Skip to content

VISTA CENTRE

by Receptive Buildwell · Sector 89, Gurugram

Not on our price list yet

Possession 31 Dec 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight line
Carpet area
285–1,339 sq ft
In m²about 26–124 m², as declared
Registered by
RECEPTIVE BUILDWELL LLPthe company that filed it, for Receptive Buildwell
Timeline
  1. 28 Nov 2024Building plans approveddeclared to HARERA, read 8 Oct 2026
  2. 31 Dec 2032Possession, as declareddeclared to HARERA, read 8 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

121homes, 285 to 1,339 sq ft of carpet area
  • Under 1,000 sq ft285–968 sq ft119
  • 1,000–1,500 sq ft1,339 sq ft2

Carpet area per home, as declared to HARERA (read 8 Oct 2026), in sq ft. Left out: 74 rows of a single unit and 51 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside9,586 m² in all, by use
  • Apartment buildings5,071 m² · 53%
  • Pavements3,077 m² · 32%
  • Green belts1,438 m² · 15%
  • Other uses0 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts6 no. of lifts
  • FloorsConcrete flooring
  • WallsPlaster/whitewash
  • BathroomsEquivalent to reputed brands
  • WindowsExternal
  • Main doorWooden/aluminium glass/shutter
  • Electrical fittingsReputed brands
  • Water storagePVC tanks/concrete

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is VISTA CENTRE registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/928/660/2025/31. Valid to 31 Dec 2032.

The source ↗
What is the possession timeline for VISTA CENTRE?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2032. Its registration runs to 31 Dec 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around VISTA CENTRE?From the records · Map pin and road lines, read 6 Sep 2026

VISTA CENTRE is in Sector 89, Gurugram; the site address declared to HARERA is Village-Badha , Sector-89,Gurugram, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building VISTA CENTRE?From the records · HARERA, read 4 Nov 2026

VISTA CENTRE is a Receptive Buildwell project, registered by its company RECEPTIVE BUILDWELL LLP.

The source ↗Receptive Buildwell's projects and court record

The records

What the registers hold for VISTA CENTRE: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/928/660/2025/31: Registered. Valid to 31 Dec 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 48 OF 2022 is on the DTCP register: Licence ends soon; the register prints its validity to 17 Apr 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 28 Nov 2024.Declared to HARERA, read 8 Oct 2026
The court record of Receptive Buildwell’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 48 OF 2022 ends soon

    Named in this project’s application. Valid to 17 Apr 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 63 HARERA files, with the dates we read them
Registration no.
GGM/928/660/2025/31
Registration valid till
31 Dec 2032
Declared possession
31 Dec 2032

Declared by the promoter to HARERA

Land area
2.36875 (Acre) (9,585.99 sq m)
FAR
the application prints 177.99, which is not a ratio
licence
License No. 48 of 2022 dated 18.04.2022
Estimated project cost
₹112.43 crore
Cost of land
₹7.10 crore
Building plans, declared approved
28 Nov 2024
Construction to start
1 Apr 2025
Completion declared for
31 Dec 2032
Declared inventory · 140 types

Declared inventory — 140 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 2 units · 4.8 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 5.27 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 6 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 6.75 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 7.19 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 5 units · 7.29 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 2 units · 7.5 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 10.03 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 14

Statutory approvals, as declared

  • I. ELECTRIFICATION POWER ASSURANCE APPROVAL — declared: already been obtained (17 Jul 2022)
  • II. AIRPORT HEIGHT CLEARENCE APPROVAL — declared: already been obtained (15 Mar 2022)
  • III. ARAVALI APPROVAL — declared: already been obtained (27 Jun 2022)
  • IV. WATER SUPPLY APPROVAL — declared: already been obtained (22 Jun 2022)
  • V. ENVIRONMENTAL APPROAVL — declared: already been obtained (5 Dec 2022)
  • VI. FOREST NOC — declared: already been obtained (25 Jan 2022)
  • VII. STORM WATER CONNECTION — declared: already been obtained (22 Jun 2022)
  • VIII. SEWERAGE CONNECTION ASSUARNCE — declared: already been obtained (22 Jun 2022)
  • IX. ZOOING APPROVAL — declared: already been obtained (20 Apr 2022)
  • X. BUILDING PLAN APPROVAL — declared: already been obtained (28 Nov 2024)
  • XI. LOI APPROVAL — declared: already been obtained (4 Jan 2022)
  • XII. LICENSE APPROVAL — declared: already been obtained (18 Apr 2022)
  • XIII. FIRE SCHEME APPROVAL — declared: already been obtained (18 Feb 2025)
  • XIV. SERVICES ESTIMATES APPROVAL — declared: already been obtained (24 Mar 2025)
On file with HARERA · 63 files

