Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight line
Registered by
PEERAGE BUILDWELL PRIVATE LIMITEDthe company that filed it, for Peerage Buildwell
Timeline
  1. 20 Sep 2023Layout and building plans approveddeclared to HARERA, read 8 Oct 2026
  2. 30 Sep 2030Possession, as declareddeclared to HARERA, read 8 Oct 2026
  3. 30 Nov 2030Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside16,036 m² in all, by use
  • Apartment buildings8,342 m² · 52%
  • Pavements6,251 m² · 39%
  • Green belts1,442 m² · 9%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts8 no. of lifts
  • FloorsConcrete flooring
  • WallsPlaster/whitewash
  • BathroomsEquivalent to reputed brands
  • WindowsExternal
  • Main doorWooden/aluminium glass/shutter
  • Electrical fittingsReputed brands
  • Water storagePVC tanks/concrete

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is VISTA AVENUE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/886/618/2024/113. Valid to 30 Nov 2030.

The source ↗
What is the possession timeline for VISTA AVENUE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2030. Its registration runs to 30 Nov 2030; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around VISTA AVENUE?From the records · Map pin and road lines, read 6 Sep 2026

VISTA AVENUE is in Sector 89, Gurugram; the site address declared to HARERA is Village-Badha & Hayatpur, Sector-89, Gurugram, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building VISTA AVENUE?From the records · HARERA, read 4 Nov 2026

VISTA AVENUE is a Peerage Buildwell project, registered by its company PEERAGE BUILDWELL PRIVATE LIMITED.

The source ↗Peerage Buildwell's projects and court record

The records

What the registers hold for VISTA AVENUE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/886/618/2024/113: Registered. Valid to 30 Nov 2030.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 47 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 17 Apr 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 20 Sep 2023, building plans 20 Sep 2023.Declared to HARERA, read 8 Oct 2026
The court record of Peerage Buildwell’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 47 OF 2022 ends soon

    Named in this project’s application. Valid to 17 Apr 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 69 HARERA files, with the dates we read them
Registration no.
GGM/886/618/2024/113
Registration valid till
30 Nov 2030
Declared possession
30 Sept 2030

Declared by the promoter to HARERA

Land area
3.9625 (Acre) (16,035.67 sq m)
FAR
the application prints 174.99, which is not a ratio
licence
License No. 47 of 2022 dated 18.04.2022
Estimated project cost
₹186.09 crore
Cost of land
₹12.63 crore
Layout plan, declared approved (field 5a)
20 Sept 2023
Building plans, declared approved
20 Sept 2023
Construction to start
1 Jan 2024
Completion declared for
30 Sept 2030
Declared inventory · 145 types

Declared inventory — 145 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 21 units · 5.76 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 6.78 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 14.31 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 14.59 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 3 units · 17 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 19.32 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 19.06 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 21.46 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 16

Statutory approvals, as declared

  • I. SERVICE ESTIMATES APPROVAL — declared: already been obtained (27 Dec 2023)
  • II. SEWERAGE CONNECTION APPROVAL — declared: already been obtained (18 Jul 2022)
  • III. STORM WATER CONNECTION — declared: already been obtained (14 Jul 2022)
  • IV. ELECTRIFICATION LOAD APPROVAL — declared: already been obtained (18 Nov 2022)
  • V. LICENSE APPROVAL — declared: already been obtained (18 Apr 2022)
  • VI. ZONING PLAN APPROVAL — declared: already been obtained (20 Apr 2022)
  • VII. BUILDING PLAN APPROVAL — declared: already been obtained (20 Sept 2023)
  • VIII. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (15 Mar 2022)
  • IX. FOREST NOC APPROVAL — declared: already been obtained (21 Jan 2022)
  • X. ARAVALLI NOC APPROVAL — declared: already been obtained (27 Jun 2022)
  • XI. WATER SUPPLY NOC — declared: already been obtained (18 Jul 2022)
  • XII. ENVIRONMENT APPROVAL — declared: already been obtained (9 Feb 2023)
  • XIII. FIRE SCHEME APPROVAL — declared: already been obtained (10 Jan 2024)
  • XIV. LOI — declared: already been obtained (4 Jan 2022)
  • XV. ROAD ACCESS — declared: already been obtained (10 Jun 2022)
  • XVI. MINING PERMISSION — declared: already been obtained (22 Sept 2023)
On file with HARERA · 69 files

On file with HARERA (69)

Plans

Site plan

3 files
Superimposed Plan20 Nov 2024Approved Site Plan15 Feb 2024Site Plan20 Oct 2023

