Skip to content

ASHIANA AMARAH PHASE 4

by Ashiana Housing · Sector 93, Gurugram

Not on our price list yet

Possession 30 Apr 2029 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight line
Registered by
ASHIANA HOUSING LIMITEDthe company that filed it, for Ashiana Housing
Timeline
  1. 9 Feb 2024Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Apr 2029Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside17,784 m² in all, by use
  • Parks and playgrounds5,850 m² · 33%
  • Parking4,113 m² · 23%
  • Roads3,775 m² · 21%
  • Apartment buildings3,229 m² · 18%
  • Green belts650 m² · 4%
  • Other usesas the form names them: Street lighting, Stromwaterdrainage168 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision for fixing of window/split AIR conditioner in drawing dining area & bedrooms are being provided. for split a/C assigned spaces are earmarked on the elevation of the building for EASE of access and to create uniformity for aesthetic purpose.(E) copper piping installation for split AC’S of suitable length along with MS brackett or stand for outdoor units
  • Kitchen appliances1 stainless steel sink with one bowl and a drain board,(B) 1 swivel type sink mixer, kitchen cabinets with hob, chimney, dishwasher. geyser & exhaust fan
  • Windows2 to 3 track aluminum/UPVC framed window, with 2 to 3 sliding panels depending UPON SIZE with 5/6MM toughened glass and provision for FLY MESH shutter.top hung/louvered with frosted glass/PIN HEAD no FLY MESH shutter is being provided.
  • Main door1 HOUR FIRE rated MS/ wooden / MS in wooden finish shutter with handle and LOCK system
  • Electrical fittings(a) all electrical wiring in concealed conduits with copper wires. convenient position & distribution of light and power plugs and provision for electrical chimney above platform and water purifier point in kitchen.(B) modular electrical switches with sockets and fan regulators of SSK/anchor/panasonic/north WEST/legrand or equivalent
  • Wi-Fi and broadbandProvision for internet router WILL be DONE at suitable location inside apartments & facility for video door phone WILL be DONE at suitable location inside apartments

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 11 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 7

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ASHIANA AMARAH PHASE 4 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/845/577/2024/72. Valid to 30 Apr 2029.

The source ↗
What is the possession timeline for ASHIANA AMARAH PHASE 4?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Apr 2029. Its registration runs to 30 Apr 2029; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ASHIANA AMARAH PHASE 4?From the records · Map pin and road lines, read 6 Sep 2026

ASHIANA AMARAH PHASE 4 is in Sector 93, Gurugram; the site address declared to HARERA is Revenue Estate Of Village- Wazirpur, Sector 93, Distt. Gurugram, Haryana. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ASHIANA AMARAH PHASE 4?From the records · HARERA, read 4 Nov 2026

ASHIANA AMARAH PHASE 4 is a Ashiana Housing project, registered by its company ASHIANA HOUSING LIMITED.

The source ↗Ashiana Housing's projects and court record

The records

What the registers hold for ASHIANA AMARAH PHASE 4: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/845/577/2024/72: Registered. Valid to 30 Apr 2029.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 41 OF 2010 is on the DTCP register, valid to 6 Jun 2031.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 9 Feb 2024, building plans 9 Feb 2024.Declared to HARERA, read 29 Oct 2026
The court record of Ashiana Housing’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 50 HARERA files, with the dates we read them
Registration no.
GGM/845/577/2024/72
Registration valid till
30 Apr 2029
Declared possession
30 Apr 2029

Declared by the promoter to HARERA

Land area
4.395 (Acre) (17,785.93 sq m)
FAR
the application prints 182.98, which is not a ratio
licence
I hereby declare that the above information and particulars are based on record and are true to the best of my knowledge and belief and nothing has been concealed.
Estimated project cost
₹307.03 crore
Cost of land
₹16.75 crore
Layout plan, declared approved (field 5a)
9 Feb 2024
Building plans, declared approved
9 Feb 2024
Construction to start
15 Sept 2024
Completion declared for
30 Apr 2029
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 280 units · 3,14,440 sq m carpet · 5 towers
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. ENVIRONMENTAL CLEARANCE — declared: already been obtained (26 Nov 2021)
  • II. FOREST NOC — declared: already been obtained (12 Dec 2021)
  • III. PORTABLE WATER ASSURANCE — declared: already been obtained (4 Aug 2021)
  • IV. AIRPORT AUTHORITY OF INDIA NOC — declared: already been obtained (6 Aug 2021)
  • V. CONSTRUCTION WATER NOC — declared: already been obtained (23 Jul 2021)
  • VI. LICENSE OF 41 OF 2010 — declared: already been obtained (7 Jun 2010)
  • VII. ELECTRIFICATION PLAN — declared: already been obtained (11 Dec 2023)
  • VIII. BUILDING PLAN APPROVAL LETTER (BR-III) — declared: already been obtained (9 Feb 2024)
On file with HARERA · 50 files

On file with HARERA (50)

Plans

Site plan

5 files
Site Plan23 Mar 2024Site Plan - Services23 Mar 2024Site Plan - Green23 Mar 2024