On file with HARERA (63)

Plans

Site plan

4 files
Site Plan & Area with Services31 Mar 2025Site Plan31 Mar 2025Superimposed Plan24 Jan 2025Approved Site Plan18 Dec 2024

Layout plan

1 file
Latest Layout Plan18 Dec 2024

Zoning plan

1 file
Zoning Plan31 Mar 2025

Demarcation plan

2 files
Superimposed Demarcation Plan31 Mar 2025Demarcation Plan18 Dec 2024

Building plans

6 files
Building Plan Approval (BR-III)31 Mar 2025Section Plan31 Mar 2025Terrace Floor Plan31 Mar 2025

Floor plans

6 files
Second Basement Plan31 Mar 2025First Basement Plan31 Mar 2025Third Floor Plan31 Mar 2025

Services

Sewerage and drainage

2 files
Service Plan-Sewerage Layout31 Mar 2025Storm Water Drainage18 Dec 2024

Water supply

2 files
Water Supply Approval31 Mar 2025Service Plan-Water Layout31 Mar 2025

Roads

1 file
Service Plan-Road Layout31 Mar 2025

Landscape and green areas

1 file
Landscape Plan18 Dec 2024

Service plans

3 files
Service Estimate Approval31 Mar 2025Service Plan Letter24 Jan 2025Service Plans on the Layout21 Jan 2025

Approvals and clearances

DTCP licence

3 files
LC-IV31 Mar 2025LOI31 Mar 2025Licence Copy with Land Schedule31 Mar 2025

Environment clearance

1 file
Environment Clearance Approval18 Dec 2024

Fire safety

1 file
Fire Scheme Approval31 Mar 2025

Other NOCs and clearances

7 files
Airport Height Clearance31 Mar 2025Forest NOC31 Mar 2025Electrical Load Permission31 Mar 2025

Land records

Land records

5 files
Sale Deed31 Mar 2025Shajra31 Mar 2025Non Encumbrance Letter31 Mar 2025

Sales papers

Allotment and sale agreements

3 files
Allotment Letter31 Mar 2025Agreement for Sale31 Mar 2025Inventory Certificate31 Dec 2024

Money

Accounts and finance

6 files
Cash Flow Statement31 Mar 2025Non-Default Certificate from a CA31 Mar 2025Quarterly Sources of Fund and Fund Flow29 Jan 2025

The promoter’s papers

Declarations and affidavits

4 files
Affidavit NOC for Tree Cutting Natural Conversation Powerline Shifting31 Mar 2025Affidavit 4 2 L D31 Mar 2025Bank Undertaking31 Mar 2025The Promoter’s Declaration on Affidavit31 Mar 2025

HARERA’s orders

HARERA’s orders

1 file
Addendum to the Registration Certificate - Revision in Building Plans27 Aug 2026

Other filings

Other filings

3 files
Jambandi31 Mar 2025Lgf Plan31 Mar 2025Upper Ground & Mezz Plan31 Mar 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

48 OF 2022 · Receptive Buildwell LLP · GURGAON-MANESAR

Licence valid to 17 Apr 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Jan 2025 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

48 OF 2022: 7 parcels, 2.3687 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 2.3688 acres.

  • 10//118 kanal
  • 10//12/1/16 marla
  • 10//12/2/11 kanal 4 marla
  • 10//19/2/11 kanal 7 marla
Show the other 3 parcels
  • 10//20/12 kanal
  • 10//20/2/15 kanal 2 marla
  • 10//21/11 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 10//11.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Site Plan & Area with Services31 Mar 2025Site Plan31 Mar 2025Superimposed Plan24 Jan 2025Approved Site Plan18 Dec 2024

Layout plan

1 file
Latest Layout Plan18 Dec 2024

Building plans

6 files
Building Plan Approval (BR-III)31 Mar 2025Section Plan31 Mar 2025Terrace Floor Plan31 Mar 2025Elevation Plan31 Mar 2025Structure Plan29 Jan 2025Approved Building Plans, Full Set18 Dec 2024

Floor plans

6 files
Second Basement Plan31 Mar 2025First Basement Plan31 Mar 2025Third Floor Plan31 Mar 2025Second Floor Plan31 Mar 2025Fisrt Floor Plan31 Mar 2025Parking Plan18 Dec 2024

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (63 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3249 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Receptive Buildwell

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.