Layout plan

1 file
Latest Layout Plan15 Jan 2024

Zoning plan

1 file
Zoning Plan15 Jun 2023

Demarcation plan

1 file
Demarcation Plan26 Feb 2024

Building plans

5 files
Approved Building Plans, Full Set20 Nov 2024Section Plan and Elevation20 Nov 2024Structural Plan20 Nov 2024

Floor plans

8 files
First Floor Plan17 Sept 2024Parking Plan17 Sept 2024Lower Ground Floor Plan17 Sept 2024

Services

Sewerage and drainage

2 files
Storm Water Assurance20 Nov 2024Storm Water15 Jan 2024

Water supply

2 files
Water Supply Assurance20 Nov 2024Water Supply Plan22 Aug 2024

Electricity

3 files
Street Light Plan17 Sept 2024Electricity & Lighting Plan15 Jan 2024Electrical Load Approval20 Dec 2023

Roads

1 file
Roads and Pavement Plan17 Sept 2024

Landscape and green areas

1 file
Landscape Plan17 Sept 2024

Service plans

4 files
Service Plans on the Layout20 Nov 2024Solid Waste Management Plan15 Feb 2024Service Estimates Plan Approval15 Jan 2024Service Estimates15 Jan 2024

Approvals and clearances

DTCP licence

3 files
LOI17 Sept 2024LC-IV17 Sept 2024Licence Copy with Land Schedule15 Jun 2023

Environment clearance

1 file
Environment Clearance Approval20 Oct 2023

Fire safety

4 files
Fire Scheme Plans17 Sept 2024Fire Questioner17 Sept 2024Fire Scheme Approval15 Jan 2024Fire Fighting Service Plan15 Jan 2024

Other NOCs and clearances

6 files
Mining Permission17 Sept 2024Aravalli NOC20 Oct 2023Forest NOC20 Oct 2023

Land records

Land records

9 files
Revenue Record Entry of Licence and Collaboration20 Nov 2024Aks Sizra20 Nov 2024Collaboration Agreement Part 120 Nov 2024

Money

Accounts and finance

8 files
Demand Draft (Vista Avenue)20 Nov 2024Non-Default Certificate from a CA20 Nov 2024CA Certificate on the Application’s Figures20 Nov 2024

The promoter’s papers

Declarations and affidavits

5 files
Bank Undertaking20 Nov 2024Affidavit 4(2)(L)(D)20 Nov 2024Affidavit for Non Applicable NOC20 Nov 2024

HARERA’s orders

HARERA’s orders

1 file
Executed Addendum Agreement Dt. 13.08.202420 Nov 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

47 OF 2022 · Peerage Buildwell Pvt Ltd. · GURGAON-MANESAR

Licence valid to 17 Apr 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 23 Sept 2024 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

47 OF 2022: 8 parcels, 3.9625 acres in all, in Badha (hadbast 113, tehsil Manesar) and Hayatpur (hadbast 114, tehsil Harsaru).

The licence register prints the same licensed area, 3.9625 acres.

  • 10//12/1/24 kanal 5 marlaBadha (113)
  • 10//12/2/23 kanal 14 marlaBadha (113)
  • 10//13/1/13 kanal 6 marlaBadha (113)
  • 10//19/1/11 kanal 13 marlaBadha (113)
Show the other 4 parcels
  • 70//3/2/21 kanal 5 marlaHayatpur (114)
  • 70//4/27 kanal 2 marlaHayatpur (114)
  • 70//56 kanal 7 marlaHayatpur (114)
  • 70//64 kanal 2 marlaHayatpur (114)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Badha (hadbast 113, tehsil Manesar) or Hayatpur (hadbast 114, tehsil Harsaru). The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//12/1/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

3 files
Superimposed Plan20 Nov 2024Approved Site Plan15 Feb 2024Site Plan20 Oct 2023

Layout plan

1 file
Latest Layout Plan15 Jan 2024

Building plans

5 files
Approved Building Plans, Full Set20 Nov 2024Section Plan and Elevation20 Nov 2024Structural Plan20 Nov 2024Elevation and Section Plan17 Sept 2024Building Plan Approval20 Oct 2023

Floor plans

8 files
First Floor Plan17 Sept 2024Parking Plan17 Sept 2024Lower Ground Floor Plan17 Sept 2024Upper Ground Floor Plan17 Sept 2024Second Floor Plan17 Sept 2024Third, Forth Floor Plan17 Sept 2024

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (69 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2525 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Peerage Buildwell

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.