Skip to content

ROF ATULYAS

by Pegasus Land and Housing · Sector 93, Gurugram

Not on our price list yet

Possession 31 Jul 2025 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
469–643 sq ft
In m²about 44–60 m², as declared
Registered
29 Jan 2021
Registered by
PEGASUS LAND AND HOUSING PRIVATE LIMITEDthe company that filed it, for Pegasus Land and Housing
Timeline
  1. 12 Jan 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 29 Jan 2021Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Jul 2025Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 31 Dec 2025Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

726homes, 469 to 643 sq ft of carpet area
  • Under 1,000 sq ft469–643 sq ft726

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.034 acres in all, by use
  • Parks and playgrounds1.24 acres · 25%
  • Parking1.167 acres · 23%
  • Apartment buildings1.149 acres · 23%
  • Roads0.509 acres · 10%
  • Pavements0.509 acres · 10%
  • Other usesas the form names them: Area, Area0.355 acres · 7%
  • Electricity sub-station0.103 acres · 2%
  • Sewage and waste treatment0.003 acres · under 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningNot provided
  • KitchenCeramic tiles, paint, green marble, sink
  • Kitchen appliancesNot provided
  • Lifts12-13 passenger with ARD
  • WardrobesNot provided
  • FloorsCeramic/vitrified tiles
  • WallsGypsum plaster
  • BathroomsPART ceramic tiles, PART false ceiling

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 3
  • Other register states: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is ROF ATULYAS registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/437/169/2021/05, registered on 29 Jan 2021. The register’s record shows an end date of 31 Dec 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for ROF ATULYAS?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Jul 2025. Its registration runs to 31 Dec 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ROF ATULYAS?From the records · Map pin and road lines, read 6 Sep 2026

ROF ATULYAS is in Sector 93, Gurugram; the site address declared to HARERA is Village Hyatpur, Sector 93. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ROF ATULYAS?From the records · HARERA, read 4 Nov 2026

ROF ATULYAS is a Pegasus Land and Housing project, registered by its company PEGASUS LAND AND HOUSING PRIVATE LIMITED.

The source ↗Pegasus Land and Housing's projects and court record

The records

What the registers hold for ROF ATULYAS: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/437/169/2021/05: Registration lapsed. The register’s record shows an end date of 31 Dec 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 19 OF 2020 is on the DTCP register, valid to 31 Jul 2027.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 12 Jan 2021, building plans 12 Jan 2021.Declared to HARERA, read 29 Oct 2026
The court record of Pegasus Land and Housing’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 31 Dec 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 45 HARERA files, with the dates we read them
Registration no.
GGM/437/169/2021/05
Registration date
29 Jan 2021
Registration valid till
31 Dec 2025
Declared possession
31 Jul 2025

Declared by the promoter to HARERA

Land area
5.03403 (Acre) (20,372 sq m)
FAR
2.37 proposed of 2.37 permissible
licence
19 of 2020 (01-08-2020)
Estimated project cost
₹161.30 crore
Cost of land
₹11.69 crore
Layout plan, declared approved (field 5a)
12 Jan 2021
Building plans, declared approved
12 Jan 2021
Construction to start
1 Feb 2021
Completion declared for
31 Jul 2025
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 268 units · 59.59 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 254 units · 59.75 sq m carpet · 5 towers · one flat
  • Apartment/Shops/Other Buildings · 112 units · 46.69 sq m carpet · 2 towers · one flat
  • Apartment/Shops/Other Buildings · 92 units · 43.53 sq m carpet · 2 towers · one flat
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (1 Aug 2020)
  • II. BUILDING PLAN APPROVAL — declared: already been obtained (12 Jan 2021)
  • III. ZONING — declared: already been obtained (5 Aug 2020)
On file with HARERA · 45 files

On file with HARERA (45)

Plans

Site plan

4 files
Co-Ordinated Services Site Plan Sec 9327 Jan 2021Superimposed Demarcation Site Plan Sec 9327 Jan 2021Site Plan-9322 Jan 2021Approved Site Plan29 Dec 2020

