VISTA CENTRE
by Receptive Buildwell · Sector 89, Gurugram
Not on our price list yet
Possession 31 Dec 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight line
- Registered by
- RECEPTIVE BUILDWELL LLPthe company that filed it, for Receptive Buildwell
- 28 Nov 2024Building plans approveddeclared to HARERA, read 8 Oct 2026
- 31 Dec 2032Possession, as declareddeclared to HARERA, read 8 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft285–968 sq ft119
- 1,000–1,500 sq ft1,339 sq ft2
Carpet area per home, as declared to HARERA (read 8 Oct 2026), in sq ft. Left out: 74 rows of a single unit and 51 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings5,071 m² · 53%
- Pavements3,077 m² · 32%
- Green belts1,438 m² · 15%
- Other uses0 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.
- Lifts6 no. of lifts
- FloorsConcrete flooring
- WallsPlaster/whitewash
- BathroomsEquivalent to reputed brands
- WindowsExternal
- Main doorWooden/aluminium glass/shutter
- Electrical fittingsReputed brands
- Water storagePVC tanks/concrete
The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20251.7 km
- Delhi–Gurugram–SNB RRTS4.3 km
- Sohna Elevated Corridor (NH-248A)8.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
M3M SOULITUDE 2No photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 3 Apr 2027 |
SMARTWORLD GEMSNo photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 30 Sep 2025 |
GreenopolisNo photo on file yet | Radha Estates | Same sector | — | — | 31 Dec 2020 |
No photo of the project on file yet | Orris Infrastructure | Same sector | — | — | — |
VISTA CORNERNo photo on file yet | Copious Realtors | Same sector | — | — | 30 Sep 2027 |
No photo of the project on file yet | ATS Real Estate Builders | Same sector | — | — | — |
| Emaar India | Same sector | — | — | 17 Aug 2026 | |
M3M SOULITUDE CENTRALNo photo on file yet | Adhikaansh Realtors Private Limited ,aawam Residency | Same sector | — | — | 31 Jul 2030 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is VISTA CENTRE registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/928/660/2025/31. Valid to 31 Dec 2032.
The source ↗What is the possession timeline for VISTA CENTRE?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around VISTA CENTRE?From the records · Map pin and road lines, read 6 Sep 2026
VISTA CENTRE is in Sector 89, Gurugram; the site address declared to HARERA is Village-Badha , Sector-89,Gurugram, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building VISTA CENTRE?From the records · HARERA, read 4 Nov 2026
VISTA CENTRE is a Receptive Buildwell project, registered by its company RECEPTIVE BUILDWELL LLP.
The source ↗Receptive Buildwell's projects and court recordThe records
What the registers hold for VISTA CENTRE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/928/660/2025/31: Registered. Valid to 31 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 48 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 17 Apr 2027.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: building plans 28 Nov 2024.Declared to HARERA, read 8 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Licence 48 OF 2022 ends soon
Named in this project’s application. Valid to 17 Apr 2027. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 63 HARERA files, with the dates we read them
- Registration no.
- GGM/928/660/2025/31
- Registration valid till
- 31 Dec 2032
- Declared possession
- 31 Dec 2032
Declared by the promoter to HARERA
- Land area
- 2.36875 (Acre) (9,585.99 sq m)
- FAR
- the application prints 177.99, which is not a ratio
- licence
- License No. 48 of 2022 dated 18.04.2022
- Estimated project cost
- ₹112.43 crore
- Cost of land
- ₹7.10 crore
- Building plans, declared approved
- 28 Nov 2024
- Construction to start
- 1 Apr 2025
- Completion declared for
- 31 Dec 2032
Declared inventory · 140 types
Declared inventory — 140 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 2 units · 4.8 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 5.27 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 6 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 6.75 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 7.19 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 5 units · 7.29 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 2 units · 7.5 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 10.03 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 14
Statutory approvals, as declared
- I. ELECTRIFICATION POWER ASSURANCE APPROVAL — declared: already been obtained (17 Jul 2022)
- II. AIRPORT HEIGHT CLEARENCE APPROVAL — declared: already been obtained (15 Mar 2022)
- III. ARAVALI APPROVAL — declared: already been obtained (27 Jun 2022)
- IV. WATER SUPPLY APPROVAL — declared: already been obtained (22 Jun 2022)
- V. ENVIRONMENTAL APPROAVL — declared: already been obtained (5 Dec 2022)
- VI. FOREST NOC — declared: already been obtained (25 Jan 2022)
- VII. STORM WATER CONNECTION — declared: already been obtained (22 Jun 2022)
- VIII. SEWERAGE CONNECTION ASSUARNCE — declared: already been obtained (22 Jun 2022)
- IX. ZOOING APPROVAL — declared: already been obtained (20 Apr 2022)
- X. BUILDING PLAN APPROVAL — declared: already been obtained (28 Nov 2024)
- XI. LOI APPROVAL — declared: already been obtained (4 Jan 2022)
- XII. LICENSE APPROVAL — declared: already been obtained (18 Apr 2022)
- XIII. FIRE SCHEME APPROVAL — declared: already been obtained (18 Feb 2025)
- XIV. SERVICES ESTIMATES APPROVAL — declared: already been obtained (24 Mar 2025)
On file with HARERA · 63 files
On file with HARERA (63)
Plans
Site plan
4 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
2 filesBuilding plans
6 filesFloor plans
6 filesServices
Sewerage and drainage
2 filesWater supply
2 filesRoads
1 fileLandscape and green areas
1 fileService plans
3 filesApprovals and clearances
DTCP licence
3 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
7 filesLand records
Land records
5 filesSales papers
Allotment and sale agreements
3 filesMoney
Accounts and finance
6 filesThe promoter’s papers
Declarations and affidavits
4 filesHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
3 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
48 OF 2022 · Receptive Buildwell LLP · GURGAON-MANESAR
Licence valid to 17 Apr 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Jan 2025 · read 8 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
48 OF 2022: 7 parcels, 2.3687 acres in all, in Badha (hadbast 113), tehsil Manesar.
The licence register prints the same licensed area, 2.3688 acres.
- 10//118 kanal
- 10//12/1/16 marla
- 10//12/2/11 kanal 4 marla
- 10//19/2/11 kanal 7 marla
Show the other 3 parcels
- 10//20/12 kanal
- 10//20/2/15 kanal 2 marla
- 10//21/11 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 10//11.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
4 filesLayout plan
1 fileBuilding plans
6 filesFloor plans
6 filesAmong the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (63 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3249 · read 8 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Receptive Buildwell
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

