 & 4-Tower A & B24 Feb 2026Typical Section-A & B-Tower B24 Feb 2026EWS - Sections and Elevation24 Feb 2026Typical Section-A & B-Tower A24 Feb 2026

Floor plans

20 files
Ground Floor Plan (Combined)24 Feb 2026Basement-1- Floor Plan24 Feb 2026EWS Floor Plan & Area Diagram (2)24 Feb 2026Tower-B First Floor Plan & Area Diagram24 Feb 2026Unit RERA Carpet Areas (2)24 Feb 2026Club 2 (Standal One Club) Ground & First Floor Plan & Area Diagram24 Feb 2026

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (70 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3890 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Adani Realty

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

₹17,500/sq ftBook a site visitAsk

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.