VISTA CORNER

by Copious Realtors · Sector 89, Gurugram

Not on our price list yet

Possession 30 Sep 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 89, Gurugram1.7 km from Dwarka Expressway, in a straight line
Carpet area
about 558 sq ft
In m²about 51.9 m², the average flat, as declared
Registered by
COPIOUS REALTORS PRIVATE LIMITEDthe company that filed it, for Copious Realtors
Timeline
  1. 2 Sep 2022Building plans approveddeclared to HARERA, read 8 Oct 2026
  2. 30 Sep 2027Possession, as declareddeclared to HARERA, read 8 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,302 m² in all, by use
  • Apartment buildings7,365 m² · 48%
  • Pavements6,107 m² · 40%
  • Green belts1,830 m² · 12%

The land-use table of the HARERA application, declared to HARERA, read 8 Oct 2026. The share is of the land the table itemises.

In each home
  • Lifts8 no. of lifts
  • FloorsConcrete flooring
  • WallsPlaster / whitewash
  • BathroomsEquivalent to reputed brands
  • WindowsExternal
  • Main doorWooden/aluminium/glass/shutter
  • Electrical fittingsReputed brands
  • Water storagePVC tanks/concrete

The developer’s specifications in the HARERA application, declared to HARERA, read 8 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 89, GurugramSector 89, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.7 km
  • Delhi–Gurugram–SNB RRTS4.3 km
  • Sohna Elevated Corridor (NH-248A)8.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is VISTA CORNER registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/634/366/2022/109. Valid to 30 Sep 2027.

The source ↗
What is the possession timeline for VISTA CORNER?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2027. Its registration runs to 30 Sep 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around VISTA CORNER?From the records · Map pin and road lines, read 6 Sep 2026

VISTA CORNER is in Sector 89, Gurugram; the site address declared to HARERA is Village- Badha, Sector-89, Gurugram, Haryana. In a straight line it is about 1.7 km from Dwarka Expressway, 4.3 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building VISTA CORNER?From the records · HARERA, read 4 Nov 2026

VISTA CORNER is a Copious Realtors project, registered by its company COPIOUS REALTORS PRIVATE LIMITED.

The source ↗Copious Realtors's projects and court record

The records

What the registers hold for VISTA CORNER: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/634/366/2022/109: Registered. Valid to 30 Sep 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 93 OF 2021 is on the DTCP register: Licence ends soon; the register prints its validity to 11 Nov 2026.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 2 Sep 2022.Declared to HARERA, read 8 Oct 2026
The court record of Copious Realtors’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 93 OF 2021 ends soon

    Named in this project’s application. Valid to 11 Nov 2026. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 34 HARERA files, with the dates we read them
Registration no.
GGM/634/366/2022/109
Registration valid till
30 Sept 2027
Declared possession
30 Sept 2027

Declared by the promoter to HARERA

Land area
3.78125 (Acre) (15,302.18 sq m)
FAR
the application prints 174.92, which is not a ratio
licence
License No 93 of 2021 dated 12.11.2021
Estimated project cost
₹174.93 crore
Cost of land
₹27.68 crore
Building plans, declared approved
2 Sept 2022
Construction to start
1 Oct 2022
Completion declared for
30 Sept 2027
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 395 units · 20,484 sq m carpet · 1 tower · total for 395 flats, about 51.9 m² each
Statutory approvals, as declared · 13

Statutory approvals, as declared

  • I. SERVICE ESTIMATE APPROVAL — declared: already been obtained (27 Sept 2022)
  • II. SEWAGE DISPOSAL — declared: already been obtained (21 Mar 2022)
  • III. STORM WATER DRAINAGE — declared: already been obtained (21 Mar 2022)
  • IV. ELECTRIFICATION LOAD APPROVAL — declared: already been obtained (22 Mar 2022)
  • V. LICENSE APPROVAL — declared: already been obtained (12 Nov 2021)
  • VI. ZONING PLAN — declared: already been obtained (16 Nov 2021)
  • VII. BUILDING PLAN — declared: already been obtained (2 Sept 2022)
  • VIII. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (23 Mar 2022)
  • IX. FOREST NOC — declared: already been obtained (10 Sept 2021)
  • X. ARAVALLI NOC — declared: already been obtained (11 Mar 2022)
  • XI. WATER SUPPLY — declared: already been obtained (13 Jan 2022)
  • XII. ENVIRONMENT APPROVAL — declared: already been obtained (25 Sept 2022)
  • XIII. FIRE SCHEME APPROVAL — declared: applied for but yet to receive (27 Sept 2022)
On file with HARERA · 34 files

On file with HARERA (34)

Plans

Site plan

1 file
Approved Site Plan23 Sept 2022

Layout plan

1 file
Latest Layout Plan27 Sept 2022

Zoning plan

1 file
Zoning Plan23 Sept 2022

Demarcation plan

2 files
Superimposed Demarcation Plan21 Dec 2022Demarcation Plan24 Sept 2022

Building plans

7 files
Structure Drawing 121 Dec 2022Section & Elevation21 Dec 2022Structure Drawing 221 Dec 2022

Floor plans

1 file
Parking Plan21 Dec 2022

Services

Sewerage and drainage

4 files
Drainage Layout21 Dec 2022Sewerage Plan21 Dec 2022Sewage Disposal24 Sept 2022Storm Water Drainage24 Sept 2022

Water supply

2 files
Water Supply Plan21 Dec 2022Water Supply24 Sept 2022

Electricity

1 file
Electrical Load Approval24 Sept 2022

Roads

1 file
Road & Pavement Plan21 Dec 2022

Service plans

3 files
Service Plan and Estimates Approval Letter21 Dec 2022Approved Service Estimates21 Dec 2022Service Plans on the Layout27 Sept 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule23 Sept 2022

Environment clearance

1 file
Environment Approval26 Sept 2022

Fire safety

1 file
Fire Fighting Layout21 Dec 2022

Other NOCs and clearances

2 files
Airport Height Clearance24 Sept 2022Forest NOC24 Sept 2022

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration23 Sept 2022

Money

Accounts and finance

3 files
Annual Report27 Sept 2022Cash Flow Statement24 Sept 2022Non-Default Certificate from a CA23 Sept 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit23 Sept 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

93 OF 2021 · COPIOUS REALTORS PRIVATE LIMITED · GURGAON-MANESAR

Licence valid to 11 Nov 2026

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 28 Sept 2022 · read 8 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

93 OF 2021: 9 parcels, 3.7813 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 3.7813 acres.

  • 9//14/23 kanal 6 marla
  • 9//158 kanal
  • 9//16/12 kanal
  • 9//16/23 kanal 1 marla
Show the other 5 parcels
  • 9//16/32 kanal 16 marla
  • 9//17/11 kanal 10 marla
  • 9//24/24 kanal 3 marla
  • 9//25/1/14 kanal 7 marla
  • 9//25/2/11 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 9//14/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan23 Sept 2022

Layout plan

1 file
Latest Layout Plan27 Sept 2022

Building plans

7 files
Structure Drawing 121 Dec 2022Section & Elevation21 Dec 2022Structure Drawing 221 Dec 2022Structure Drawing 321 Dec 2022Structure Drawing 421 Dec 2022Building Plan Approval24 Sept 2022Approved Building Plans, Full Set23 Sept 2022

Floor plans

1 file
Parking Plan21 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 8 Oct 2026 (34 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2111 · read 8 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Copious Realtors

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.