Skip to content

Orchard Avenue-2

by Signature Builders · Sector 93, Gurugram

Not on our price list yet

Possession 30 Sep 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 93, Gurugram3.1 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
about 582 sq ft
In m²about 54.1 m², the average flat, as declared
Registered
11 Sep 2019
Registered by
SIGNATURE BUILDERS PRIVATE LIMITEDthe company that filed it, for Signature Builders
Timeline
  1. 11 Sep 2019Registered with HARERAHARERA, read 4 Nov 2026
  2. 30 Sep 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Sep 2024Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside5.088 acres in all, by use
  • Roads2.85 acres · 56%
  • Apartment buildings1.17 acres · 23%
  • Green belts0.755 acres · 15%
  • Other uses0.22 acres · 4%
  • Electricity sub-station0.093 acres · 2%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenISI marked
  • FloorsVitrified & ceramic tiles
  • WallsOBD
  • BathroomsISI marked
  • WindowsUPVC
  • Main doorFlush door
  • Electrical fittingsISI marked
  • Water storageISI marked

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 93, GurugramSector 93, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20253.1 km
  • Delhi–Gurugram–SNB RRTS4.8 km
  • Sohna Elevated Corridor (NH-248A)10.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 7 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Orchard Avenue-2 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/357/89/2019/51, registered on 11 Sep 2019. Ended 30 Sep 2024. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Orchard Avenue-2?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2023. Its registration runs to 30 Sep 2024; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Orchard Avenue-2?From the records · Map pin and road lines, read 6 Sep 2026

Orchard Avenue-2 is in Sector 93, Gurugram; the site address declared to HARERA is Village Hayatpur Sector 93 Gurugram Haryana. In a straight line it is about 3.1 km from Dwarka Expressway, 4.8 km from Delhi–Gurugram–SNB RRTS and 10.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Orchard Avenue-2?From the records · HARERA, read 4 Nov 2026

Orchard Avenue-2 is a Signature Builders project, registered by its company SIGNATURE BUILDERS PRIVATE LIMITED.

The source ↗Signature Builders's projects and court record

The records

What the registers hold for Orchard Avenue-2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/357/89/2019/51: Registration expired. Ended 30 Sep 2024.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 51 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 5 Mar 2025.DTCP, read 3 Nov 2026
The court record of Signature Builders’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 30 Sep 2024. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 51 OF 2019 lapsed

    Named in this project’s application. Valid to 5 Mar 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 14 HARERA files, with the dates we read them
Registration no.
GGM/357/89/2019/51
Registration date
11 Sept 2019
Registration valid till
30 Sept 2024
Declared possession
30 Sept 2023

Declared by the promoter to HARERA

Land area
5.0 (Acre) (20,234.28 sq m)
FAR
the application prints 227.97, which is not a ratio
licence
51 of 2019 dated 06.03.2019
Estimated project cost
₹173.80 crore
Cost of land
₹28.31 crore
Construction to start
1 Oct 2019
Completion declared for
30 Sept 2023
Declared inventory · 7 types

Declared inventory

  • Apartment/Shops/Other Buildings · 112 units · 6,022.139 sq m carpet · total for 112 flats, about 53.8 m² each
  • Apartment/Shops/Other Buildings · 112 units · 6,022.139 sq m carpet · total for 112 flats, about 53.8 m² each
  • Apartment/Shops/Other Buildings · 112 units · 6,022.139 sq m carpet · total for 112 flats, about 53.8 m² each
  • Apartment/Shops/Other Buildings · 112 units · 6,022.139 sq m carpet · total for 112 flats, about 53.8 m² each
  • Apartment/Shops/Other Buildings · 112 units · 6,452.292 sq m carpet · total for 112 flats, about 57.6 m² each
  • Apartment/Shops/Other Buildings · 120 units · 6,022.139 sq m carpet · total for 120 flats, about 50.2 m² each
  • Apartment/Shops/Other Buildings · 40 units · 2,383.314 sq m carpet · total for 40 flats, about 59.6 m² each
Statutory approvals, as declared · 7

Statutory approvals, as declared

  • I. LICENSE 51 OF 2019 — declared: already been obtained (6 Mar 2019)
  • II. WATER CONSENT — declared: already been obtained (29 Mar 2019)
  • III. ARAVALI NOC — declared: already been obtained (26 Mar 2019)
  • IV. FOREST CLARIFICATION — declared: already been obtained (7 Feb 2019)
  • V. WATER ASSURANCE — declared: already been obtained (28 Mar 2019)
  • VI. SEWER ASSURANCE — declared: already been obtained (1 Apr 2019)
  • VII. AIRPORT NOC — declared: already been obtained (25 Mar 2019)
On file with HARERA · 14 files

On file with HARERA (14)

Plans

Site plan

2 files
Site Plan9 Sept 2019Approved Site Plan16 Apr 2019

Layout plan

1 file
Latest Layout Plan16 Apr 2019

Zoning plan

1 file
Zoning Plan16 Apr 2019

Demarcation plan

1 file
Demarcation Plan16 Apr 2019

Building plans

1 file
Approved Building Plans, Full Set16 Apr 2019

Services

Service plans

1 file
Service Plans on the Layout16 Apr 2019

Approvals and clearances

Occupation certificate (OC)

1 file
Occupation Certificate17 Jul 2024

DTCP licence

1 file
Licence Copy with Land Schedule16 Apr 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration16 Apr 2019

Money

Accounts and finance

3 files
Cash Flow Statement16 Apr 2019CA Certificate on the Application’s Figures16 Apr 2019Non-Default Certificate from a CA16 Apr 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Apr 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

51 OF 2019 · SIGNATURE BUILDERS PVT. LTD. · GURGAON-MANESAR

Licence valid to 5 Mar 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Apr 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

51 OF 2019

DTCP’s page showed no land schedule for licence 51 OF 2019 when Bhumiq read it on 18 Oct 2026. verify at source

Collector rate, residential flat
₹7,000 per sq ft

Sector 93, collector rates effective 1 Apr 2026, Harsaru tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Lenders that list this project

  • PNB Housing Finance’s approved-projects list carries “ORCHARD AVENUE 2”, by M/s Signature Builders Pvt. Ltd., code Gurgaon-1219-001256, approved 2019.

    PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗

A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan9 Sept 2019Approved Site Plan16 Apr 2019

Layout plan

1 file
Latest Layout Plan16 Apr 2019

Building plans

1 file
Approved Building Plans, Full Set16 Apr 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (14 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/580 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Signature Builders

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.