Skip to content

The Corridors (Phase 2)

by Ireo Grace Realtech · Sector 67, Gurugram

Not on our price list yet

About this project

Key facts

Location
Sector 67, Gurugram0.7 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
7,083 sq ft
In m²about 658–658 m², as declared
Registered
7 Dec 2017
Registered by
IREO GRACE REALTECH PRIVATE LIMITEDthe company that filed it, for Ireo Grace Realtech
Timeline
  1. 31 May 2013Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 7 Dec 2017Registered with HARERAHARERA, read 4 Nov 2026
  3. 30 Jun 2021Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

658homes, 7,083 to 7,083 sq ft of carpet area
  • 3,000 sq ft and above7,083 sq ft658

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenModular kitchen with hob, HOOD, solid surface counter top, stainless steel sink and CP fittings/vitrifies tiles/acrylic emulsion
  • Kitchen appliancesModular kitchen with hob, HOOD, stainless steel sink and CP fittings
  • FloorsStone/ wooden/ tiles
  • WallsPaint
  • BathroomsChinaware, CP fittings,
  • WindowsPowder-coated aluminium windows with single glass
  • Main doorECO door (veneered)
  • Wi-Fi and broadbandProvided

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 67, GurugramSector 67, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.7 km
  • Delhi–Gurugram–SNB RRTS7.0 km
  • Dwarka ExpresswayOpen, 17 Aug 20257.0 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 3 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 2
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is The Corridors (Phase 2) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 377 OF 2017, registered on 7 Dec 2017. Ended 30 Jun 2021. The register shows it as: Registration expired.

The source ↗
How is the connectivity around The Corridors (Phase 2)?From the records · Map pin and road lines, read 6 Sep 2026

The Corridors (Phase 2) is in Sector 67, Gurugram; the site address declared to HARERA is Sector-67-A, Gurugram. In a straight line it is about 0.7 km from Sohna Elevated Corridor (NH-248A), 7.0 km from Delhi–Gurugram–SNB RRTS and 7.0 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building The Corridors (Phase 2)?From the records · HARERA, read 4 Nov 2026

The Corridors (Phase 2) is a Ireo Grace Realtech project, registered by its company IREO GRACE REALTECH PRIVATE LIMITED.

The source ↗Ireo Grace Realtech's projects and court record
What protections do I have as a buyer?General guidance

Under the RERA Act, a registered project has to keep most of the money buyers pay in a separate bank account for that project, sell by carpet area, and stick to the plans it registered unless enough buyers agree to a change. If possession is late, a buyer can ask HARERA for interest or a refund. How this applies to your own purchase depends on your agreement, so ask a lawyer before you sign.

The records

What the registers hold for The Corridors (Phase 2): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 377 OF 2017: Registration expired. Ended 30 Jun 2021.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 5 OF 2013 is on the DTCP register, valid to 20 Feb 2031.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: building plans 31 May 2013.Declared to HARERA, read 29 Oct 2026
The court record of Ireo Grace Realtech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Jun 2021. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 21 HARERA files, with the dates we read them
Registration no.
377 OF 2017
Registration date
7 Dec 2017
Registration valid till
30 Jun 2021

Declared by the promoter to HARERA

Land area
13.152 (Acre) (53,224.26 sq m)
FAR
the application prints 175, which is not a ratio
licence
5 of 2013 Dated 21.02.2013
Estimated project cost
₹798.83 crore
Cost of land
₹118.29 crore
Building plans, declared approved
31 May 2013
Declared inventory · 1 type

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type FLATS · 658 units · 658 sq m carpet · one flat
Statutory approvals, as declared · 9

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (22 Feb 2012)
  • II. FOREST NOC — declared: already been obtained (30 Oct 2013)
  • III. AIRPORT AUTHORITY OF INDIA NOC — declared: already been obtained (1 May 2013)
  • IV. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (2 Jul 2013)
  • V. ENVIRONMENT CLEARANCE — declared: already been obtained (12 Dec 2013)
  • VI. CONSENT TO ESTABLISH — declared: already been obtained (18 Feb 2014)
  • VII. MINING PERMISSION — declared: already been obtained (4 Mar 2014)
  • VIII. FIRE SCHEME APPROVAL — declared: already been obtained (27 Nov 2014)
  • IX. SERVICE ESTIMATES AND PLANS APPROVALS — declared: already been obtained (9 Dec 2014)
On file with HARERA · 21 files

On file with HARERA (21)

Plans

Site plan

1 file
Approved Site Plan8 May 2024

Layout plan

1 file
Latest Layout Plan8 May 2024

Zoning plan

1 file
Zoning Plan8 May 2024

Demarcation plan

1 file
Demarcation Plan8 May 2024

Building plans

2 files
Building Plan8 May 2024Approved Building Plans, Full Set8 May 2024

Services

Service plans

1 file
Service Plans on the Layout8 May 2024

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded22 Jul 2024Occupation Certificate8 May 2024

