Skip to content

102 EDEN ESTATE III

by BPTP · Sector 102, Gurugram

Not on our price list yet

Possession 27 Nov 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 102, Gurugram0.7 km from Dwarka Expressway, in a straight line
Registered by
BPTP LIMITEDthe company that filed it, for BPTP
Timeline
  1. 28 Nov 2024Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 27 Nov 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside9.903 acres in all, by use
  • Plots for sale6.56 acres · 66%
  • Roads1.728 acres · 17%
  • Other usesas the form names them: Primary school, Taxi stand, UD0.906 acres · 9%
  • Parks and playgrounds0.474 acres · 5%
  • Sewage and waste treatment0.166 acres · 2%
  • Electricity sub-station0.069 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 102, GurugramSector 102, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.7 km
  • Delhi–Gurugram–SNB RRTS5.8 km
  • Sohna Elevated Corridor (NH-248A)7.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 6
  • Registered, no OC or CC yet: 10
  • Other register states: 5

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is 102 EDEN ESTATE III registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/940/672/2025/43. Valid to 27 Nov 2029.

The source ↗
What is the possession timeline for 102 EDEN ESTATE III?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 27 Nov 2029. Its registration runs to 27 Nov 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around 102 EDEN ESTATE III?From the records · Map pin and road lines, read 6 Sep 2026

102 EDEN ESTATE III is in Sector 102, Gurugram; the site address declared to HARERA is Sector 102 Gurugram. In a straight line it is about 0.7 km from Dwarka Expressway, 5.8 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 102 EDEN ESTATE III?From the records · HARERA, read 3 Nov 2026

102 EDEN ESTATE III is a BPTP project, registered by its company BPTP LIMITED.

The source ↗BPTP's projects and court record

The records

What the registers hold for 102 EDEN ESTATE III: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/940/672/2025/43: Registered. Valid to 27 Nov 2029.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 165 OF 2024 is on the DTCP register, valid to 27 Nov 2029.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 28 Nov 2024.Declared to HARERA, read 29 Oct 2026
The court record of BPTP’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 50 HARERA files, with the dates we read them
Registration no.
GGM/940/672/2025/43
Registration valid till
27 Nov 2029
Declared possession
27 Nov 2029

Declared by the promoter to HARERA

Land area
9.903 (Acre) (40,076.02 sq m)
FAR
1 proposed of 1 permissible
licence
License no 165 of 2024
Estimated project cost
₹68.11 crore
Cost of land
₹20.27 crore
Layout plan, declared approved (field 5a)
28 Nov 2024
Construction to start
2 Apr 2025
Completion declared for
27 Nov 2029
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (24 May 2024)
  • II. LICENSE NO 165 OF 2024 — declared: already been obtained (28 Nov 2024)
  • III. LAYOUT APPROVAL — declared: already been obtained (28 Nov 2024)
  • IV. TOR RECEIVED FOR ADDITIONAL LAND OF 9.903 ACRES — declared: already been obtained (24 Sept 2024)
  • V. ARAVALI NOC — declared: already been obtained (27 Aug 2024)
  • VI. PERMISSION FOR ROAD ACCESS — declared: already been obtained (7 Nov 2024)
  • VII. WATER SUPPLY ASSURANCE — declared: already been obtained (4 Dec 2024)
  • VIII. STORM WATER DRAINAGE ASSURANCE — declared: already been obtained (4 Nov 2024)
  • IX. SEWEAGE DISPOSAL ASSURANCE — declared: already been obtained (10 Dec 2024)
  • X. ELECTRICAL LOAD ASSURANCE — declared: already been obtained (3 Dec 2024)
  • XI. SERVICES ESTIMATES — declared: applied for but yet to receive (5 Dec 2024)
On file with HARERA · 50 files

On file with HARERA (50)

Plans

Site plan

1 file
Approved Site Plan3 Dec 2024

Layout plan

1 file
Latest Layout Plan18 Jun 2025

Zoning plan

2 files
Zoning Plan18 Jun 2025Zoning Approval Letter24 Apr 2025

Demarcation plan

1 file
Demarcation Plan24 Apr 2025

Services

Sewerage and drainage

6 files
Sewerage Plan18 Jun 2025Storm Water Plan18 Jun 2025Storm Connection Assurance24 Apr 2025

Water supply

3 files
Water Supply Layout18 Jun 2025Water Supply24 Apr 2025Water Supply Assurance24 Apr 2025

Electricity

2 files
Power Line Shifting24 Apr 2025Assurance Certification of DHBVN, Sector-102-102A, Gurugram24 Apr 2025

Roads

3 files
Road Plan18 Jun 2025Road Access24 Apr 2025Road Layout24 Apr 2025

Service plans

1 file
Ce Report for Service Estimates24 Apr 2025

Approvals and clearances

DTCP licence

2 files
LOI24 Apr 2025Licence Copy with Land Schedule3 Dec 2024

Environment clearance

1 file
EC Minutes Approval Seac18 Jun 2025

Other NOCs and clearances

4 files
NOC Forest -124 Apr 2025Wild Life Clearance24 Apr 2025Aravali NOC24 Apr 2025NOC Forest -224 Apr 2025

Land records

Land records

8 files
Title Search- Part 318 Jun 2025Ak-Shijra18 Jun 2025Collaboration Agreement18 Jun 2025

Sales papers

Allotment and sale agreements

2 files
BBA18 Jun 2025Allotment Letter18 Jun 2025

Money

Accounts and finance

5 files
CA Certificate Cost Incurred24 Apr 2025CA Certificate Cost and Inventory24 Apr 2025Cash Flow Statement24 Apr 2025

Timeline and progress

Construction schedule

1 file
PERT Chart18 Jun 2025

The promoter’s papers

Declarations and affidavits

4 files
The Promoter’s Declaration on Affidavit18 Jun 2025Forest Land Undertaking24 Apr 2025Tree Cutting Affidavit24 Apr 2025Bank Undertaking24 Apr 2025

Company papers

1 file
Board Resolution Account Opening24 Apr 2025

Other filings

Other filings

2 files
Legal Capacity Letter18 Jun 2025Lci V and B24 Apr 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

165 OF 2024 · Countrywide Promoters Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 27 Nov 2029

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Dec 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

165 OF 2024

DTCP’s page showed no land schedule for licence 165 OF 2024 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan3 Dec 2024

Layout plan

1 file
Latest Layout Plan18 Jun 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (50 in all), none is a building plan, a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3222 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on BPTP

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.