Skip to content

EMAAR BUSINESS DISTRICT 114 NXT

by Emaar India · Sector 114, Gurugram

Not on our price list yet

Possession 23 Aug 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 114, Gurugram1.8 km from Dwarka Expressway, in a straight line
Registered by
EMAAR INDIA LIMITEDthe company that filed it, for Emaar India
Timeline
  1. 25 Aug 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 23 Aug 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside11.4 acres in all, by use
  • Roads4.312 acres · 38%
  • Plots for sale3.989 acres · 35%
  • Green belts1.746 acres · 15%
  • Parking1.334 acres · 12%
  • Other usesas the form names them: Toilet, STP (sewage treatment plant)0.018 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 114, GurugramSector 114, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20251.8 km
  • Delhi–Gurugram–SNB RRTS6.3 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 14
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is EMAAR BUSINESS DISTRICT 114 NXT registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/691/423/2023/35. Valid to 23 Aug 2027.

The source ↗
What is the possession timeline for EMAAR BUSINESS DISTRICT 114 NXT?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 23 Aug 2027. Its registration runs to 23 Aug 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around EMAAR BUSINESS DISTRICT 114 NXT?From the records · Map pin and road lines, read 6 Sep 2026

EMAAR BUSINESS DISTRICT 114 NXT is in Sector 114, Gurugram; the site address declared to HARERA is Sector 114, Gurugram. In a straight line it is about 1.8 km from Dwarka Expressway, 6.3 km from Delhi–Gurugram–SNB RRTS and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building EMAAR BUSINESS DISTRICT 114 NXT?From the records · HARERA, read 4 Nov 2026

EMAAR BUSINESS DISTRICT 114 NXT is a Emaar India project, registered by its company EMAAR INDIA LIMITED.

The source ↗Emaar India's projects and court record

The records

What the registers hold for EMAAR BUSINESS DISTRICT 114 NXT: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/691/423/2023/35: Registered. Valid to 23 Aug 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 130 OF 2022 is on the DTCP register, valid to 23 Aug 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Aug 2022, building plans 25 Aug 2022.Declared to HARERA, read 29 Oct 2026
The court record of Emaar India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 42 HARERA files, with the dates we read them
Registration no.
GGM/691/423/2023/35
Registration valid till
23 Aug 2027
Declared possession
23 Aug 2027

Declared by the promoter to HARERA

Land area
11.40 (Acre) (46,134.16 sq m)
FAR
1.5 proposed of 1.5 permissible
licence
130 of 2022
Estimated project cost
₹197.52 crore
Cost of land
₹65.50 crore
Layout plan, declared approved (field 5a)
25 Aug 2022
Building plans, declared approved
25 Aug 2022
Construction to start
24 Aug 2022
Completion declared for
23 Aug 2027
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. LOI — declared: already been obtained (6 May 2022)
  • II. FOREST NOC — declared: already been obtained (17 Dec 2021)
  • III. LICENSE 130 OF 2022 — declared: already been obtained (24 Aug 2022)
  • IV. ASSURANCE OF STORM WATER AND SEWERAGE CONNECTION — declared: already been obtained (29 Aug 2022)
  • V. FOREST NOC — declared: already been obtained (18 Jul 2022)
On file with HARERA · 42 files

On file with HARERA (42)

Plans

Site plan

1 file
Approved Site Plan30 Aug 2022

Layout plan

1 file
Latest Layout Plan30 Aug 2022

Demarcation plan

1 file
Demarcation Plan15 Jun 2023

Building plans

13 files
Standard Designs-Block-H-7X17(TYPE-A)H0315 Jun 2023Standard Designs-Block-H-7X17(TYPE-D1)H0215 Jun 2023Standard Designs-Block-H-11X17(TYPE-A+D1)H0115 Jun 2023

Services

Sewerage and drainage

2 files
Drainage Plan15 Jun 2023Sewerage Scheme15 Jun 2023

Water supply

2 files
Water Supply Plan15 Jun 2023Water Supply Scheme15 Jun 2023

Roads

1 file
Road Work Plan15 Jun 2023

Service plans

2 files
Service Estimates Report 114NXT15 Jun 2023Service Plans on the Layout30 Aug 2022

Approvals and clearances

Completion certificate (CC)

1 file
CC uploaded7 Oct 2025

DTCP licence

1 file
Licence Copy with Land Schedule30 Aug 2022

Other NOCs and clearances

1 file
Forest NOC30 Aug 2022

Land records

Land records

10 files
Collaboratiion Agreements-Bailiwick Builders Registered on 12-Dec-1215 Jun 2023Collaboratiion Agreements-Logical Estates Registered on 12-Dec-1215 Jun 2023Collaboratiion Agreements-Sharyans Buildcon Registered on 12-Dec-1215 Jun 2023

Sales papers

Allotment and sale agreements

1 file
Buyer Agreement Format20 Jul 2022

Money

Accounts and finance

4 files
Cash Flow Statement15 Jun 2023CA Certificate Cost and Equity15 Jun 2023CA Certificate on the Application’s Figures16 Aug 2022Non-Default Certificate from a CA18 Jul 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit25 Aug 2022

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

130 OF 2022 · Emaar India Limited · GURGAON-MANESAR

Licence valid to 23 Aug 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 6 Sept 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

130 OF 2022: 29 parcels, 11.4 acres in all, in Bajghera (hadbast 61), tehsil Gurgaon.

The licence register prints the same licensed area, 11.4 acres.

  • 5//204 kanal 4 marla
  • 5//21/110 marla
  • 5//21/25 kanal 14 marla
  • 5//2616 marla
Show the other 25 parcels
  • 6//12/2/21 kanal 14 marla
  • 6//13/24 kanal 17 marla
  • 6//14/53 kanal 7 marla
  • 6//15/33 kanal 1 marla
  • 6//167 kanal 15 marla
  • 6//178 kanal
  • 6//18/1/11 kanal 1 marla
  • 6//18/1/23 kanal 10 marla
  • 6//18/23 kanal 1 marla
  • 6//19/1/116 marla
  • 6//19/1/24 kanal
  • 6//22/25 kanal 2 marla
  • 6//22/31 kanal 6 marla
  • 6//23/110 marla
  • 6//23/26 kanal 13 marla
  • 6//24/112 marla
  • 6//24/21 kanal 13 marla
  • 6//24/32 kanal 14 marla
  • 6//25/113 marla
  • 6//25/25 kanal 17 marla
  • 14//41 kanal 9 marla
  • 14//5/1/14 kanal 14 marla
  • 14//5/1/213 marla
  • 15//1/1/16 kanal 6 marla
  • 15//1/1/216 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Bajghera (hadbast 61), tehsil Gurgaon. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 5//20.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan30 Aug 2022

Layout plan

1 file
Latest Layout Plan30 Aug 2022

Building plans

13 files
Standard Designs-Block-H-7X17(TYPE-A)H0315 Jun 2023Standard Designs-Block-H-7X17(TYPE-D1)H0215 Jun 2023Standard Designs-Block-H-11X17(TYPE-A+D1)H0115 Jun 2023Standard Designs-Block-H-12X18(TYPE-A+b)15 Jun 2023Standard Designs-Block-F-6X20(TYPE-(A2-F11,12)15 Jun 2023Standard Designs-Block-F-6X20(TYPE-(B1-2,10,14),(C-4,8,16,22),(D1-5,7,17,19,21,25),(E1-6,18,20)15 Jun 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (42 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2016 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emaar India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.