DTCP licence

1 file
Licence Copy with Land Schedule8 May 2024

Environment clearance

2 files
EC Letter8 May 2024Environmental Clearance8 May 2024

Other NOCs and clearances

2 files
NOC for Aravali8 May 2024Issue of Consent to Establish from Pollution Angle8 May 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration8 May 2024

Money

Accounts and finance

3 files
CA Certificate on the Application’s Figures8 May 2024Cash Flow Statement8 May 2024Non-Default Certificate from a CA8 May 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit8 May 2024

HARERA’s orders

HARERA’s orders

1 file
Extension No. 1 of 2021 Dated-04.01.20218 Jan 2021

Other filings

Other filings

1 file
Mou8 May 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

5 OF 2013 · Precision Realtors Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 20 Feb 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 3 Jun 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

5 OF 2013: 54 parcels, 37.5125 acres in all, in Madabass (hadbast 87) and Dhaoumanspur (hadbast 86), tehsil Badshahpur.

The licence register prints the same licensed area, 37.51 acres.

  • 69//25/216 marlaMadabass (87)
  • 70//55 kanal 12 marlaMadabass (87)
  • 70//63 kanal 9 marlaMadabass (87)
  • 71//18 kanalMadabass (87)
Show the other 50 parcels
  • 71//107 kanal 14 marlaMadabass (87)
  • 71//111 kanal 7 marlaMadabass (87)
  • 71//28 kanalMadabass (87)
  • 71//3/11 kanalMadabass (87)
  • 71//3/22 kanal 4 marlaMadabass (87)
  • 71//93 kanal 11 marlaMadabass (87)
  • 68//21/27 kanal 16 marlaMadabass (87)
  • 68//228 kanalMadabass (87)
  • 68//235 kanal 10 marlaMadabass (87)
  • 69//25/116 marlaMadabass (87)
  • 3//15/11 kanal 5 marlaDhaoumanspur (86)
  • 3//15/26 kanal 7 marlaDhaoumanspur (86)
  • 3//58 kanalDhaoumanspur (86)
  • 3//68 kanalDhaoumanspur (86)
  • 3//14/25 kanal 16 marlaDhaoumanspur (86)
  • 3//167 kanal 12 marlaDhaoumanspur (86)
  • 3//178 kanalDhaoumanspur (86)
  • 3//185 kanal 12 marlaDhaoumanspur (86)
  • 3//226 kanal 2 marlaDhaoumanspur (86)
  • 3//238 kanalDhaoumanspur (86)
  • 3//247 kanal 11 marlaDhaoumanspur (86)
  • 3//257 kanal 4 marlaDhaoumanspur (86)
  • 4//18 kanalDhaoumanspur (86)
  • 4//108 kanalDhaoumanspur (86)
  • 12//103 kanal 12 marlaDhaoumanspur (86)
  • 12//127 kanal 2 marlaDhaoumanspur (86)
  • 12//138 kanalDhaoumanspur (86)
  • 12//148 kanalDhaoumanspur (86)
  • 12//158 kanalDhaoumanspur (86)
  • 12//178 kanalDhaoumanspur (86)
  • 12//18/14 kanalDhaoumanspur (86)
  • 12//18/23 kanalDhaoumanspur (86)
  • 12//18/31 kanalDhaoumanspur (86)
  • 12//193 kanal 18 marlaDhaoumanspur (86)
  • 12//28 kanal 4 marlaDhaoumanspur (86)
  • 12//221 kanal 16 marlaDhaoumanspur (86)
  • 12//237 kanal 11 marlaDhaoumanspur (86)
  • 12//247 kanal 11 marlaDhaoumanspur (86)
  • 12//3/14 marlaDhaoumanspur (86)
  • 12//3/23 kanal 14 marlaDhaoumanspur (86)
  • 12//3/33 kanal 14 marlaDhaoumanspur (86)
  • 12//48 kanalDhaoumanspur (86)
  • 12//58 kanalDhaoumanspur (86)
  • 12//68 kanalDhaoumanspur (86)
  • 12//78 kanalDhaoumanspur (86)
  • 12//8/11 kanal 8 marlaDhaoumanspur (86)
  • 12//8/26 kanal 12 marlaDhaoumanspur (86)
  • 12//98 kanalDhaoumanspur (86)
  • 13//35 kanal 8 marlaDhaoumanspur (86)
  • 68//21/14 marlaMadabass (87)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Madabass (hadbast 87) or Dhaoumanspur (hadbast 86), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 69//25/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,400 per sq ft

Sector 67, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan8 May 2024

Layout plan

1 file
Latest Layout Plan8 May 2024

Building plans

2 files
Building Plan8 May 2024Approved Building Plans, Full Set8 May 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (21 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2941 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ireo Grace Realtech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.