Layout plan

1 file
Latest Layout Plan22 Jan 2021

Zoning plan

1 file
Zoning Plan29 Dec 2020

Demarcation plan

1 file
Demarcation Plan22 Jan 2021

Building plans

11 files
Tower- 3 & 5 Elevation Plan22 Jan 2021Tower- 6 & 7 Elevation Plan22 Jan 2021Tower-1 Elevation22 Jan 2021

Floor plans

10 files
Tower- 3 & 5 Floor Plan Sheet 222 Jan 2021Tower- 3 & 5 Floor Plan22 Jan 2021Tower- 3& 5 Floor Plan Sheet 322 Jan 2021

Services

Landscape and green areas

1 file
Parking & Green Area Detail22 Jan 2021

Service plans

1 file
Applied Copy of Services Estimate22 Jan 2021

Approvals and clearances

DTCP licence

3 files
LC- IV & LC- IV A22 Jan 2021LOI22 Jan 2021Licence Copy with Land Schedule12 Dec 2020

Land records

Land records

3 files
Revenue Record Entry of Licence and Collaboration22 Jan 2021Aks- Sazra22 Jan 2021Non Encumbrance Certificate22 Jan 2021

Money

Accounts and finance

4 files
CA Certificate Equity by Promoter27 Jan 2021Cash Flow Statement22 Jan 2021CA Certificate Rep-I22 Jan 2021Non-Default Certificate from a CA29 Dec 2020

The promoter’s papers

Declarations and affidavits

3 files
Affidavit by Promoter22 Jan 2021Bank Undertaking22 Jan 2021The Promoter’s Declaration on Affidavit29 Dec 2020

Other filings

Other filings

2 files
Anganwadi & Community22 Jan 2021Commercial Plan22 Jan 2021

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

19 OF 2020 · PEGASUS LAND AND HOUSING PVT LTD · GURGAON-MANESAR

Licence valid to 31 Jul 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Jan 2021 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

19 OF 2020: 10 parcels, 5.034 acres in all, in Hayatpur (hadbast 114), tehsil Harsaru.

The licence register prints the same licensed area, 5.034 acres.

  • 32//127 kanal 18 marla
  • 32//122 marla
  • 32//13/14 kanal
  • 32//13/23 kanal 18 marla
Show the other 6 parcels
  • 32//13/22 marla
  • 32//188 kanal
  • 32//19/11 kanal 2 marla
  • 32//3/2/2 min1 kanal 14 marla 3 sarsai
  • 32//8min7 kanal 7 marla 6 sarsai
  • 32//9/2 min6 kanal 1 marla 4 sarsai

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Hayatpur (hadbast 114), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 32//12.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹7,000 per sq ft

Sector 93, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “ROF ATULYAS”, by M/s Pegasus Land & Housing Pvt. Ltd., code Gurgaon-0521-001832, approved 2021.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Co-Ordinated Services Site Plan Sec 9327 Jan 2021Superimposed Demarcation Site Plan Sec 9327 Jan 2021Site Plan-9322 Jan 2021Approved Site Plan29 Dec 2020

Layout plan

1 file
Latest Layout Plan22 Jan 2021

Building plans

11 files
Tower- 3 & 5 Elevation Plan22 Jan 2021Tower- 6 & 7 Elevation Plan22 Jan 2021Tower-1 Elevation22 Jan 2021Tower-2 Elevation22 Jan 2021Tower-4 Elevation Plan22 Jan 2021Tower-1 Section22 Jan 2021

Floor plans

10 files
Tower- 3 & 5 Floor Plan Sheet 222 Jan 2021Tower- 3 & 5 Floor Plan22 Jan 2021Tower- 3& 5 Floor Plan Sheet 322 Jan 2021Tower- 4 Floor Plan Sheet 222 Jan 2021Tower- 4 Floor Plan22 Jan 2021Tower-1 Floor Plan22 Jan 2021

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (45 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1500 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pegasus Land and Housing

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.