Layout plan

1 file
Latest Layout Plan22 Mar 2024

Zoning plan

1 file
Zoning Plan22 Mar 2024

Demarcation plan

1 file
Demarcation Plan22 Mar 2024

Building plans

8 files
Approved Building Plans, Full Set3 May 20243 + 3T Type Typical & Terrace Plan & Area Calculations (Tower - 2, 5, 7, 9, 10, 13, 15, 16 & 20)"23 Mar 20243+2T Type Elevationss A & B (Tower -1,8,11,12,14,19 & 2123 Mar 2024

Floor plans

13 files
4 + 4T Type Stilt & First Floor Plan & Area Calculations (Tower - 4)23 Mar 2024Basement 2 Plan and Area Calculations23 Mar 2024Floor Plan23 Mar 2024

Services

Sewerage and drainage

1 file
Drainage Plan23 Mar 2024

Water supply

1 file
Water Supply Plan23 Mar 2024

Electricity

4 files
Street Light Plan23 Mar 2024Electricity Supply Plan23 Mar 2024External Electrification Plan23 Mar 2024Approval of Electrification Plan23 Mar 2024

Landscape and green areas

1 file
Landscape Plan23 Mar 2024

Service plans

2 files
Solid Waste Management Plan23 Mar 2024Service Plans on the Layout22 Mar 2024

Approvals and clearances

DTCP licence

3 files
Renewal of License 41 of 201023 Mar 2024LC-IV23 Mar 2024Licence Copy with Land Schedule22 Mar 2024

Environment clearance

1 file
Environment Clearance23 Mar 2024

Fire safety

1 file
Revised Fire Scheme3 May 2024

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration22 Mar 2024

Money

Accounts and finance

5 files
Copy of Demand Draft Deficit Fee PH.44 Jul 2024Cash Flow Statement7 May 2024CA Certificate on the Application’s Figures7 May 2024

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit4 Jul 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

41 OF 2010 · Ramprastha Estates Pvt Ltd · GURGAON-MANESAR

Licence valid to 6 Jun 2031

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 17 May 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

41 OF 2010: 35 parcels, 22.3437 acres in all, in Wazirpur (hadbast 115), tehsil Harsaru.

The licence register prints the same licensed area, 22.3425 acres.

  • 86//1/14 kanal
  • 86//1/24 kanal
  • 86//10/14 kanal
  • 86//10/24 kanal
Show the other 31 parcels
  • 86//118 kanal
  • 86//128 kanal
  • 86//13/1 mi5 kanal 6 marla
  • 86//14min4 kanal 7 marla
  • 86//15min1 kanal 7 marla
  • 86//19min4 kanal 8 marla
  • 86//28 kanal
  • 86//38 kanal
  • 86//4min8 kanal 3 marla
  • 86//6 min4 kanal 15 marla
  • 86//7/16 kanal
  • 86//7/22 kanal
  • 86//88 kanal
  • 86//98 kanal
  • 83//16/22 kanal 10 marla
  • 83//17/22 kanal 10 marla
  • 83//18/47 marla
  • 83//23/11 kanal 12 marla
  • 83//23/26 kanal 8 marla
  • 83//248 kanal
  • 83//258 kanal
  • 83//18/22 kanal 2 marla
  • 84//20/14 kanal
  • 84//20/2/16 marla
  • 84//20/2/23 kanal 14 marla
  • 84//21/14 kanal
  • 84//21/24 kanal
  • 84//228 kanal
  • 84//237 kanal
  • 87//58 kanal
  • 87//68 kanal

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Wazirpur (hadbast 115), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 86//1/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “Ashiana Amarah Phase 4”, by M/s Ashiana Housing Limited, code Gurgaon-0526-007221, approved 2026.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

5 files
Site Plan23 Mar 2024Site Plan - Services23 Mar 2024Site Plan - Green23 Mar 2024Site Plan - Parking23 Mar 2024Approved Site Plan22 Mar 2024

Layout plan

1 file
Latest Layout Plan22 Mar 2024

Building plans

8 files
Approved Building Plans, Full Set3 May 20243 + 3T Type Typical & Terrace Plan & Area Calculations (Tower - 2, 5, 7, 9, 10, 13, 15, 16 & 20)"23 Mar 20243+2T Type Elevationss A & B (Tower -1,8,11,12,14,19 & 2123 Mar 2024Elevation Plan23 Mar 20243+2T Type Typical & Terrace Plan & Area Calculations (Tower-1,3,6,8,11,12,14,17,19, & 21)23 Mar 2024Sections and Elevations (Primary School)23 Mar 2024

Floor plans

13 files
4 + 4T Type Stilt & First Floor Plan & Area Calculations (Tower - 4)23 Mar 2024Basement 2 Plan and Area Calculations23 Mar 2024Floor Plan23 Mar 2024Basement 1 Plan and Area Calculations23 Mar 20243+3T Type Stilt & First Floor Plan & Area Calculations (Tower - 5,7,9,10,15 & 1623 Mar 2024Podium Plan and Area Calculations23 Mar 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (50 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2866 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ashiana Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.