Skip to content

114 Avenue

by VSR Infratech · Sector 114, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 114, Gurugram1.8 km from Dwarka Expressway, in a straight line
Carpet area
about 659 sq ft
In m²about 61.2 m², the average flat, as declared
Land
12011.050 (Sqr/mtrs)
Registered
24 Sep 2019
Registered by
VSR INFRATECH PRIVATE LIMITEDthe company that filed it, for VSR Infratech
Timeline
  1. 22 Jul 2011Layout plan approveddeclared to HARERA, read 29 Oct 2026
  2. 20 Jul 2016Building plans approveddeclared to HARERA, read 29 Oct 2026
  3. 24 Sep 2019Registered with HARERAHARERA, read 3 Nov 2026
  4. 31 Dec 2020Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside12,011 m² in all, by use
  • Apartment buildings4,691 m² · 39%
  • Pavements3,435 m² · 29%
  • Green belts1,689 m² · 14%
  • Roads1,008 m² · 8%
  • Parking888 m² · 7%
  • Other uses258 m² · 2%
  • Parks and playgrounds42 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningYes
  • LiftsYes
  • FloorsYes
  • WallsYes
  • WindowsYes
  • Electrical fittingsYes

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 114, GurugramSector 114, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 2 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is 114 Avenue registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/359/91/2019/53, registered on 24 Sep 2019. Ended 31 Dec 2020. The register shows it as: Registration expired.

The source ↗
How is the connectivity around 114 Avenue?From the records · Map pin and road lines, read 6 Sep 2026

114 Avenue is in Sector 114, Gurugram; the site address declared to HARERA is Sector-114, Gurgaon-Bajghera Road, Tehsil- Gurugram, District- Gurugram. In a straight line it is about 1.8 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building 114 Avenue?From the records · HARERA, read 3 Nov 2026

114 Avenue is a VSR Infratech project, registered by its company VSR INFRATECH PRIVATE LIMITED.

The source ↗VSR Infratech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for 114 Avenue: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/359/91/2019/53: Registration expired. Ended 31 Dec 2020.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 72 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 20 Jul 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 22 Jul 2011, building plans 20 Jul 2016.Declared to HARERA, read 29 Oct 2026
The court record of VSR Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Dec 2020. HARERA Gurugram, read 3 Nov 2026. Source

  • Red flag: Licence 72 OF 2011 lapsed

    Named in this project’s application. Valid to 20 Jul 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 22 HARERA files, with the dates we read them
Registration no.
GGM/359/91/2019/53
Registration date
24 Sept 2019
Registration valid till
31 Dec 2020

Declared by the promoter to HARERA

Land area
12011.050 (Sqr/mtrs)
FAR
the application prints 175, which is not a ratio
licence
72 OF 2011(20-07-2019)
Estimated project cost
₹196.17 crore
Cost of land
₹21.97 crore
Layout plan, declared approved (field 5a)
22 Jul 2011
Building plans, declared approved
20 Jul 2016
Declared inventory · 5 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type HYPER · 55 units · 3,485.38 sq m carpet · total for 55 flats, about 63.4 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type RETAILS · 205 units · 10,855.9 sq m carpet · total for 205 flats, about 53 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type FOOD COURT · 10 units · 1,363.49 sq m carpet · total for 10 flats, about 136.3 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE · 68 units · 3,283.21 sq m carpet · total for 68 flats, about 48.3 m² each
  • APARTMENT/SHOPS/OTHER BUILDINGS Type SERVICE APPT. · 120 units · 9,032.08 sq m carpet · total for 120 flats, about 75.3 m² each
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. ZONNING — declared: already been obtained (22 Jul 2011)
  • II. ENVIRONMENTAL CLEARANCE — declared: already been obtained (28 May 2013)
  • III. ARAVALI CLEARANCE THROUGH DC — declared: already been obtained (30 Jan 2013)
  • IV. FOREST CLREANCE — declared: already been obtained (9 Aug 2011)
  • V. ELECTRICITY ASSURANCE FOR OPERATIONAL PHASE — declared: already been obtained (17 May 2013)
  • VI. CONSENT TO ESTABLISH FOR POLLUTION — declared: already been obtained (24 Jul 2016)
  • VII. SANCTION OF FIRE PLAN — declared: already been obtained (3 Sept 2012)
  • VIII. CLEARANCE FROM MINING DEPARTMENTS — declared: already been obtained (31 Jan 2012)
  • IX. HEIGHT CLEARANCE(N.O.C) FROM-AAI — declared: already been obtained (12 Jan 2012)
  • X. SANCTION OF BUILDING PLAN — declared: already been obtained (12 Jan 2012)
  • XI. SERVICE ESTIMATE — declared: applied for but yet to receive (11 May 2012)
On file with HARERA · 22 files

On file with HARERA (22)

Plans

Site plan

1 file
Approved Site Plan10 May 2019

Layout plan

1 file
Latest Layout Plan14 May 2019

Zoning plan

1 file
Zoning Plan21 Aug 2019

Demarcation plan

1 file
Demarcation Plan21 Aug 2019

Building plans

2 files
Sections21 Aug 2019Approved Building Plans, Full Set10 May 2019

Floor plans

2 files
Ground Floor21 Aug 2019Basement21 Aug 2019

Services

Service plans

1 file
Service Plans on the Layout21 Aug 2019

Approvals and clearances

Occupation certificate (OC)

2 files
Occupation Certificate18 Jun 2024Occupation Certificate18 Jun 2024

DTCP licence

1 file
Licence Copy with Land Schedule10 May 2019

Money

Accounts and finance

3 files
Non-Default Certificate from a CA21 Aug 2019CA Certificate on the Application’s Figures14 May 2019Cash Flow Statement10 May 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit10 May 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 13 OF 2020 DATED- 05.10.202017 Apr 2021

Other filings

Other filings

5 files
First21 Aug 2019Seconde to21 Aug 2019Toilet21 Aug 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

72 OF 2011 · AMD Estates & Developers (P) · GURGAON-MANESAR

Licence valid to 20 Jul 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 14 May 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

72 OF 2011: 6 parcels, 2.9688 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 2.97 acres.

  • 15//135 kanal 10 marla
  • 15//14/117 marla
  • 15//187 marla
  • 15//25 kanal 10 marla
Show the other 2 parcels
  • 15//7/32 kanal 18 marla
  • 15//88 kanal 13 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 15//13.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,24,800 per sq yd

this sector, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan10 May 2019

Layout plan

1 file
Latest Layout Plan14 May 2019

Building plans

2 files
Sections21 Aug 2019Approved Building Plans, Full Set10 May 2019

Floor plans

2 files
Ground Floor21 Aug 2019Basement21 Aug 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (22 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/538 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on VSR Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.