Skip to content

Nimai Place

by YB Builders · Sector 114, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 114, Gurugram1.8 km from Dwarka Expressway, in a straight line
Carpet area
about 607 sq ft
In m²about 56.3 m², the average flat, as declared
Registered
13 Jul 2018
Registered by
Y B BUILDERS PVT LTDthe company that filed it, for YB Builders
Timeline
  1. 13 Jul 2018Registered with HARERAHARERA, read 3 Nov 2026
  2. 31 Mar 2023Registration valid toHARERA, read 3 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside12,192 m² in all, by use
  • Apartment buildings3,704 m² · 30%
  • Green belts3,003 m² · 25%
  • Roads2,500 m² · 21%
  • Parking1,995 m² · 16%
  • Pavements940 m² · 8%
  • Electricity sub-station50 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningCarrier/daikin
  • Kitchen appliancesGood ISI
  • LiftsJohnson
  • WardrobesModular
  • FloorsIn comman area/corridor granite marble, in stair CASE KOTA stone and service area vitrified & glaze tiles (ISI MARK)
  • WallsPlaster
  • BathroomsISI make
  • WindowsGlass (saint gobain/MICO good ISI)

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 114, GurugramSector 114, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Nimai Place registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/275/2018/07, registered on 13 Jul 2018. Ended 31 Mar 2023. The register shows it as: Registration expired.

The source ↗
How is the connectivity around Nimai Place?From the records · Map pin and road lines, read 6 Sep 2026

Nimai Place is in Sector 114, Gurugram; the site address declared to HARERA is Village- Bajghera, Sector- 114, Gurugram. In a straight line it is about 1.8 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Nimai Place?From the records · HARERA, read 3 Nov 2026

Nimai Place is a YB Builders project, registered by its company Y B BUILDERS PVT LTD.

The source ↗YB Builders's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for Nimai Place: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/275/2018/07: Registration expired. Ended 31 Mar 2023.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 126 OF 2012 is on the DTCP register, valid to 19 Dec 2028.DTCP, read 3 Nov 2026
The court record of YB Builders’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 31 Mar 2023. HARERA Gurugram, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 15 HARERA files, with the dates we read them
Registration no.
GGM/275/2018/07
Registration date
13 Jul 2018
Registration valid till
31 Mar 2023

Declared by the promoter to HARERA

Land area
3.0125 (Acre) (12,191.15 sq m)
FAR
the application prints 175, which is not a ratio
licence
126 of 2012
Estimated project cost
₹160.00 crore
Cost of land
₹21.04 crore
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type COMMERCIAL · 441 units · 24,848.589 sq m carpet · total for 441 flats, about 56.3 m² each
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. FOREST NOC — declared: already been obtained (10 Dec 2013)
  • II. AIRPORT HEIGHT CLEARANCE — declared: already been obtained (22 Jul 2013)
  • III. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (13 May 2013)
  • IV. ENVIRONMENT CLEARANCE — declared: already been obtained (24 Dec 2013)
  • V. CONSENT TO ESTABLISH — declared: already been obtained (4 Apr 2018)
On file with HARERA · 15 files

On file with HARERA (15)

Plans

Site plan

1 file
Approved Site Plan5 Mar 2019

Layout plan

1 file
Latest Layout Plan5 Mar 2019

Zoning plan

1 file
Zoning Plan5 Mar 2019

Demarcation plan

1 file
Demarcation Plan5 Mar 2019

Building plans

1 file
Approved Building Plans, Full Set25 Nov 2019

Services

Service plans

1 file
Service Plans on the Layout25 Nov 2019

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded8 Aug 2023OC uploaded8 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule5 Mar 2019

Money

Accounts and finance

3 files
Cash Flow Statement5 Mar 2019CA Certificate on the Application’s Figures5 Mar 2019Non-Default Certificate from a CA5 Mar 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit5 Mar 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 07 of 2019 DATED: 18.11.201930 May 2020

Other filings

Other filings

1 file
Project Continuation- RC/REP/HARERA/GGM/07 of 2018/7(3)/2022/09 Dated 28.09.202224 Apr 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

126 OF 2012 · Y.B. Builders Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 19 Dec 2028

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

126 OF 2012: 5 parcels, 3.0125 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 3.01 acres.

  • 23//16/25 kanal 13 marla
  • 23//17/26 kanal 7 marla
  • 23//18/26 kanal 2 marla
  • 23//25/118 marla
Show the other 1 parcel
  • 22//20/25 kanal 2 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 23//16/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,24,800 per sq yd

this sector, collector rates effective 1 Apr 2026, Gurugram tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan5 Mar 2019

Layout plan

1 file
Latest Layout Plan5 Mar 2019

Building plans

1 file
Approved Building Plans, Full Set25 Nov 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (15 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/148 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on YB Builders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.